Jubail complex Update up 28 May May Classic WBS Layout 01-Jun-20 15:15

Activity ID Activity Name Original Remaining Schedule % Start Finish Total February 2020 March 2020 April 2020 May 2020 June 2020 July 2020 August 2020 September 2020 October 2020 November 2020 December 2020 January 2021 February 2021 March 2021 April 2021 May 2021 June 2021 July 2021 August 2021
Duration Duration Complete Float 02 09 16 23 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 05 12 19 26 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01
05-Jul-21, Al Ihsaa- Educational Complex i n Al Jubail
Al Ihsaa- Educational Complex514 443
in Al Jubail 0.21% 02-Mar-20 A 05-Jul-21 -71

Milestones 514 39 0% 02-Mar-20 A 05-Jul-21 -71 05-Jul-21, Milestones

General 514 0 0% 02-Mar-20 A 05-Jul-21 -71 05-Jul-21, General


A17860
Project Start 0 0 100% 02-Mar-20 A Project Start
A17870
Project Finish 0 0 0% 05-Jul-21 -71 Project Finish
Construction 8 8 0% 30-May-21 06-Jun-21 -71 06-Jun-21, Construction
A17890
Building A Finish 0 0 0% 30-May-21 -64 Building A Finish
A17900
Building B Finish 0 0 0% 30-May-21 -64 Building B Finish
A17910
Building C Finish 0 0 0% 06-Jun-21 -71 Building C Finish

Submission & Approv al s 434 434 0% 07-May-20 27-Jun-21 -71 27-Jun-21, Submission & Approvals

General 434 434 0% 07-May-20 27-Jun-21 -71 27-Jun-21, General


A21930
Qulaity Plan Submission 9 9 0% 07-May-20 14-May-20 -41 Qulaity Plan Submission
A21940
Safety Plan Submission 9 9 0% 07-May-20 14-May-20 -41 Safety Plan Submission
A21950
Civil Defense Shop Drawing Submission
9 9 0% 07-May-20 14-May-20 -40 Civil Defense Shop Drawing Submission
A21960
Civil Defense Approval 16 16 0% 16-May-20 03-Jun-20 -40 Civil Defense Approval
A21970
As Built Drawings Submission 6 6 0% 22-Jun-21 27-Jun-21 -71 As Built Drawings Submission
A21980
Qulaity Plan Approval 18 18 0% 16-May-20 04-Jun-20 -41 Qulaity Plan Approval
A21990
Safety Plan Approval 18 18 0% 16-May-20 04-Jun-20 -41 Safety Plan Approval
Engineering 56 56 0% 07-May-20 02-Jul-20 -71 02-Jul-20, Engineering
Shop Drawings Submittal & Ap pr oval 56 56 0% 07-May-20 02-Jul-20 -71 02-Jul-20, Shop Drawings Submittal & Approval
A20910
Structural & Civil Shop Drawings Approval
38 38 0% 30-May-20 02-Jul-20 -71 Structural & Civil Shop Drawings Approval
A20920
Architectural Shop Drawings Approval
38 38 0% 30-May-20 02-Jul-20 -71 Architectural Shop Drawings Approval
A20930
Plumping Shop Drawings Approval 38 38 0% 30-May-20 02-Jul-20 -71 Plumping Shop Drawings Approval
A20940
HVAC Shop Drawings Approval 38 38 0% 30-May-20 02-Jul-20 -71 HVAC Shop Drawings Approval
A20950
Electrical Shop Drawings Approval 38 38 0% 30-May-20 02-Jul-20 -71 Electrical Shop Drawings Approval
A20960
Structural & Civil Shop Drawings Submission
19 19 0% 07-May-20 28-May-20 -71 Structural & Civil Shop Drawings Submission
A20970
Architectural Shop Drawings Submission
19 19 0% 07-May-20 28-May-20 -71 Architectural Shop Drawings Submission
A20980
Plumping Shop Drawings Submission
19 19 0% 07-May-20 28-May-20 -71 Plumping Shop Drawings Submission
A20990
HVAC Shop Drawings Submi ssion 19 19 0% 07-May-20 28-May-20 -71 HVAC Shop Drawings Submi ssion
A21000
Electrical Shop Drawings Submission
19 19 0% 07-May-20 28-May-20 -71 Electrical Shop Drawings Submission

Procurement 310 310 0% 30-May-20 21-Mar-21 -29 21-Mar-21, Procurement

Civil 241 241 0% 30-May-20 16-Jan-21 -28 16-Jan-21, Civil


Concr ete 50 50 0% 30-May-20 14-Jul-20 -59 14-Jul-20, Concrete
A21020
Vender Approval 18 18 0% 30-May-20 14-Jun-20 -59 Vender Approval
A21030
P.O 6 6 0% 15-Jun-20 20-Jun-20 -59 P.O
A21040
Material Supplying 26 26 0% 21-Jun-20 14-Jul-20 -59 Material Supplying
Doors 235 235 0% 30-May-20 10-Jan-21 -34 10-Jan-21, Doors
A21090
Vender Approval 18 18 0% 30-May-20 14-Jun-20 -34 Vender Approval
A21100
Material Approval 11 11 0% 15-Jun-20 24-Jun-20 -34 Material Approval
A21110
P.O 6 6 0% 25-Jun-20 30-Jun-20 -34 P.O
A21120
Materials Supplying 200 200 0% 01-Jul-20 10-Jan-21 -34 Materials Supplying
Windows 235 235 0% 30-May-20 10-Jan-21 -34 10-Jan-21, Windows
A21370
Vender Approval 18 18 0% 30-May-20 14-Jun-20 -34 Vender Approval
A21380
Material Approval 11 11 0% 15-Jun-20 24-Jun-20 -34 Material Approval
A21390
P.O 6 6 0% 25-Jun-20 30-Jun-20 -34 P.O
A21400
Materials Supplying 200 200 0% 01-Jul-20 10-Jan-21 -34 Materials Supplying
Waterp ro ofin g 116 116 0% 30-May-20 20-Sep-20 -23 20-Sep-20, Waterproofing
A21130
Vender Approval 18 18 0% 30-May-20 14-Jun-20 -23 Vender Approval
A21140
Material Approval 11 11 0% 15-Jun-20 24-Jun-20 -23 Material Approval
A21150
P.O 6 6 0% 25-Jun-20 30-Jun-20 -23 P.O
A21160
Materials Supplying 81 81 0% 01-Jul-20 20-Sep-20 -23 Materials Supplying
Floor finishing materials 241 241 0% 30-May-20 16-Jan-21 -28 16-Jan-21, Floor finishing materials
A21170
Vender Approval 18 18 0% 30-May-20 14-Jun-20 -28 Vender Approval
A21180
Material Approval 11 11 0% 15-Jun-20 24-Jun-20 -28 Material Approval
A21190
P.O 6 6 0% 25-Jun-20 30-Jun-20 -28 P.O
A21200
Materials Supplying 206 206 0% 01-Jul-20 16-Jan-21 -28 Materials Supplying
Wall fin ish in g mater ials 241 241 0% 30-May-20 16-Jan-21 -28 16-Jan-21, Wall fini shi ng materi als
A21450
Vender Approval 18 18 0% 30-May-20 14-Jun-20 -28 Vender Approval
A21460
Material Approval 11 11 0% 15-Jun-20 24-Jun-20 -28 Material Approval
A21470
P.O 6 6 0% 25-Jun-20 30-Jun-20 -28 P.O
A21480
Materials Supplying 206 206 0% 01-Jul-20 16-Jan-21 -28 Materials Supplying
Ceiling finishing mater ials 210 210 0% 30-May-20 17-Dec-20 -33 17-Dec-20, Ceiling finishing materials
A21490
Vender Approval 18 18 0% 30-May-20 14-Jun-20 -33 Vender Approval
A21500
Material Approval 11 11 0% 15-Jun-20 24-Jun-20 -33 Material Approval
A21510
P.O 6 6 0% 25-Jun-20 30-Jun-20 -33 P.O
A21520
Materials Supplying 175 175 0% 01-Jul-20 17-Dec-20 -33 Materials Supplying
Mechanical 285 285 0% 30-May-20 25-Feb-21 -28 25-Feb-21, Mechanical
Pipes 198 198 0% 30-May-20 06-Dec-20 -29 06-Dec-20, Pipes
A21210
Vender Approval 18 18 0% 30-May-20 14-Jun-20 -29 Vender Approval
A21220
Material Approval 11 11 0% 15-Jun-20 24-Jun-20 -29 Material Approval
A21230
P.O 6 6 0% 25-Jun-20 30-Jun-20 -29 P.O
A21240
Materials Supplying 163 163 0% 01-Jul-20 06-Dec-20 -29 Materials Supplying
Pumps 223 223 0% 30-May-20 29-Dec-20 -31 29-Dec-20, Pumps
A21530
Vender Approval 18 18 0% 30-May-20 14-Jun-20 -31 Vender Approval
A21540
Material Approval 11 11 0% 15-Jun-20 24-Jun-20 -31 Material Approval
A21550
P.O 6 6 0% 25-Jun-20 30-Jun-20 -31 P.O
A21560
Materials Supplying 188 188 0% 01-Jul-20 29-Dec-20 -31 Materials Supplying
Valves 241 241 0% 30-May-20 16-Jan-21 -30 16-Jan-21, Valves
A21570
Vender Approval 18 18 0% 30-May-20 14-Jun-20 -30 Vender Approval
A21580
Material Approval 11 11 0% 15-Jun-20 24-Jun-20 -30 Material Approval
A21590
P.O 6 6 0% 25-Jun-20 30-Jun-20 -30 P.O
A21600
Materials Supplying 206 206 0% 01-Jul-20 16-Jan-21 -30 Materials Supplying
Tanks 248 248 0% 30-May-20 21-Jan-21 -28 21-Jan-21, Tanks
A21610
Vender Approval 18 18 0% 30-May-20 14-Jun-20 -28 Vender Approval
A21620
Material Approval 11 11 0% 15-Jun-20 24-Jun-20 -28 Material Approval
A21630
P.O 6 6 0% 25-Jun-20 30-Jun-20 -28 P.O
A21640
Materials Supplying 213 213 0% 01-Jul-20 21-Jan-21 -28 Materials Supplying
Fire Hose Cabinet 285 285 0% 30-May-20 25-Feb-21 -28 25-Feb-21, Fire Hose Cabinet
A21650
Vender Approval 18 18 0% 30-May-20 14-Jun-20 -28 Vender Approval
A21660
Material Approval 11 11 0% 15-Jun-20 24-Jun-20 -28 Material Approval
A21670
P.O 6 6 0% 25-Jun-20 30-Jun-20 -28 P.O
A21680
Materials Supplying 250 250 0% 01-Jul-20 25-Feb-21 -28 Materials Supplying
HVAC Duct & AC Units 248 248 0% 30-May-20 21-Jan-21 -31 21-Jan-21, HVAC Duct & AC Units
A21690
Vender Approval 18 18 0% 30-May-20 14-Jun-20 -31 Vender Approval
A21700
Material Approval 11 11 0% 15-Jun-20 24-Jun-20 -31 Material Approval
A21710
P.O 6 6 0% 25-Jun-20 30-Jun-20 -31 P.O
A21720
Materials Supplying 213 213 0% 01-Jul-20 21-Jan-21 -31 Materials Supplying
Sanitary Fixtures 185 185 0% 30-May-20 24-Nov-20 -31 24-Nov-20, Sanitary Fixtures
A21730
Vender Approval 18 18 0% 30-May-20 14-Jun-20 -31 Vender Approval
A21740
Material Approval 11 11 0% 15-Jun-20 24-Jun-20 -31 Material Approval
A21750
P.O 6 6 0% 25-Jun-20 30-Jun-20 -31 P.O
A21760
Materials Supplying 150 150 0% 01-Jul-20 24-Nov-20 -31 Materials Supplying
Electrical 310 310 0% 30-May-20 21-Mar-21 -29 21-Mar-21, Electrical
Cables 223 223 0% 30-May-20 29-Dec-20 -21 29-Dec-20, Cables
A21290
Vender Approval 18 18 0% 30-May-20 14-Jun-20 -21 Vender Approval
A21300
Material Approval 11 11 0% 15-Jun-20 24-Jun-20 -21 Material Approval
A21310
P.O 6 6 0% 25-Jun-20 30-Jun-20 -21 P.O
A21320
Materials Supplying 188 188 0% 01-Jul-20 29-Dec-20 -21 Materials Supplying
Lighting Fixtures 310 310 0% 30-May-20 21-Mar-21 -29 21-Mar-21, Lighting Fixtures
A21770
Vender Approval 18 18 0% 30-May-20 14-Jun-20 -29 Vender Approval
A21780
Material Approval 11 11 0% 15-Jun-20 24-Jun-20 -29 Material Approval
A21790
P.O 6 6 0% 25-Jun-20 30-Jun-20 -29 P.O
A21800
Materials Supplying 275 275 0% 01-Jul-20 21-Mar-21 -29 Materials Supplying
Panel boards 273 273 0% 30-May-20 14-Feb-21 -26 14-Feb-21, Panel boards
A21330
Vender Approval 18 18 0% 30-May-20 14-Jun-20 -26 Vender Approval
A21340
Material Approval 11 11 0% 15-Jun-20 24-Jun-20 -26 Material Approval
A21350
P.O 6 6 0% 25-Jun-20 30-Jun-20 -26 P.O
A21360
Materials Supplying 238 238 0% 01-Jul-20 14-Feb-21 -26 Materials Supplying
Fire Alar m system 273 273 0% 30-May-20 14-Feb-21 -26 14-Feb-21, Fire Alarm system
A21810
Vender Approval 18 18 0% 30-May-20 14-Jun-20 -26 Vender Approval
A21820
Material Approval 11 11 0% 15-Jun-20 24-Jun-20 -26 Material Approval
A21830
P.O 6 6 0% 25-Jun-20 30-Jun-20 -26 P.O
A21840
Materials Supplying 238 238 0% 01-Jul-20 14-Feb-21 -26 Materials Supplying
telphone & Data System 273 273 0% 30-May-20 14-Feb-21 -26 14-Feb-21, telphone & Data System
A21850
Vender Approval 18 18 0% 30-May-20 14-Jun-20 -26 Vender Approval
A21860
Material Approval 11 11 0% 15-Jun-20 24-Jun-20 -26 Material Approval
A21870
P.O 6 6 0% 25-Jun-20 30-Jun-20 -26 P.O
A21880
Materials Supplying 238 238 0% 01-Jul-20 14-Feb-21 -26 Materials Supplying
Public addr ess System 254 254 0% 30-May-20 27-Jan-21 -25 27-Jan-21, Public address System
A21890
Vender Approval 18 18 0% 30-May-20 14-Jun-20 -25 Vender Approval
A21900
Material Approval 11 11 0% 15-Jun-20 24-Jun-20 -25 Material Approval
A21910
P.O 6 6 0% 25-Jun-20 30-Jun-20 -25 P.O
A21920
Materials Supplying 219 219 0% 01-Jul-20 27-Jan-21 -25 Materials Supplying

