Package. 11BJB01 (PDB For ACC-1) Desc. Location ACC-1 Electrical Building S. No. Comment Description Category Remarks 1 Torque tightning mark to be applied of the incomer cables after torque. C 2 Firestop board downside the panel (General ) C 3 Cable dressing work inside the building (General ) to be completed . C 4 For vertical cables SS cable ties to be provided . C 5 Cable tags downside of the panel to be provided for cables identification. C 6 Cables arrangement in the trefoil manner with Stainless Steel cable ties in the route. C 7 Control cables LV Switchgear side (ECMS ) Gland plate closed with sealing . C 8 Cable tray prefix numbering to be provided . C