Ignition Test of Auxiliary Boiler

NO.CNEEC-NEPRI-REPORT-BOILER-01-05 Date: 13 - Oct – 2011


Subsystem: Auxiliary boiler system
Start Time: 10 - Oct – 2011 8:30 Finish Time: 11 - Oct – 2011 17:00
Work Item: Ignition test
NO. Check Items Check Results
Finish servicing power to the equipment of auxiliary
1 Yes □ No □
boiler
Finish servicing power to the control system of auxiliary
2 Yes □ No □
boiler
3 Check the equipment of auxiliary boiler is OK Yes □ No □
Finish feeding water to boiler, the level of drum is
4 Yes □ No □
ignition need
5 Push the button of boiler ignition Yes □ No □
6 The auxiliary boiler starts the process of ignition Yes □ No □
7 Blower running , setting up the pressure of the air Yes □ No □
8 Oil supply pump running ,supplying the oil of ignition Yes □ No □
Open the magnetic valve of the ignition gun, the gun
9 Yes □ No □
ignites successfully
Open the feeding oil magnetic valve and returning oil
10 Yes □ No □
magnetic valve of the oil burner
The oil burner ignites successfully and the flame
11 Yes □ No □
detector detects the fire
12 The ignition test is finished Yes □ No □