Construction Works 429 358 0.21% 28-Mar-20 A 08-Jun-21 -71 08-Jun-21, Construction Works

Mobilization 6 6 100% 04-Apr-20 A 08-Jul-20 -71 08-Jul-20, Mobilization

Actual Work Critical Remaining Work Summary Page 1 of 7 TASK filter: All Activities
Remaining Work Milestone © Primavera Systems, Inc.
Jubail complex Update up 28 May May Classic WBS Layout 01-Jun-20 15:15
Activity ID Activity Name Original Remaining Schedule % Start Finish Total February 2020 March 2020 April 2020 May 2020 June 2020 July 2020 August 2020 September 2020 October 2020 November 2020 December 2020 January 2021 February 2021 March 2021 April 2021 May 2021 June 2021 July 2021 August 2021
Duration Duration Complete Float 02 09 16 23 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 05 12 19 26 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01
A18110
Preparation and processing for the start
6 of work 6 100% 04-Apr-20 A 08-Jul-20 -71 Preparation and processing for the start of work
General Site Works ( A & B & C ) 323 251 0% 05-Apr-20 A 30-May-21 -64 30-May-21, General Site Works ( A & B & C )
Civil Work 323 251 0% 05-Apr-20 A 30-May-21 -64 30-May-21, Civil Work
Sub-Str ucture 125 54 0% 05-Apr-20 A 26-Nov-20 -64 26-Nov-20, Sub-Structure
Soil termite treatment 3 3 0% 20-Oct-20 21-Oct-20 -64 Soil termite treatment
Boreholes surrounding the main building
6 6 0% 05-Apr-20 A 13-Oct-20 -64 Boreholes surrounding the main building
Backfilling 4 4 0% 24-Nov-20 26-Nov-20 -64 Backfilling
Excavation for fence foundation 6 6 0% 14-Oct-20 19-Oct-20 -64 Excavation for fence foundation
Slab on grade 11 11 0% 22-Oct-20 01-Nov-20 -64 Slab on grade
Super Str ucture 225 225 0% 02-Nov-20 30-May-21 -64 30-May-21, Super Structure
Concr ete work 45 45 0% 02-Nov-20 13-Dec-20 -64 13-Dec-20, Concrete work
Columns 18 18 0% 28-Nov-20 13-Dec-20 -64 Columns
Beams 11 11 0% 14-Nov-20 23-Nov-20 -64 Beams
Necks 6 6 0% 02-Nov-20 07-Nov-20 -64 Necks
Paving 130 130 0% 07-Jan-21 08-May-21 -58 08-May-21, Paving
Leveling Works 18 18 0% 07-Jan-21 23-Jan-21 -58 Leveling Works
Artificial grass Installation for umbrellas
9 9 0% 22-Apr-21 29-Apr-21 -58 Artificial grass Installation for umbrellas
Interlock Works 35 35 0% 21-Feb-21 24-Mar-21 -58 Interlock Works
Cement Tiles W orks 30 30 0% 25-Mar-21 21-Apr-21 -58 Cement Tiles W orks
Precast Concrete Chairs & Baskets Work
9 9 0% 01-May-21 08-May-21 -58 Precast Concrete Chairs & Baskets Work
Curbstone 26 26 0% 24-Jan-21 16-Feb-21 -58 Curbstone
Sand Works 4 4 0% 17-Feb-21 20-Feb-21 -58 Sand Works
Finishing Works 219 219 0% 08-Nov-20 30-May-21 -64 30-May-21, Finishing Works
Plastering works 26 26 0% 07-Jan-21 31-Jan-21 -64 Plastering works
External Painting (Profile) 18 18 0% 15-May-21 30-May-21 -64 External Painting (Profile)
Masonry works 26 26 0% 14-Dec-20 06-Jan-21 -64 Masonry works
Metal Works 35 35 0% 01-Feb-21 04-Mar-21 -64 Metal Works
Waterproofing works for substructure6works 6 0% 08-Nov-20 12-Nov-20 -64 Waterproofing works for substructure works
Mechanical Wor ks 81 81 0% 24-Jan-21 08-Apr-21 -26 08-Apr-21, Mechanical Works
Plumping 38 38 0% 24-Jan-21 27-Feb-21 -30 27-Feb-21, Plumping
Connection to public water 9 9 0% 24-Jan-21 31-Jan-21 -30 Connection to public water
water valves 9 9 0% 01-Feb-21 08-Feb-21 -30 water valves
Sanitary & Waste pi pe system 11 11 0% 17-Feb-21 27-Feb-21 -30 Sanitary & Waste pi pe system
Manholes 9 9 0% 09-Feb-21 16-Feb-21 -30 Manholes
Fire 44 44 0% 28-Feb-21 08-Apr-21 -26 08-Apr-21, Fire
Gate Valve includi ng valve box 9 9 0% 16-Mar-21 23-Mar-21 -26 Gate Valve includi ng valve box
Fire piping intsallation 18 18 0% 28-Feb-21 15-Mar-21 -26 Fire piping intsallation
Fire Hose Cabinet & Accessori es 9 9 0% 24-Mar-21 31-Mar-21 -26 Fire Hose Cabinet & Accessori es
Siamese pipe connection 9 9 0% 01-Apr-21 08-Apr-21 -26 Siamese pipe connection
Electrical Works 135 135 0% 07-Jan-21 12-May-21 -63 12-May-21, Electrical Works
A22100
Inspection Chambers 9 9 0% 28-Mar-21 04-Apr-21 -63 Inspection Chambers
A22110
Board & Elec distribution system installation
38 38 0% 05-Apr-21 09-May-21 -63 Board & Elec distribution system installation
A22120
Lighting First Fix 30 30 0% 07-Jan-21 03-Feb-21 -23 Lighting First Fix
A22130
Lighting Second Fix 4 4 0% 14-Mar-21 16-Mar-21 -63 Lighting Second Fix
A22140
Lighting Third Fix 4 4 0% 10-May-21 12-May-21 -63 Lighting Third Fix
A22150
Cables installation 11 11 0% 17-Mar-21 27-Mar-21 -63 Cables installation
BUILDING (A) 423 351 0.12% 28-Mar-20 A 08-Jun-21 -71 08-Jun-21, BUILDING (A)
Main Building (A) 423 351 0.14% 28-Mar-20 A 08-Jun-21 -71 08-Jun-21, Main Building (A)
Civil Works 423 351 0.18% 28-Mar-20 A 08-Jun-21 -71 08-Jun-21, Civil Works
Sub-Str ucture 6 6 100% 28-Mar-20 A 14-Jul-20 -71 14-Jul-20, Sub-Structure
Remove of residues 6 6 100% 28-Mar-20 A 14-Jul-20 -71 Remove of residues
Super Str ucture 345 345 0% 15-Jul-20 08-Jun-21 -71 08-Jun-21, Super Structure
Concr ete Wor ks 126 126 0% 15-Jul-20 16-Nov-20 -71 16-Nov-20, Concrete Works
Supporting Wor ks 63 63 0% 27-Jul-20 29-Sep-20 -71 29-Sep-20, Supporting Works
Beams 6 6 0% 24-Sep-20 29-Sep-20 -71 Beams
Columns 26 26 0% 30-Aug-20 22-Sep-20 -71 Columns
Foundations 30 30 0% 27-Jul-20 29-Aug-20 -71 Foundations
Check and treatment 13 13 0% 15-Jul-20 26-Jul-20 -71 26-Jul-20, Check and treatment
Checking 4 4 0% 15-Jul-20 18-Jul-20 -71 Checking
Treatments 9 9 0% 19-Jul-20 26-Jul-20 -71 Treatments
Casting Works 51 51 0% 30-Sep-20 16-Nov-20 -71 16-Nov-20, Casting Works
Columns & Beams (parapet) 6 6 0% 02-Nov-20 07-Nov-20 -71 Columns & Beams (parapet)
Slabs & Beams 26 26 0% 08-Oct-20 01-Nov-20 -71 Slabs & Beams
Staircases and entrance 6 6 0% 11-Nov-20 16-Nov-20 -71 Staircases and entrance
Slab on grade 9 9 0% 30-Sep-20 07-Oct-20 -71 Slab on grade
Rambs 4 4 0% 08-Nov-20 10-Nov-20 -71 Rambs
Finishing Works 219 219 0% 17-Nov-20 08-Jun-21 -71 08-Jun-21, Finishing Works
Masonry Works 26 26 0% 17-Nov-20 10-Dec-20 -71 Masonry Works
Handrail & Protections 18 18 0% 03-Mar-21 18-Mar-21 -71 Handrail & Protections
Waterproofing for Bathroom & Ki tchen
6 6 0% 09-Feb-21 14-Feb-21 -71 Waterproofing for Bathroom & Ki tchen
Doors 26 26 0% 08-May-21 31-May-21 -71 Doors
Windows 35 35 0% 08-May-21 08-Jun-21 -71 Windows
Floor Finish (tiling & scerting) 38 38 0% 03-Apr-21 06-May-21 -71 Floor Finish (tiling & scerting)
Internal Cement Plastering 30 30 0% 02-Jan-21 28-Jan-21 -71 Internal Cement Plastering
Internal Painting Works (Primer + Filler
26 + 1st Coat)
26 0% 09-Mar-21 01-Apr-21 -71 Internal Painting Works (Primer + Filler + 1st Coat)
External Cement Plastering 23 23 0% 12-Dec-20 31-Dec-20 -71 External Cement Plastering
External Painting works 9 9 0% 08-May-21 15-May-21 -71 External Painting works
Aluminium strip 6 6 0% 03-Mar-21 08-Mar-21 -71 Aluminium strip
Gypsum board 11 11 0% 30-Jan-21 08-Feb-21 -71 Gypsum board
Counters 9 9 0% 08-May-21 15-May-21 -71 Counters
Specialies 11 11 0% 03-Mar-21 13-Mar-21 -71 Specialies
Painting Works (Final Coat) 13 13 0% 16-May-21 26-May-21 -71 Painting Works (Final Coat)
Ti les for Walls 18 18 0% 15-Feb-21 02-Mar-21 -71 Ti les for Walls
Roof finishes 35 35 0% 01-Mar-21 01-Apr-21 -71 Roof finishes
Roof sandwich panels 33 33 0% 02-Jan-21 31-Jan-21 -71 Roof sandwich panels
Ceiling Tiles 30 30 0% 01-Feb-21 28-Feb-21 -71 Ceiling Tiles
Mechanical Wor ks 136 136 0% 31-Jan-21 06-Jun-21 -71 06-Jun-21, Mechanical Works
Plumbing 100 100 0% 06-Mar-21 06-Jun-21 -71 06-Jun-21, Plumbing
Domestic Water Supply System 18 18 0% 06-Mar-21 21-Mar-21 -34 Domestic Water Supply System
Isolation valve 4 4 0% 22-Mar-21 24-Mar-21 -34 Isolation valve
Electric Water Heaters 6 6 0% 03-Apr-21 07-Apr-21 -43 Electric Water Heaters
Water Storage Tanks 6 6 0% 08-Apr-21 13-Apr-21 -43 Water Storage Tanks
Sanitary System 14 14 0% 14-Apr-21 26-Apr-21 -43 Sanitary System
Roof Scupper Drain 4 4 0% 27-Apr-21 29-Apr-21 -43 Roof Scupper Drain
Plumbing Fixtures 11 11 0% 27-May-21 06-Jun-21 -71 Plumbing Fixtures
Fire Fighting 44 44 0% 11-Mar-21 20-Apr-21 -33 20-Apr-21, Fire Fighting
Piping 26 26 0% 11-Mar-21 04-Apr-21 -33 Piping
Fire Hose Cabinet & Accessori es 11 11 0% 05-Apr-21 14-Apr-21 -33 Fire Hose Cabinet & Accessori es
fire extinguisher 6 6 0% 15-Apr-21 20-Apr-21 -33 fire extinguisher
HVAC 104 104 0% 31-Jan-21 06-May-21 -63 06-May-21, HVAC
DX-Split wall mounted type air conditioning
26 units
26 0% 03-Apr-21 26-Apr-21 -63 DX-Split wall mounted type air conditioning units
General Exhaust Fan 11 11 0% 16-Feb-21 25-Feb-21 -31 General Exhaust Fan
HVAC Ducts and Casings 18 18 0% 31-Jan-21 15-Feb-21 -31 HVAC Ducts and Casings
Air Curtain 6 6 0% 27-Feb-21 03-Mar-21 -31 Air Curtain
Dx - Split units 11 11 0% 27-Apr-21 06-May-21 -63 Dx - Split units
Electrical Works 154 154 0% 12-Dec-20 03-May-21 -35 03-May-21, Electrical Works
Electrical 154 154 0% 12-Dec-20 03-May-21 -35 03-May-21, Electrical
Panel Boards 9 9 0% 25-Feb-21 04-Mar-21 -26 Panel Boards
Lighting System First Fix (Conduits)18 18 0% 05-Jan-21 20-Jan-21 -26 Lighting System First Fix (Conduits)
Power Installation 11 11 0% 15-Feb-21 24-Feb-21 -26 Power Installation
Bells system 6 6 0% 22-Mar-21 27-Mar-21 -26 Bells system
Sockets & Switches 14 14 0% 03-Apr-21 14-Apr-21 -33 Sockets & Switches
Conductors and cables 26 26 0% 12-Dec-20 04-Jan-21 -26 Conductors and cables
Earthing system 9 9 0% 14-Mar-21 21-Mar-21 -26 Earthing system
Lightening Protection System 9 9 0% 06-Mar-21 13-Mar-21 -26 Lightening Protection System
Lighting System Second Fix (Wires)18 18 0% 30-Jan-21 14-Feb-21 -35 Lighting System Second Fix (Wires)
Lighting System Third Fix (Fixtures)18 18 0% 18-Apr-21 03-May-21 -35 Lighting System Third Fix (Fixtures)
Communications 73 73 0% 05-Jan-21 13-Mar-21 -35 13-Mar-21, Communications
Telephone & Data Communication System
18 First18
Fix 0% 05-Jan-21 20-Jan-21 -26 Telephone & Data Communication System First Fix
Public Address system 18 18 0% 15-Feb-21 02-Mar-21 -35 Public Address system
Fire Alarm System Fi rst F ix 25 25 0% 05-Jan-21 27-Jan-21 -16 Fire Alarm System Fi rst F ix
Fire Alarm System Second Fi x 18 18 0% 30-Jan-21 14-Feb-21 -18 Fire Alarm System Second Fi x
Fire Alarm System Third Fi x 11 11 0% 23-Feb-21 04-Mar-21 -26 Fire Alarm System Third Fi x
Telephone & Data Communication System
18 Second
18 Fix 0% 30-Jan-21 14-Feb-21 -35 Telephone & Data Communication System Second Fix
Telephone & Data Communication System
11 Third11Fix 0% 03-Mar-21 13-Mar-21 -35 Telephone & Data Communication System Third Fix
Canteen (A) 143 143 0% 19-Jan-21 31-May-21 -65 31-May-21, Canteen (A)
Civil Works 143 143 0% 19-Jan-21 31-May-21 -65 31-May-21, Civil Works
Sub-Str ucture 43 43 0% 19-Jan-21 27-Feb-21 -65 27-Feb-21, Sub-Structure
Excavation for foundation 4 4 0% 19-Jan-21 21-Jan-21 -65 Excavation for foundation
Soil termite treatment 3 3 0% 23-Jan-21 24-Jan-21 -65 Soil termite treatment
Backfilling 4 4 0% 24-Feb-21 27-Feb-21 -65 Backfilling
bitumen paint 3 3 0% 06-Feb-21 07-Feb-21 -65 bitumen paint
PCC 3 3 0% 25-Jan-21 26-Jan-21 -65 PCC
Footing 4 4 0% 27-Jan-21 30-Jan-21 -65 Footing
Slab on grade 11 11 0% 14-Feb-21 23-Feb-21 -65 Slab on grade
Neck Column 6 6 0% 31-Jan-21 04-Feb-21 -65 Neck Column

Actual Work Critical Remaining Work Summary Page 2 of 7 TASK filter: All Activities
Remaining Work Milestone © Primavera Systems, Inc.
Jubail complex Update up 28 May May Classic WBS Layout 01-Jun-20 15:15
Activity ID Activity Name Original Remaining Schedule % Start Finish Total February 2020 March 2020 April 2020 May 2020 June 2020 July 2020 August 2020 September 2020 October 2020 November 2020 December 2020 January 2021 February 2021 March 2021 April 2021 May 2021 June 2021 July 2021 August 2021
Duration Duration Complete Float 02 09 16 23 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 05 12 19 26 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01
Grade Beam 6 6 0% 08-Feb-21 13-Feb-21 -65 Grade Beam
Super Str ucture 100 100 0% 28-Feb-21 31-May-21 -65 31-May-21, Super Structure
Concr ete Wor ks 35 35 0% 28-Feb-21 31-Mar-21 -65 31-Mar-21, Concrete Works
Beams 9 9 0% 08-Mar-21 15-Mar-21 -65 Beams
Slabs 18 18 0% 16-Mar-21 31-Mar-21 -65 Slabs
Column 9 9 0% 28-Feb-21 07-Mar-21 -65 Column
Finishing Works 65 65 0% 01-Apr-21 31-May-21 -65 31-May-21, Finishing Works
Masonry Works 18 18 0% 01-Apr-21 17-Apr-21 -65 Masonry Works
Waterproofing for Bathroom & Ki tchen
4 4 0% 24-Apr-21 26-Apr-21 -55 Waterproofing for Bathroom & Ki tchen
Doors 6 6 0% 13-May-21 18-May-21 -65 Doors
Windows 6 6 0% 13-May-21 18-May-21 -65 Windows
Floor tiling 4 4 0% 10-May-21 12-May-21 -65 Floor tiling
Internal Cement Plastering 6 6 0% 18-Apr-21 22-Apr-21 -65 Internal Cement Plastering
External Cement Plastering 9 9 0% 24-Apr-21 01-May-21 -65 External Cement Plastering
Painting works 9 9 0% 24-May-21 31-May-21 -65 Painting works
Gypsum board 6 6 0% 24-Apr-21 28-Apr-21 -61 Gypsum board
Counters 6 6 0% 13-May-21 18-May-21 -65 Counters
Ti les for Walls 4 4 0% 27-Apr-21 29-Apr-21 -55 Ti les for Walls
Roof finishes 9 9 0% 02-May-21 09-May-21 -65 Roof finishes
Mechanical Wor ks 39 39 0% 18-Apr-21 23-May-21 -65 23-May-21, Mechanical Works
Plumbing 39 39 0% 18-Apr-21 23-May-21 -65 23-May-21, Plumbing
Domestic Water Supply System 4 4 0% 18-Apr-21 20-Apr-21 -65 Domestic Water Supply System
Electric Water Heaters 4 4 0% 13-May-21 16-May-21 -58 Electric Water Heaters
Sanitary System 6 6 0% 21-Apr-21 26-Apr-21 -65 Sanitary System
Roof Scupper Drain 5 5 0% 27-Apr-21 01-May-21 -65 Roof Scupper Drain
Plumbing Fixtures 5 5 0% 19-May-21 23-May-21 -65 Plumbing Fixtures
Sanitary Waste Pipi ng Specialties 4 4 0% 18-Apr-21 20-Apr-21 -65 Sanitary Waste Pipi ng Specialties
Fire Fighting 4 4 0% 19-May-21 22-May-21 -64 22-May-21, Fire Fighting
fire extinguisher 4 4 0% 19-May-21 22-May-21 -64 fire extinguisher
HVAC 5 5 0% 24-Apr-21 27-Apr-21 -61 27-Apr-21, HVAC
DX-Split wall mounted type air conditioning
4 units4 0% 25-Apr-21 27-Apr-21 -61 DX-Split wall mounted type air conditioning units
General Exhaust Fan 1 1 0% 24-Apr-21 24-Apr-21 -61 General Exhaust Fan
Electrical Works 20 20 0% 18-Apr-21 05-May-21 -46 05-May-21, Electrical Works
Electrical Power 20 20 0% 18-Apr-21 05-May-21 -46 05-May-21, Electrical Power
Power and Lighting panel 4 4 0% 26-Apr-21 28-Apr-21 -44 Power and Lighting panel
Power Installation 3 3 0% 02-May-21 03-May-21 -46 Power Installation
Disconnect Switches 3 3 0% 29-Apr-21 01-May-21 -44 Disconnect Switches
Conductors and cables 9 9 0% 24-Apr-21 01-May-21 -46 Conductors and cables
Lighting System First Fix (Conduits) 6 6 0% 18-Apr-21 22-Apr-21 -46 Lighting System First Fix (Conduits)
Lighting System Second Fix (Wires) 3 3 0% 24-Apr-21 25-Apr-21 -45 Lighting System Second Fix (Wires)
Lighting System Third Fix (Fixtures) 3 3 0% 04-May-21 05-May-21 -46 Lighting System Third Fix (Fixtures)
Communications 10 10 0% 24-Apr-21 02-May-21 -45 02-May-21, Communications
Telephone & Data Communication System
5 First Fix
5 0% 24-Apr-21 27-Apr-21 -45 Telephone & Data Communication System First Fix
Fire Alarm System Fi rst F ix 5 5 0% 24-Apr-21 27-Apr-21 -45 Fire Alarm System Fi rst F ix
Fire Alarm System Second Fi x 3 3 0% 28-Apr-21 29-Apr-21 -45 Fire Alarm System Second Fi x
Fire Alarm System Third Fi x 3 3 0% 01-May-21 02-May-21 -45 Fire Alarm System Third Fi x
Telephone & Data Communication System
3 Second
3 Fix 0% 28-Apr-21 29-Apr-21 -45 Telephone & Data Communication System Second Fix
Telephone & Data Communication System
3 Third 3Fix 0% 01-May-21 02-May-21 -45 Telephone & Data Communication System Third Fix
Guard House ( A ) 273 273 0% 25-Aug-20 06-May-21 -39 06-May-21, Guard House ( A )
Civil Works 273 273 0% 25-Aug-20 06-May-21 -39 06-May-21, Civil Works
Sub-Str ucture 28 28 0% 25-Aug-20 19-Sep-20 -39 19-Sep-20, Sub-Structure
Excavation for foundation 3 3 0% 25-Aug-20 26-Aug-20 -39 Excavation for foundation
Backfilling 3 3 0% 17-Sep-20 19-Sep-20 -39 Backfilling
Soil termite treatment 3 3 0% 27-Aug-20 29-Aug-20 -39 Soil termite treatment
PCC 3 3 0% 30-Aug-20 31-Aug-20 -39 PCC
Footing 6 6 0% 01-Sep-20 06-Sep-20 -39 Footing
Slab on grade 4 4 0% 14-Sep-20 16-Sep-20 -39 Slab on grade
Neck Column 4 4 0% 07-Sep-20 09-Sep-20 -39 Neck Column
Grade Beam 4 4 0% 10-Sep-20 13-Sep-20 -39 Grade Beam
Super Str ucture 245 245 0% 20-Sep-20 06-May-21 -39 06-May-21, Super Structure
Concr ete Wor ks 64 64 0% 20-Sep-20 18-Nov-20 -39 18-Nov-20, Concrete Works
Beams 11 11 0% 15-Oct-20 25-Oct-20 -39 Beams
Slabs 26 26 0% 26-Oct-20 18-Nov-20 -39 Slabs
Column 26 26 0% 20-Sep-20 14-Oct-20 -39 Column
Finishing Works 181 181 0% 19-Nov-20 06-May-21 -39 06-May-21, Finishing Works
Masonry Works 6 6 0% 19-Nov-20 24-Nov-20 -39 Masonry Works
Waterproofing for Bathroom & Ki tchen
9 9 0% 07-Dec-20 14-Dec-20 -19 Waterproofing for Bathroom & Ki tchen
Doors 26 26 0% 27-Jan-21 20-Feb-21 -19 Doors
Windows 35 35 0% 27-Jan-21 28-Feb-21 -19 Windows
Floor Finish (tiling & scerting) 21 21 0% 20-Mar-21 07-Apr-21 -39 Floor Finish (tiling & scerting)
Internal Cement Plastering 6 6 0% 01-Dec-20 06-Dec-20 -19 Internal Cement Plastering
External Cement Plastering 6 6 0% 25-Nov-20 30-Nov-20 -19 External Cement Plastering
Painting works 14 14 0% 25-Apr-21 06-May-21 -39 Painting works
Aluminium strip 9 9 0% 01-Dec-20 08-Dec-20 -19 Aluminium strip
Counters 9 9 0% 27-Jan-21 03-Feb-21 -39 Counters
Specialies 5 5 0% 23-Jan-21 26-Jan-21 -39 Specialies
Ti les for Walls 21 21 0% 03-Jan-21 21-Jan-21 -39 Ti les for Walls
Roof finishes 6 6 0% 28-Dec-20 02-Jan-21 -39 Roof finishes
Mechanical Wor ks 161 161 0% 25-Nov-20 24-Apr-21 -39 24-Apr-21, Mechanical Works
DX-Split Units 35 35 0% 15-Feb-21 18-Mar-21 -39 DX-Split Units
General Exhaust Fan 11 11 0% 04-Feb-21 14-Feb-21 -39 General Exhaust Fan
Domestic Water Supply System 18 18 0% 25-Nov-20 10-Dec-20 -39 Domestic Water Supply System
Electric Water Heaters 18 18 0% 08-Apr-21 24-Apr-21 -39 Electric Water Heaters
Sanitary System 14 14 0% 12-Dec-20 23-Dec-20 -39 Sanitary System
Roof Scupper Drain 4 4 0% 24-Dec-20 27-Dec-20 -39 Roof Scupper Drain
Plumbing Fixtures 18 18 0% 08-Apr-21 24-Apr-21 -39 Plumbing Fixtures
fire extinguisher 18 18 0% 08-Apr-21 24-Apr-21 -39 fire extinguisher
Sanitary Specialties 18 18 0% 25-Nov-20 10-Dec-20 -39 Sanitary Specialties
Electrical Works 95 95 0% 17-Jan-21 14-Apr-21 -29 14-Apr-21, Electrical Works
Electrical 95 95 0% 17-Jan-21 14-Apr-21 -29 14-Apr-21, Electrical
Panel Boards 18 18 0% 23-Feb-21 10-Mar-21 -26 Panel Boards
Lighting System First Fix (Conduits)18 18 0% 17-Jan-21 01-Feb-21 -21 Lighting System First Fix (Conduits)
Power Installation 11 11 0% 10-Mar-21 20-Mar-21 -19 Power Installation
Sockets & Switches 18 18 0% 11-Mar-21 27-Mar-21 -26 Sockets & Switches
Conductors and cables 20 20 0% 20-Feb-21 09-Mar-21 -19 Conductors and cables
Lighting System Second Fix (Wires)18 18 0% 02-Feb-21 17-Feb-21 -21 Lighting System Second Fix (Wires)
Lighting System Third Fix (Fixtures)18 18 0% 30-Mar-21 14-Apr-21 -29 Lighting System Third Fix (Fixtures)
Communications 68 68 0% 17-Jan-21 20-Mar-21 -19 20-Mar-21, Communications
Telephone & Data Communication System
30 First30
Fix 0% 17-Jan-21 13-Feb-21 -19 Telephone & Data Communication System First Fix
Fire Alarm System Fi rst F ix 30 30 0% 17-Jan-21 13-Feb-21 -19 Fire Alarm System Fi rst F ix
Fire Alarm System Second Fi x 19 19 0% 14-Feb-21 02-Mar-21 -19 Fire Alarm System Second Fi x
Fire Alarm System Third Fi x 19 19 0% 03-Mar-21 20-Mar-21 -19 Fire Alarm System Third Fi x
Telephone & Data Communication System
19 Second
19 Fix 0% 14-Feb-21 02-Mar-21 -19 Telephone & Data Communication System Second Fix
Telephone & Data Communication System
19 Third19Fix 0% 03-Mar-21 20-Mar-21 -19 Telephone & Data Communication System Third Fix
Electrical Room (A) 250 250 0% 06-Sep-20 27-Apr-21 -29 27-Apr-21, Electrical Room (A)
Civil Works 250 250 0% 06-Sep-20 27-Apr-21 -29 27-Apr-21, Civil Works
Sub-Str ucture 73 73 0% 06-Sep-20 12-Nov-20 -20 12-Nov-20, Sub-Structure
Excavation for foundation 6 6 0% 06-Sep-20 10-Sep-20 -20 Excavation for foundation
Backfilling 4 4 0% 10-Nov-20 12-Nov-20 -20 Backfilling
Soil termite treatment 3 3 0% 12-Sep-20 13-Sep-20 -20 Soil termite treatment
bitumen paint 4 4 0% 27-Oct-20 29-Oct-20 -20 bitumen paint
PCC 11 11 0% 14-Sep-20 24-Sep-20 -20 PCC
Footing 11 11 0% 26-Sep-20 05-Oct-20 -20 Footing
Slab on grade 11 11 0% 31-Oct-20 09-Nov-20 -20 Slab on grade
Neck Column 11 11 0% 06-Oct-20 15-Oct-20 -20 Neck Column
Grade Beam 11 11 0% 17-Oct-20 26-Oct-20 -20 Grade Beam
Super Str ucture 178 178 0% 14-Nov-20 27-Apr-21 -29 27-Apr-21, Super Structure
Concr ete Wor ks 64 64 0% 14-Nov-20 11-Jan-21 -20 11-Jan-21, Concrete Works
Beams 11 11 0% 08-Dec-20 17-Dec-20 -20 Beams
Slabs 26 26 0% 19-Dec-20 11-Jan-21 -20 Slabs
Column 26 26 0% 14-Nov-20 07-Dec-20 -20 Column
Finishing Works 114 114 0% 12-Jan-21 27-Apr-21 -29 27-Apr-21, Finishing Works
Masonry Works 18 18 0% 12-Jan-21 27-Jan-21 -20 Masonry Works
Doors 18 18 0% 02-Mar-21 17-Mar-21 -20 Doors
Windows 18 18 0% 02-Mar-21 17-Mar-21 -20 Windows
Floor finish (concrete screed & epoxy)
21 21 0% 18-Mar-21 06-Apr-21 -20 Floor finish (concrete screed & epoxy)
Cement Plastering 35 35 0% 28-Jan-21 01-Mar-21 -20 Cement Plastering
Painting works 14 14 0% 15-Apr-21 27-Apr-21 -29 Painting works
Roof finishes 18 18 0% 02-Mar-21 17-Mar-21 -20 Roof finishes
Mechanical Wor ks 38 38 0% 02-Mar-21 05-Apr-21 -19 05-Apr-21, Mechanical Works
General Exhaust Fan 15 15 0% 02-Mar-21 15-Mar-21 -19 General Exhaust Fan
Gargouri drainage 11 11 0% 16-Mar-21 25-Mar-21 -19 Gargouri drainage
fire extinguisher 11 11 0% 27-Mar-21 05-Apr-21 -19 fire extinguisher
Electrical Works 83 83 0% 28-Jan-21 14-Apr-21 -28 14-Apr-21, Electrical Works
Panel Boards 9 9 0% 14-Mar-21 21-Mar-21 -20 Panel Boards
Lighting System First Fix (Conduits)30 30 0% 28-Jan-21 24-Feb-21 -20 Lighting System First Fix (Conduits)

Actual Work Critical Remaining Work Summary Page 3 of 7 TASK filter: All Activities
Remaining Work Milestone © Primavera Systems, Inc.
Jubail complex Update up 28 May May Classic WBS Layout 01-Jun-20 15:15
Activity ID Activity Name Original Remaining Schedule % Start Finish Total February 2020 March 2020 April 2020 May 2020 June 2020 July 2020 August 2020 September 2020 October 2020 November 2020 December 2020 January 2021 February 2021 March 2021 April 2021 May 2021 June 2021 July 2021 August 2021
Duration Duration Complete Float 02 09 16 23 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 05 12 19 26 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01
Power Installation 11 11 0% 11-Mar-21 21-Mar-21 -20 Power Installation
Conductors and cables 15 15 0% 25-Feb-21 10-Mar-21 -20 Conductors and cables
Earthing system 9 9 0% 14-Mar-21 21-Mar-21 -20 Earthing system
Fire Alarm System Fi rst F ix 30 30 0% 03-Feb-21 02-Mar-21 -19 Fire Alarm System Fi rst F ix
Lighting System Second Fix (Wires)18 18 0% 25-Feb-21 13-Mar-21 -20 Lighting System Second Fix (Wires)
Lighting System Third Fix (Fixtures)18 18 0% 30-Mar-21 14-Apr-21 -29 Lighting System Third Fix (Fixtures)
Fire Alarm System Second Fi x 19 19 0% 03-Mar-21 20-Mar-21 -19 Fire Alarm System Second Fi x
Fire Alarm System Third Fi x 19 19 0% 21-Mar-21 06-Apr-21 -19 Fire Alarm System Third Fi x
Gate (A & B) 273 273 0% 19-Aug-20 01-May-21 -33 01-May-21, Gate (A & B)
Civil Works 273 273 0% 19-Aug-20 01-May-21 -33 01-May-21, Civil Works
Sub-Str ucture 73 73 0% 19-Aug-20 26-Oct-20 -33 26-Oct-20, Sub-Structure
Excavation for foundation 6 6 0% 19-Aug-20 24-Aug-20 -33 Excavation for foundation
Soil termite treatment 3 3 0% 25-Aug-20 26-Aug-20 -33 Soil termite treatment
bitumen paint 4 4 0% 10-Oct-20 12-Oct-20 -33 bitumen paint
PCC 11 11 0% 27-Aug-20 06-Sep-20 -33 PCC
Footing 11 11 0% 07-Sep-20 16-Sep-20 -33 Footing
Slab on grade 11 11 0% 13-Oct-20 22-Oct-20 -33 Slab on grade
Neck Column 11 11 0% 17-Sep-20 28-Sep-20 -33 Neck Column
Grade Beam 11 11 0% 29-Sep-20 08-Oct-20 -33 Grade Beam
Backfilling 4 4 0% 24-Oct-20 26-Oct-20 -33 Backfilling
Super Str ucture 200 200 0% 27-Oct-20 01-May-21 -33 01-May-21, Super Structure
Concr ete Wor ks 64 64 0% 27-Oct-20 24-Dec-20 -33 24-Dec-20, Concrete Works
Beams 11 11 0% 21-Nov-20 30-Nov-20 -33 Beams
Slabs 26 26 0% 01-Dec-20 24-Dec-20 -33 Slabs
Column 26 26 0% 27-Oct-20 19-Nov-20 -33 Column
Finishing Works 136 136 0% 26-Dec-20 01-May-21 -33 01-May-21, Finishing Works
Masonry Works 23 23 0% 26-Dec-20 14-Jan-21 -33 Masonry Works
Handrail & Protections 18 18 0% 25-Mar-21 10-Apr-21 -33 Handrail & Protections
Waterproofing for Bathroom & Ki tchen
9 9 0% 01-Feb-21 08-Feb-21 -33 Waterproofing for Bathroom & Ki tchen
Doors 9 9 0% 25-Mar-21 01-Apr-21 -33 Doors
Windows 9 9 0% 25-Mar-21 01-Apr-21 -33 Windows
Floor Finish (tiling & scerting) 21 21 0% 06-Mar-21 24-Mar-21 -33 Floor Finish (tiling & scerting)
Cement Plastering 18 18 0% 16-Jan-21 31-Jan-21 -33 Cement Plastering
Painting works 14 14 0% 19-Apr-21 01-May-21 -33 Painting works
Aluminium strip 9 9 0% 25-Feb-21 04-Mar-21 -33 Aluminium strip
Specialies 5 5 0% 01-Mar-21 04-Mar-21 -33 Specialies
Ti les for Walls 21 21 0% 09-Feb-21 28-Feb-21 -33 Ti les for Walls
Roof finishes 26 26 0% 01-Feb-21 24-Feb-21 -33 Roof finishes
External metal shades 18 18 0% 25-Mar-21 10-Apr-21 -33 External metal shades
Mechanical Wor ks 100 100 0% 16-Jan-21 18-Apr-21 -33 18-Apr-21, Mechanical Works
DX-Split units 9 9 0% 05-Apr-21 12-Apr-21 -26 DX-Split units
General Exhaust Fan 11 11 0% 25-Mar-21 04-Apr-21 -26 General Exhaust Fan
Domestic Water Supply System 18 18 0% 16-Jan-21 31-Jan-21 -23 Domestic Water Supply System
Electric Water Heaters 6 6 0% 11-Apr-21 15-Apr-21 -30 Electric Water Heaters
Sanitary System 14 14 0% 01-Feb-21 13-Feb-21 -23 Sanitary System
Plumbing Fixtures 15 15 0% 25-Mar-21 07-Apr-21 -21 Plumbing Fixtures
fire extinguisher 9 9 0% 11-Apr-21 18-Apr-21 -33 fire extinguisher
Sanitary Specialties 11 11 0% 14-Feb-21 23-Feb-21 -23 Sanitary Specialties
Electrical Works 96 96 0% 16-Jan-21 14-Apr-21 -29 14-Apr-21, Electrical Works
Electrical 96 96 0% 16-Jan-21 14-Apr-21 -29 14-Apr-21, Electrical
Panel Boards 18 18 0% 23-Feb-21 10-Mar-21 -24 Panel Boards
Lighting System First Fix (Conduits)18 18 0% 16-Jan-21 31-Jan-21 -24 Lighting System First Fix (Conduits)
Power Installation 19 19 0% 08-Mar-21 24-Mar-21 -24 Power Installation
Sockets & Switches 15 15 0% 11-Mar-21 24-Mar-21 -24 Sockets & Switches
Conductors and cables 19 19 0% 01-Feb-21 17-Feb-21 -24 Conductors and cables
Lighting System Second Fix (Wires)19 19 0% 01-Feb-21 17-Feb-21 -19 Lighting System Second Fix (Wires)
Lighting System Third Fix (Fixtures)18 18 0% 30-Mar-21 14-Apr-21 -29 Lighting System Third Fix (Fixtures)
Communications 68 68 0% 16-Jan-21 18-Mar-21 -19 18-Mar-21, Communications
Telephone & Data Communication System
30 First30
Fix 0% 16-Jan-21 11-Feb-21 -19 Telephone & Data Communication System First Fix
Public Address system 19 19 0% 02-Mar-21 18-Mar-21 -19 Public Address system
Fire Alarm System Fi rst F ix 30 30 0% 16-Jan-21 11-Feb-21 -19 Fire Alarm System Fi rst F ix
Fire Alarm System Second Fi x 19 19 0% 13-Feb-21 01-Mar-21 -19 Fire Alarm System Second Fi x
Fire Alarm System Third Fi x 19 19 0% 02-Mar-21 18-Mar-21 -19 Fire Alarm System Third Fi x
Telephone & Data Communication System
19 Second
19 Fix 0% 13-Feb-21 01-Mar-21 -19 Telephone & Data Communication System Second Fix
Telephone & Data Communication System
19 Third19Fix 0% 02-Mar-21 18-Mar-21 -19 Telephone & Data Communication System Third Fix
Water Tank & Pump Room (A) 178 178 0% 12-Dec-20 25-May-21 -59 25-May-21, Water Tank & Pump Room (A)
Civil Works 156 156 0% 12-Dec-20 05-May-21 -59 05-May-21, Civil Works
Masonry Works 5 5 0% 11-Feb-21 15-Feb-21 -59 Masonry Works
Cover & Ladder 18 18 0% 27-Mar-21 11-Apr-21 -59 Cover & Ladder
Waterproofing membrane 9 9 0% 03-Feb-21 10-Feb-21 -59 Waterproofing membrane
Waterproof cement plaster 18 18 0% 12-Apr-21 27-Apr-21 -59 Waterproof cement plaster
Excavation 6 6 0% 12-Dec-20 16-Dec-20 -59 Excavation
Backfilling 4 4 0% 16-Feb-21 18-Feb-21 -59 Backfilling
Soil termite treatment 3 3 0% 17-Dec-20 19-Dec-20 -59 Soil termite treatment
PCC 11 11 0% 20-Dec-20 29-Dec-20 -59 PCC
Footing 11 11 0% 30-Dec-20 09-Jan-21 -59 Footing
Pumps foundation 11 11 0% 16-Mar-21 25-Mar-21 -59 Pumps foundation
Slab 26 26 0% 20-Feb-21 15-Mar-21 -59 Slab
Wall 26 26 0% 10-Jan-21 02-Feb-21 -59 Wall
Pump Room 18 18 0% 27-Mar-21 11-Apr-21 -59 Pump Room
Waterproofing Epoxy 9 9 0% 28-Apr-21 05-May-21 -59 Waterproofing Epoxy
Mechanical Wor ks 10 10 0% 03-May-21 11-May-21 -59 11-May-21, Mechanical Works
Piping & Valves 4 4 0% 03-May-21 05-May-21 -59 Piping & Valves
Fire Pump 6 6 0% 06-May-21 11-May-21 -59 Fire Pump
Water Transfer Pumps 6 6 0% 06-May-21 11-May-21 -59 Water Transfer Pumps
Electrical Works 15 15 0% 12-May-21 25-May-21 -59 25-May-21, Electrical Works
Sockets & Switches 15 15 0% 12-May-21 25-May-21 -59 Sockets & Switches
BUILDING (B) 284 284 0% 19-Aug-20 11-May-21 -44 11-May-21, BUILDING (B)
Main Building (B) 270 270 0% 19-Aug-20 28-Apr-21 -30 28-Apr-21, Main Building (B)
Civil Works 270 270 0% 19-Aug-20 28-Apr-21 -30 28-Apr-21, Civil Works
Sub-Str ucture 9 9 0% 19-Aug-20 26-Aug-20 -44 26-Aug-20, Sub-Structure
Remove of residues 9 9 0% 19-Aug-20 26-Aug-20 -44 Remove of residues
Super Str ucture 261 261 0% 27-Aug-20 28-Apr-21 -30 28-Apr-21, Super Structure
Concr ete Wor ks 88 88 0% 27-Aug-20 17-Nov-20 -44 17-Nov-20, Concrete Works
Supporting Wor ks 53 53 0% 21-Sep-20 09-Nov-20 -44 09-Nov-20, Supporting Works
Beams 9 9 0% 17-Oct-20 24-Oct-20 -44 Beams
Columns 18 18 0% 25-Oct-20 09-Nov-20 -44 Columns
Foundations 26 26 0% 21-Sep-20 15-Oct-20 -44 Foundations
Check and treatment 26 26 0% 27-Aug-20 20-Sep-20 -44 20-Sep-20, Check and treatment
Checking 9 9 0% 27-Aug-20 03-Sep-20 -44 Checking
Treatments 18 18 0% 05-Sep-20 20-Sep-20 -44 Treatments
Casting Works 9 9 0% 10-Nov-20 17-Nov-20 -44 17-Nov-20, Casting Works
Rambs 9 9 0% 10-Nov-20 17-Nov-20 -44 Rambs
Finishing Works 174 174 0% 18-Nov-20 28-Apr-21 -30 28-Apr-21, Finishing Works
Masonry Works 30 30 0% 18-Nov-20 15-Dec-20 -44 Masonry Works
Handrail & Protections 18 18 0% 21-Feb-21 08-Mar-21 -28 Handrail & Protections
Waterproofing (check & treatment) 18 18 0% 10-Jan-21 25-Jan-21 -24 Waterproofing (check & treatment)
Doors 23 23 0% 27-Mar-21 15-Apr-21 -30 Doors
Windows 25 25 0% 27-Mar-21 18-Apr-21 -30 Windows
Floor finish (check & treatment) 29 29 0% 25-Jan-21 20-Feb-21 -28 Floor finish (check & treatment)
Internal Cement Plastering 26 26 0% 16-Dec-20 09-Jan-21 -24 Internal Cement Plastering
Internal Painting Works (Primer + Filler
18 + 1st Coat)
18 0% 10-Mar-21 25-Mar-21 -30 Internal Painting Works (Primer + Filler + 1st Coat)
External Painting works 26 26 0% 23-Mar-21 15-Apr-21 -28 External Painting works
Aluminium strip 15 15 0% 09-Mar-21 22-Mar-21 -28 Aluminium strip
Gypsum board 18 18 0% 26-Jan-21 10-Feb-21 -24 Gypsum board
Counters 9 9 0% 27-Mar-21 03-Apr-21 -30 Counters
Specialies 11 11 0% 22-Feb-21 03-Mar-21 -24 Specialies
Painting Works (Final Coat) 11 11 0% 19-Apr-21 28-Apr-21 -30 Painting Works (Final Coat)
Ti les for Walls 11 11 0% 11-Feb-21 21-Feb-21 -24 Ti les for Walls
Ceiling Tiles 11 11 0% 11-Feb-21 21-Feb-21 -24 Ceiling Tiles
Mechanical Wor ks 130 130 0% 16-Dec-20 15-Apr-21 -28 15-Apr-21, Mechanical Works
Plumbing 130 130 0% 16-Dec-20 15-Apr-21 -28 15-Apr-21, Plumbing
Domestic Water Supply System 19 19 0% 16-Dec-20 02-Jan-21 -23 Domestic Water Supply System
Isolation valve 9 9 0% 25-Jan-21 01-Feb-21 -30 Isolation valve
Electric Water Heaters 14 14 0% 04-Apr-21 15-Apr-21 -28 Electric Water Heaters
Water Storage Tanks 18 18 0% 02-Feb-21 17-Feb-21 -30 Water Storage Tanks
Sanitary System 9 9 0% 03-Jan-21 10-Jan-21 -23 Sanitary System
Roof Scupper Drain 10 10 0% 11-Jan-21 19-Jan-21 -23 Roof Scupper Drain
Plumbing Fixtures 21 21 0% 18-Feb-21 09-Mar-21 -30 Plumbing Fixtures
Fire Fighting 128 128 0% 16-Dec-20 13-Apr-21 -25 13-Apr-21, Fire Fighting
Piping 30 30 0% 16-Dec-20 12-Jan-21 -23 Piping
Fire Hose Cabinet & Accessori es 11 11 0% 27-Mar-21 05-Apr-21 -25 Fire Hose Cabinet & Accessori es
fire extinguisher 9 9 0% 06-Apr-21 13-Apr-21 -25 fire extinguisher
HVAC 56 56 0% 03-Feb-21 27-Mar-21 -24 27-Mar-21, HVAC
DX-Split units 30 30 0% 24-Feb-21 23-Mar-21 -24 DX-Split units
General Exhaust Fan 11 11 0% 14-Feb-21 23-Feb-21 -24 General Exhaust Fan

Actual Work Critical Remaining Work Summary Page 4 of 7 TASK filter: All Activities
Remaining Work Milestone © Primavera Systems, Inc.
Jubail complex Update up 28 May May Classic WBS Layout 01-Jun-20 15:15
Activity ID Activity Name Original Remaining Schedule % Start Finish Total February 2020 March 2020 April 2020 May 2020 June 2020 July 2020 August 2020 September 2020 October 2020 November 2020 December 2020 January 2021 February 2021 March 2021 April 2021 May 2021 June 2021 July 2021 August 2021
Duration Duration Complete Float 02 09 16 23 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 05 12 19 26 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01
HVAC Ducts and Casings 11 11 0% 03-Feb-21 13-Feb-21 -24 HVAC Ducts and Casings
Air Curtain 4 4 0% 24-Mar-21 27-Mar-21 -24 Air Curtain
Electrical Works 129 129 0% 16-Dec-20 14-Apr-21 -26 14-Apr-21, Electrical Works
Electrical 129 129 0% 16-Dec-20 14-Apr-21 -26 14-Apr-21, Electrical
Panel Boards 18 18 0% 23-Feb-21 10-Mar-21 -19 Panel Boards
Lighting System First Fix (Conduits)26 26 0% 16-Dec-20 09-Jan-21 -25 Lighting System First Fix (Conduits)
Power Installation 23 23 0% 07-Mar-21 27-Mar-21 -24 Power Installation
Bells system 18 18 0% 23-Feb-21 10-Mar-21 -19 Bells system
Sockets & Switches 30 30 0% 23-Feb-21 22-Mar-21 -19 Sockets & Switches
Conductors and cables 30 30 0% 07-Feb-21 06-Mar-21 -24 Conductors and cables
Earthing system 18 18 0% 23-Feb-21 10-Mar-21 -19 Earthing system
Lightening Protection System 18 18 0% 23-Feb-21 10-Mar-21 -19 Lightening Protection System
Lighting System Second Fix (Wires)26 26 0% 10-Jan-21 02-Feb-21 -24 Lighting System Second Fix (Wires)
Lighting System Third Fix (Fixtures)18 18 0% 30-Mar-21 14-Apr-21 -26 Lighting System Third Fix (Fixtures)
Remove Pre-Installed Electrical Works
30 30 0% 10-Jan-21 06-Feb-21 -24 Remove Pre-Installed Electrical Works
Communications 128 128 0% 16-Dec-20 13-Apr-21 -25 13-Apr-21, Communications
Telephone & Data Communication System
38 First38
Fix 0% 16-Dec-20 19-Jan-21 -25 Telephone & Data Communication System First Fix
Floor Boxes 26 26 0% 24-Feb-21 20-Mar-21 -25 Floor Boxes
Public Address system 26 26 0% 24-Feb-21 20-Mar-21 -25 Public Address system
Fire Alarm System Fi rst F ix 38 38 0% 10-Jan-21 13-Feb-21 -14 Fire Alarm System Fi rst F ix
Fire Alarm System Second Fi x 38 38 0% 14-Feb-21 20-Mar-21 -14 Fire Alarm System Second Fi x
Fire Alarm System Third Fi x 26 26 0% 21-Mar-21 13-Apr-21 -25 Fire Alarm System Third Fi x
Telephone & Data Communication System
38 Second
38 Fix 0% 20-Jan-21 23-Feb-21 -25 Telephone & Data Communication System Second Fix
Telephone & Data Communication System
26 Third26Fix 0% 21-Mar-21 13-Apr-21 -25 Telephone & Data Communication System Third Fix
Electrical Room (B) 158 158 0% 16-Dec-20 11-May-21 -44 11-May-21, Electrical Room (B)
Civil Works 133 133 0% 16-Dec-20 18-Apr-21 -44 18-Apr-21, Civil Works
Sub-Str ucture 53 53 0% 16-Dec-20 02-Feb-21 -44 02-Feb-21, Sub-Structure
Excavation for foundation 6 6 0% 16-Dec-20 21-Dec-20 -44 Excavation for foundation
Backfilling 6 6 0% 28-Jan-21 02-Feb-21 -44 Backfilling
Soil termite treatment 3 3 0% 22-Dec-20 23-Dec-20 -44 Soil termite treatment
bitumen paint 3 3 0% 18-Jan-21 19-Jan-21 -44 bitumen paint
PCC 3 3 0% 24-Dec-20 26-Dec-20 -44 PCC
Footing 6 6 0% 27-Dec-20 31-Dec-20 -44 Footing
Slab on grade 9 9 0% 20-Jan-21 27-Jan-21 -44 Slab on grade
Neck Column 9 9 0% 02-Jan-21 09-Jan-21 -44 Neck Column
Grade Beam 9 9 0% 10-Jan-21 17-Jan-21 -44 Grade Beam
Super Str ucture 80 80 0% 03-Feb-21 18-Apr-21 -44 18-Apr-21, Super Structure
Concr ete Wor ks 29 29 0% 03-Feb-21 01-Mar-21 -44 01-Mar-21, Concrete Works
Beams 9 9 0% 11-Feb-21 18-Feb-21 -44 Beams
Slabs 11 11 0% 20-Feb-21 01-Mar-21 -44 Slabs
Column 9 9 0% 03-Feb-21 10-Feb-21 -44 Column
Finishing Works 51 51 0% 02-Mar-21 18-Apr-21 -44 18-Apr-21, Finishing Works
Masonry Works 19 19 0% 02-Mar-21 18-Mar-21 -44 Masonry Works
Doors 6 6 0% 30-Mar-21 04-Apr-21 -44 Doors
Windows 6 6 0% 30-Mar-21 04-Apr-21 -44 Windows
Floor finish (concrete screed & epoxy)
6 6 0% 05-Apr-21 10-Apr-21 -44 Floor finish (concrete screed & epoxy)
Internal Cement Plastering 11 11 0% 20-Mar-21 29-Mar-21 -44 Internal Cement Plastering
External Painting works 9 9 0% 11-Apr-21 18-Apr-21 -44 External Painting works
Roof finishes 6 6 0% 30-Mar-21 04-Apr-21 -44 Roof finishes
Mechanical Wor ks 13 13 0% 30-Mar-21 10-Apr-21 -44 10-Apr-21, Mechanical Works
General Exhaust Fan 5 5 0% 30-Mar-21 03-Apr-21 -44 General Exhaust Fan
Gargouri drainage 4 4 0% 04-Apr-21 06-Apr-21 -44 Gargouri drainage
fire extinguisher 4 4 0% 07-Apr-21 10-Apr-21 -44 fire extinguisher
Electrical Works 58 58 0% 20-Mar-21 11-May-21 -44 11-May-21, Electrical Works
Panel Boards 6 6 0% 25-Apr-21 29-Apr-21 -44 Panel Boards
Lighting System First Fix (Conduits) 6 6 0% 20-Mar-21 24-Mar-21 -18 Lighting System First Fix (Conduits)
Power Installation 4 4 0% 29-Mar-21 31-Mar-21 -6 Power Installation
Conductors and cables 4 4 0% 25-Mar-21 28-Mar-21 -6 Conductors and cables
Earthing system 6 6 0% 01-May-21 05-May-21 -44 Earthing system
Fire Alarm System Fi rst F ix 6 6 0% 20-Mar-21 24-Mar-21 -18 Fire Alarm System Fi rst F ix
Lighting System Second Fix (Wires) 6 6 0% 19-Apr-21 24-Apr-21 -44 Lighting System Second Fix (Wires)
Lighting System Third Fix (Fixtures) 6 6 0% 06-May-21 11-May-21 -44 Lighting System Third Fix (Fixtures)
Fire Alarm System Second Fi x 6 6 0% 19-Apr-21 24-Apr-21 -44 Fire Alarm System Second Fi x
Fire Alarm System Third Fi x 6 6 0% 06-May-21 11-May-21 -44 Fire Alarm System Third Fi x
BUILDING (C) 349 349 0% 09-Jul-20 06-Jun-21 -71 06-Jun-21, BUILDING (C)
Main Building (C) 331 331 0% 09-Jul-20 20-May-21 -54 20-May-21, Main Building (C)
Civil Works 331 331 0% 09-Jul-20 20-May-21 -54 20-May-21, Civil Works
Sub-Str ucture 11 11 0% 09-Jul-20 19-Jul-20 -71 19-Jul-20, Sub-Structure
Remove of residues 11 11 0% 09-Jul-20 19-Jul-20 -71 Remove of residues
Super Str ucture 320 320 0% 20-Jul-20 20-May-21 -54 20-May-21, Super Structure
Concr ete Wor ks 141 141 0% 20-Jul-20 05-Dec-20 -71 05-Dec-20, Concrete Works
Supporting Wor ks 83 83 0% 22-Aug-20 07-Nov-20 -71 07-Nov-20, Supporting Works
Beams 18 18 0% 22-Oct-20 07-Nov-20 -71 Beams
Columns 30 30 0% 24-Sep-20 21-Oct-20 -71 Columns
Foundations 35 35 0% 22-Aug-20 22-Sep-20 -71 Foundations
Check and treatment 29 29 0% 20-Jul-20 20-Aug-20 -71 20-Aug-20, Check and treatment
Checking 11 11 0% 20-Jul-20 29-Jul-20 -71 Checking
Treatments 18 18 0% 30-Jul-20 20-Aug-20 -71 Treatments
Casting Works 30 30 0% 08-Nov-20 05-Dec-20 -71 05-Dec-20, Casting Works
Rambs 6 6 0% 30-Nov-20 05-Dec-20 -71 Rambs
Columns for staircase 6 6 0% 24-Nov-20 29-Nov-20 -71 Columns for staircase
Slabs & Beams 18 18 0% 08-Nov-20 23-Nov-20 -71 Slabs & Beams
Finishing Works 179 179 0% 06-Dec-20 20-May-21 -54 20-May-21, Finishing Works
Masonry Works 18 18 0% 06-Dec-20 21-Dec-20 -71 Masonry Works
Handrail & Protections 18 18 0% 07-Feb-21 22-Feb-21 -50 Handrail & Protections
Waterproofing for Bathroom & Ki tchen
4 4 0% 07-Jan-21 10-Jan-21 -51 Waterproofing for Bathroom & Ki tchen
Doors 19 19 0% 07-Feb-21 23-Feb-21 -54 Doors
Windows 30 30 0% 07-Feb-21 06-Mar-21 -54 Windows
Floor Finish (tiling & scerting) 30 30 0% 23-Mar-21 19-Apr-21 -49 Floor Finish (tiling & scerting)
Internal Cement Plastering 18 18 0% 22-Dec-20 06-Jan-21 -54 Internal Cement Plastering
Internal Painting Works (Primer + Filler
18 + 1st Coat)
18 0% 07-Mar-21 22-Mar-21 -54 Internal Painting Works (Primer + Filler + 1st Coat)
External Cement Plastering 21 21 0% 22-Dec-20 10-Jan-21 -54 External Cement Plastering
External Painting works 18 18 0% 15-Feb-21 02-Mar-21 -50 External Painting works
Aluminium strip 9 9 0% 23-Feb-21 02-Mar-21 -50 Aluminium strip
Gypsum board 11 11 0% 11-Jan-21 20-Jan-21 -50 Gypsum board
Counters 20 20 0% 23-Mar-21 10-Apr-21 -44 Counters
Specialies 18 18 0% 13-Jan-21 28-Jan-21 -54 Specialies
Painting Works (Final Coat) 11 11 0% 11-May-21 20-May-21 -54 Painting Works (Final Coat)
Ti les for Walls 9 9 0% 30-Jan-21 06-Feb-21 -54 Ti les for Walls
Roof finishes 18 18 0% 21-Jan-21 06-Feb-21 -50 Roof finishes
Roof sandwich panels 11 11 0% 11-Jan-21 20-Jan-21 -50 Roof sandwich panels
Ceiling Tiles 26 26 0% 21-Jan-21 14-Feb-21 -50 Ceiling Tiles
Mechanical Wor ks 150 150 0% 22-Dec-20 10-May-21 -54 10-May-21, Mechanical Works
Plumbing 141 141 0% 22-Dec-20 02-May-21 -45 02-May-21, Plumbing
Domestic Water Supply System 11 11 0% 22-Dec-20 31-Dec-20 -51 Domestic Water Supply System
Isolation valve 4 4 0% 02-Jan-21 04-Jan-21 -51 Isolation valve
Electric Water Heaters 14 14 0% 20-Apr-21 02-May-21 -45 Electric Water Heaters
Water Storage Tanks 14 14 0% 20-Apr-21 02-May-21 -45 Water Storage Tanks
Sanitary System 11 11 0% 22-Dec-20 31-Dec-20 -51 Sanitary System
Roof Scupper Drain 8 8 0% 07-Feb-21 13-Feb-21 -49 Roof Scupper Drain
Plumbing Fixtures 14 14 0% 20-Apr-21 02-May-21 -45 Plumbing Fixtures
Fire Fighting 128 128 0% 07-Jan-21 05-May-21 -49 05-May-21, Fire Fighting
Piping 6 6 0% 07-Jan-21 12-Jan-21 -54 Piping
Fire Hose Cabinet & Accessori es 26 26 0% 23-Mar-21 15-Apr-21 -45 Fire Hose Cabinet & Accessori es
fire extinguisher 9 9 0% 20-Apr-21 27-Apr-21 -49 fire extinguisher
Testing and calibrating existing works9 9 0% 28-Apr-21 05-May-21 -49 Testing and calibrating existing works
HVAC 70 70 0% 07-Mar-21 10-May-21 -54 10-May-21, HVAC
DX-Split units 35 35 0% 03-Apr-21 04-May-21 -54 DX-Split units
General Exhaust Fan 11 11 0% 07-Mar-21 16-Mar-21 -54 General Exhaust Fan
HVAC Ducts and Casings 18 18 0% 17-Mar-21 01-Apr-21 -54 HVAC Ducts and Casings
Air Curtain 6 6 0% 05-May-21 10-May-21 -54 Air Curtain
Electrical Works 145 145 0% 22-Dec-20 05-May-21 -49 05-May-21, Electrical Works
Electrical 145 145 0% 22-Dec-20 05-May-21 -49 05-May-21, Electrical
Panel Boards 11 11 0% 24-Mar-21 03-Apr-21 -49 Panel Boards
Lighting System First Fix (Conduits) 9 9 0% 22-Dec-20 29-Dec-20 -49 Lighting System First Fix (Conduits)
Power Installation 11 11 0% 22-Dec-20 31-Dec-20 -49 Power Installation
Bells system 11 11 0% 24-Mar-21 03-Apr-21 -49 Bells system
Sockets & Switches 18 18 0% 04-Apr-21 19-Apr-21 -49 Sockets & Switches
Conductors and cables 9 9 0% 02-Jan-21 09-Jan-21 -49 Conductors and cables
Earthing system 11 11 0% 24-Mar-21 03-Apr-21 -49 Earthing system
Lightening Protection System 11 11 0% 24-Mar-21 03-Apr-21 -49 Lightening Protection System
Lighting System Second Fix (Wires) 9 9 0% 16-Mar-21 23-Mar-21 -49 Lighting System Second Fix (Wires)
Lighting System Third Fix (Fixtures)18 18 0% 20-Apr-21 05-May-21 -49 Lighting System Third Fix (Fixtures)
Communications 140 140 0% 22-Dec-20 01-May-21 -44 01-May-21, Communications
Telephone & Data Communication System
15 First15
Fix 0% 22-Dec-20 04-Jan-21 -44 Telephone & Data Communication System First Fix
Floor Boxes 11 11 0% 03-Apr-21 12-Apr-21 -44 Floor Boxes

Actual Work Critical Remaining Work Summary Page 5 of 7 TASK filter: All Activities
Remaining Work Milestone © Primavera Systems, Inc.
Jubail complex Update up 28 May May Classic WBS Layout 01-Jun-20 15:15
Activity ID Activity Name Original Remaining Schedule % Start Finish Total February 2020 March 2020 April 2020 May 2020 June 2020 July 2020 August 2020 September 2020 October 2020 November 2020 December 2020 January 2021 February 2021 March 2021 April 2021 May 2021 June 2021 July 2021 August 2021
Duration Duration Complete Float 02 09 16 23 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 05 12 19 26 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01
Public Address system 11 11 0% 03-Apr-21 12-Apr-21 -44 Public Address system
Fire Alarm System Fi rst F ix 15 15 0% 22-Dec-20 04-Jan-21 -44 Fire Alarm System Fi rst F ix
Fire Alarm System Second Fi x 11 11 0% 23-Mar-21 01-Apr-21 -44 Fire Alarm System Second Fi x
Fire Alarm System Third Fi x 11 11 0% 21-Apr-21 01-May-21 -44 Fire Alarm System Third Fi x
Telephone & Data Communication System
11 Second
11 Fix 0% 23-Mar-21 01-Apr-21 -44 Telephone & Data Communication System Second Fix
Telephone & Data Communication System
11 Third11Fix 0% 21-Apr-21 01-May-21 -44 Telephone & Data Communication System Third Fix
Check in and check out monitoring system
9 9 0% 13-Apr-21 20-Apr-21 -44 Check in and check out monitoring system
Canteen (C) 179 179 0% 22-Dec-20 06-Jun-21 -71 06-Jun-21, Canteen (C)
Civil Works 179 179 0% 22-Dec-20 06-Jun-21 -71 06-Jun-21, Civil Works
Sub-Str ucture 53 53 0% 22-Dec-20 08-Feb-21 -71 08-Feb-21, Sub-Structure
Excavation for foundation 5 5 0% 22-Dec-20 26-Dec-20 -71 Excavation for foundation
Backfilling 3 3 0% 07-Feb-21 08-Feb-21 -71 Backfilling
Soil termite treatment 1 1 0% 27-Dec-20 27-Dec-20 -71 Soil termite treatment
bitumen paint 4 4 0% 24-Jan-21 26-Jan-21 -71 bitumen paint
PCC 3 3 0% 28-Dec-20 29-Dec-20 -71 PCC
Footing 9 9 0% 30-Dec-20 06-Jan-21 -71 Footing
Slab on grade 11 11 0% 27-Jan-21 06-Feb-21 -71 Slab on grade
Neck Column 9 9 0% 07-Jan-21 14-Jan-21 -71 Neck Column
Grade Beam 9 9 0% 16-Jan-21 23-Jan-21 -71 Grade Beam
Super Str ucture 126 126 0% 09-Feb-21 06-Jun-21 -71 06-Jun-21, Super Structure
Concr ete Wor ks 49 49 0% 09-Feb-21 25-Mar-21 -71 25-Mar-21, Concrete Works
Beams 11 11 0% 20-Feb-21 01-Mar-21 -71 Beams
Slabs 26 26 0% 02-Mar-21 25-Mar-21 -71 Slabs
Column 11 11 0% 09-Feb-21 18-Feb-21 -71 Column
Finishing Works 78 78 0% 27-Mar-21 06-Jun-21 -71 06-Jun-21, Finishing Works
Masonry Works 18 18 0% 27-Mar-21 11-Apr-21 -71 Masonry Works
Waterproofing for Bathroom & Ki tchen
4 4 0% 04-May-21 06-May-21 -71 Waterproofing for Bathroom & Ki tchen
Doors 6 6 0% 22-May-21 26-May-21 -71 Doors
Windows 6 6 0% 22-May-21 26-May-21 -71 Windows
Floor tiling 6 6 0% 16-May-21 20-May-21 -71 Floor tiling
Internal Cement Plastering 9 9 0% 20-Apr-21 27-Apr-21 -71 Internal Cement Plastering
External Cement Plastering 9 9 0% 12-Apr-21 19-Apr-21 -71 External Cement Plastering
External Painting works 9 9 0% 30-May-21 06-Jun-21 -71 External Painting works
Gypsum board 6 6 0% 28-Apr-21 03-May-21 -71 Gypsum board
Counters 9 9 0% 22-May-21 29-May-21 -71 Counters
Ti les for Walls 9 9 0% 08-May-21 15-May-21 -71 Ti les for Walls
Roof finishes 9 9 0% 04-May-21 11-May-21 -68 Roof finishes
Mechanical Wor ks 46 46 0% 12-Apr-21 24-May-21 -66 24-May-21, Mechanical Works
Plumbing 46 46 0% 12-Apr-21 24-May-21 -66 24-May-21, Plumbing
Domestic Water Supply System 4 4 0% 12-Apr-21 14-Apr-21 -66 Domestic Water Supply System
Electric Water Heaters 4 4 0% 22-May-21 24-May-21 -66 Electric Water Heaters
Sanitary System 4 4 0% 12-Apr-21 14-Apr-21 -58 Sanitary System
Roof Scupper Drain 4 4 0% 20-Apr-21 22-Apr-21 -56 Roof Scupper Drain
Plumbing Fixtures 4 4 0% 22-May-21 24-May-21 -66 Plumbing Fixtures
Sanitary Waste Pipi ng Specialties 4 4 0% 12-Apr-21 14-Apr-21 -58 Sanitary Waste Pipi ng Specialties
Fire Fighting 3 3 0% 22-May-21 23-May-21 -65 23-May-21, Fire Fighting
fire extinguisher 3 3 0% 22-May-21 23-May-21 -65 fire extinguisher
HVAC 8 8 0% 04-May-21 10-May-21 -51 10-May-21, HVAC
DX-Split wall mounted type air conditioning
4 units4 0% 08-May-21 10-May-21 -51 DX-Split wall mounted type air conditioning units
General Exhaust Fan 4 4 0% 04-May-21 06-May-21 -51 General Exhaust Fan
Electrical Works 35 35 0% 12-Apr-21 13-May-21 -55 13-May-21, Electrical Works
Electrical Power 35 35 0% 12-Apr-21 13-May-21 -55 13-May-21, Electrical Power
Power and Lighting panel 4 4 0% 04-May-21 06-May-21 -55 Power and Lighting panel
Power Installation 3 3 0% 21-Apr-21 22-Apr-21 -39 Power Installation
Disconnect Switches 1 1 0% 08-May-21 08-May-21 -55 Disconnect Switches
Conductors and cables 4 4 0% 18-Apr-21 20-Apr-21 -39 Conductors and cables
Lighting System First Fix (Conduits) 6 6 0% 12-Apr-21 17-Apr-21 -45 Lighting System First Fix (Conduits)
Lighting System Second Fix (Wires) 6 6 0% 28-Apr-21 03-May-21 -55 Lighting System Second Fix (Wires)
Lighting System Third Fix (Fixtures) 6 6 0% 09-May-21 13-May-21 -55 Lighting System Third Fix (Fixtures)
Communications 19 19 0% 12-Apr-21 28-Apr-21 -45 28-Apr-21, Communications
Telephone & Data Communication System
6 First Fix
6 0% 12-Apr-21 17-Apr-21 -45 Telephone & Data Communication System First Fix
Fire Alarm System Fi rst F ix 6 6 0% 12-Apr-21 17-Apr-21 -45 Fire Alarm System Fi rst F ix
Fire Alarm System Second Fi x 6 6 0% 18-Apr-21 22-Apr-21 -45 Fire Alarm System Second Fi x
Fire Alarm System Third Fi x 6 6 0% 24-Apr-21 28-Apr-21 -45 Fire Alarm System Third Fi x
Telephone & Data Communication System
6 Second
6 Fix 0% 18-Apr-21 22-Apr-21 -45 Telephone & Data Communication System Second Fix
Telephone & Data Communication System
6 Third 6Fix 0% 24-Apr-21 28-Apr-21 -45 Telephone & Data Communication System Third Fix
Guard House (C) 179 179 0% 22-Dec-20 06-Jun-21 -71 06-Jun-21, Guard House (C)
Civil Works 179 179 0% 22-Dec-20 06-Jun-21 -71 06-Jun-21, Civil Works
Sub-Str ucture 50 50 0% 22-Dec-20 06-Feb-21 -71 06-Feb-21, Sub-Structure
Excavation for foundation 6 6 0% 22-Dec-20 27-Dec-20 -71 Excavation for foundation
Backfilling 4 4 0% 03-Feb-21 06-Feb-21 -71 Backfilling
Soil termite treatment 3 3 0% 28-Dec-20 29-Dec-20 -71 Soil termite treatment
PCC 3 3 0% 30-Dec-20 31-Dec-20 -71 PCC
Footing 9 9 0% 02-Jan-21 09-Jan-21 -71 Footing
Slab on grade 9 9 0% 26-Jan-21 02-Feb-21 -71 Slab on grade
Neck Column 9 9 0% 10-Jan-21 17-Jan-21 -71 Neck Column
Grade Beam 9 9 0% 18-Jan-21 25-Jan-21 -71 Grade Beam
Super Str ucture 129 129 0% 07-Feb-21 06-Jun-21 -71 06-Jun-21, Super Structure
Concr ete Wor ks 45 45 0% 07-Feb-21 20-Mar-21 -71 20-Mar-21, Concrete Works
Beams 11 11 0% 15-Feb-21 24-Feb-21 -71 Beams
Slabs 25 25 0% 25-Feb-21 20-Mar-21 -71 Slabs
Column 9 9 0% 07-Feb-21 14-Feb-21 -71 Column
Finishing Works 84 84 0% 21-Mar-21 06-Jun-21 -71 06-Jun-21, Finishing Works
Masonry Works 18 18 0% 21-Mar-21 05-Apr-21 -71 Masonry Works
Waterproofing for Bathroom & Ki tchen
4 4 0% 27-Apr-21 29-Apr-21 -71 Waterproofing for Bathroom & Ki tchen
Doors 6 6 0% 16-May-21 20-May-21 -63 Doors
Windows 6 6 0% 16-May-21 20-May-21 -63 Windows
Floor Finish (tiling & scerting) 6 6 0% 10-May-21 15-May-21 -71 Floor Finish (tiling & scerting)
Internal Cement Plastering 11 11 0% 17-Apr-21 26-Apr-21 -71 Internal Cement Plastering
External Cement Plastering 11 11 0% 06-Apr-21 15-Apr-21 -71 External Cement Plastering
External Painting works 11 11 0% 27-May-21 06-Jun-21 -71 External Painting works
Aluminium strip 9 9 0% 17-Apr-21 24-Apr-21 -54 Aluminium strip
Counters 4 4 0% 16-May-21 18-May-21 -63 Counters
Specialies 4 4 0% 06-May-21 09-May-21 -71 Specialies
Ti les for Walls 6 6 0% 01-May-21 05-May-21 -71 Ti les for Walls
Roof finishes 18 18 0% 25-Apr-21 10-May-21 -54 Roof finishes
Mechanical Wor ks 55 55 0% 06-Apr-21 26-May-21 -71 26-May-21, Mechanical Works
DX-Split Units 6 6 0% 22-May-21 26-May-21 -71 DX-Split Units
General Exhaust Fan 6 6 0% 16-May-21 20-May-21 -71 General Exhaust Fan
Domestic Water Supply System 4 4 0% 06-Apr-21 08-Apr-21 -48 Domestic Water Supply System
Electric Water Heaters 3 3 0% 16-May-21 17-May-21 -61 Electric Water Heaters
Sanitary System 6 6 0% 12-Apr-21 17-Apr-21 -50 Sanitary System
Rain water Pipe & Scupper Drain 4 4 0% 18-Apr-21 20-Apr-21 -50 Rain water Pipe & Scupper Drain
Plumbing Fixtures 6 6 0% 16-May-21 20-May-21 -65 Plumbing Fixtures
fire extinguisher 4 4 0% 16-May-21 18-May-21 -63 fire extinguisher
Sanitary Specialties 6 6 0% 06-Apr-21 11-Apr-21 -50 Sanitary Specialties
Electrical Works 50 50 0% 06-Apr-21 22-May-21 -66 22-May-21, Electrical Works
Electrical 50 50 0% 06-Apr-21 22-May-21 -66 22-May-21, Electrical
Panel Boards 4 4 0% 05-May-21 08-May-21 -66 Panel Boards
Lighting System First Fix (Conduits) 9 9 0% 06-Apr-21 13-Apr-21 -53 Lighting System First Fix (Conduits)
Power Installation 6 6 0% 20-Apr-21 25-Apr-21 -46 Power Installation
Sockets & Switches 6 6 0% 09-May-21 13-May-21 -66 Sockets & Switches
Conductors and cables 6 6 0% 14-Apr-21 19-Apr-21 -46 Conductors and cables
Lighting System Second Fix (Wires) 9 9 0% 27-Apr-21 04-May-21 -66 Lighting System Second Fix (Wires)
Lighting System Third Fix (Fixtures) 9 9 0% 15-May-21 22-May-21 -66 Lighting System Third Fix (Fixtures)
Communications 35 35 0% 06-Apr-21 08-May-21 -51 08-May-21, Communications
Telephone & Data Communication System
6 First Fix
6 0% 06-Apr-21 11-Apr-21 -35 Telephone & Data Communication System First Fix
Fire Alarm System Fi rst F ix 6 6 0% 06-Apr-21 11-Apr-21 -35 Fire Alarm System Fi rst F ix
Fire Alarm System Second Fi x 6 6 0% 27-Apr-21 02-May-21 -51 Fire Alarm System Second Fi x
Fire Alarm System Third Fi x 6 6 0% 03-May-21 08-May-21 -51 Fire Alarm System Third Fi x
Telephone & Data Communication System
6 Second
6 Fix 0% 27-Apr-21 02-May-21 -51 Telephone & Data Communication System Second Fix
Telephone & Data Communication System
6 Third 6Fix 0% 03-May-21 08-May-21 -51 Telephone & Data Communication System Third Fix
Electrical Room (C) 159 159 0% 22-Dec-20 18-May-21 -51 18-May-21, Electrical Room (C)
Civil Works 159 159 0% 22-Dec-20 18-May-21 -51 18-May-21, Civil Works
Sub-Str ucture 51 51 0% 22-Dec-20 07-Feb-21 -51 07-Feb-21, Sub-Structure
Excavation for foundation 4 4 0% 22-Dec-20 24-Dec-20 -51 Excavation for foundation
Backfilling 3 3 0% 06-Feb-21 07-Feb-21 -51 Backfilling
Soil termite treatment 3 3 0% 26-Dec-20 27-Dec-20 -51 Soil termite treatment
bitumen paint 3 3 0% 24-Jan-21 25-Jan-21 -51 bitumen paint
PCC 3 3 0% 28-Dec-20 29-Dec-20 -51 PCC
Footing 9 9 0% 30-Dec-20 06-Jan-21 -51 Footing
Slab on grade 11 11 0% 26-Jan-21 04-Feb-21 -51 Slab on grade
Neck Column 9 9 0% 07-Jan-21 14-Jan-21 -51 Neck Column
Grade Beam 9 9 0% 16-Jan-21 23-Jan-21 -51 Grade Beam
Super Str ucture 108 108 0% 08-Feb-21 18-May-21 -51 18-May-21, Super Structure
Concr ete Wor ks 55 55 0% 08-Feb-21 30-Mar-21 -51 30-Mar-21, Concrete Works

Actual Work Critical Remaining Work Summary Page 6 of 7 TASK filter: All Activities
Remaining Work Milestone © Primavera Systems, Inc.
Jubail complex Update up 28 May May Classic WBS Layout 01-Jun-20 15:15
Activity ID Activity Name Original Remaining Schedule % Start Finish Total February 2020 March 2020 April 2020 May 2020 June 2020 July 2020 August 2020 September 2020 October 2020 November 2020 December 2020 January 2021 February 2021 March 2021 April 2021 May 2021 June 2021 July 2021 August 2021
Duration Duration Complete Float 02 09 16 23 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 05 12 19 26 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01
Beams 11 11 0% 24-Feb-21 06-Mar-21 -51 Beams
Slabs 26 26 0% 07-Mar-21 30-Mar-21 -51 Slabs
Column 18 18 0% 08-Feb-21 23-Feb-21 -51 Column
Finishing Works 53 53 0% 31-Mar-21 18-May-21 -51 18-May-21, Finishing Works
Masonry Works 15 15 0% 31-Mar-21 13-Apr-21 -51 Masonry Works
Doors 6 6 0% 26-Apr-21 01-May-21 -45 Doors
Windows 6 6 0% 26-Apr-21 01-May-21 -45 Windows
Floor finish (concrete screed & epoxy)
6 6 0% 20-Apr-21 25-Apr-21 -51 Floor finish (concrete screed & epoxy)
Internal Cement Plastering 6 6 0% 14-Apr-21 19-Apr-21 -51 Internal Cement Plastering
External Painting works 6 6 0% 13-May-21 18-May-21 -51 External Painting works
Roof finishes 6 6 0% 02-May-21 06-May-21 -45 Roof finishes
Mechanical Wor ks 19 19 0% 26-Apr-21 12-May-21 -51 12-May-21, Mechanical Works
General Exhaust Fan 6 6 0% 26-Apr-21 01-May-21 -51 General Exhaust Fan
Gargouri drainage 6 6 0% 02-May-21 06-May-21 -51 Gargouri drainage
fire extinguisher 6 6 0% 08-May-21 12-May-21 -51 fire extinguisher
Electrical Works 25 25 0% 14-Apr-21 06-May-21 -45 06-May-21, Electrical Works
Panel Boards 6 6 0% 26-Apr-21 01-May-21 -45 Panel Boards
Lighting System First Fix (Conduits) 6 6 0% 14-Apr-21 19-Apr-21 -45 Lighting System First Fix (Conduits)
Power Installation 6 6 0% 26-Apr-21 01-May-21 -45 Power Installation
Conductors and cables 6 6 0% 20-Apr-21 25-Apr-21 -45 Conductors and cables
Earthing system 6 6 0% 26-Apr-21 01-May-21 -45 Earthing system
Fire Alarm System Fi rst F ix 6 6 0% 14-Apr-21 19-Apr-21 -45 Fire Alarm System Fi rst F ix
Lighting System Second Fix (Wires) 6 6 0% 20-Apr-21 25-Apr-21 -45 Lighting System Second Fix (Wires)
Lighting System Third Fix (Fixtures) 6 6 0% 02-May-21 06-May-21 -45 Lighting System Third Fix (Fixtures)
Fire Alarm System Second Fi x 6 6 0% 20-Apr-21 25-Apr-21 -45 Fire Alarm System Second Fi x
Fire Alarm System Third Fi x 6 6 0% 02-May-21 06-May-21 -45 Fire Alarm System Third Fi x
Gate (C) 174 174 0% 22-Dec-20 01-Jun-21 -66 01-Jun-21, Gate (C)
Civil Works 174 174 0% 22-Dec-20 01-Jun-21 -66 01-Jun-21, Civil Works
Sub-Str ucture 56 56 0% 22-Dec-20 11-Feb-21 -66 11-Feb-21, Sub-Structure
Excavation for foundation 4 4 0% 22-Dec-20 24-Dec-20 -66 Excavation for foundation
Soil termite treatment 3 3 0% 26-Dec-20 27-Dec-20 -66 Soil termite treatment
bitumen paint 3 3 0% 21-Jan-21 23-Jan-21 -66 bitumen paint
PCC 3 3 0% 28-Dec-20 29-Dec-20 -66 PCC
Footing 6 6 0% 30-Dec-20 04-Jan-21 -66 Footing
Slab on grade 18 18 0% 24-Jan-21 08-Feb-21 -66 Slab on grade
Neck Column 9 9 0% 05-Jan-21 12-Jan-21 -66 Neck Column
Grade Beam 9 9 0% 13-Jan-21 20-Jan-21 -66 Grade Beam
Backfilling 4 4 0% 09-Feb-21 11-Feb-21 -66 Backfilling
Super Str ucture 118 118 0% 13-Feb-21 01-Jun-21 -66 01-Jun-21, Super Structure
Concr ete Wor ks 46 46 0% 13-Feb-21 27-Mar-21 -66 27-Mar-21, Concrete Works
Beams 9 9 0% 23-Feb-21 02-Mar-21 -66 Beams
Slabs 26 26 0% 03-Mar-21 27-Mar-21 -66 Slabs
Column 11 11 0% 13-Feb-21 22-Feb-21 -66 Column
Finishing Works 71 71 0% 28-Mar-21 01-Jun-21 -66 01-Jun-21, Finishing Works
Masonry Works 18 18 0% 28-Mar-21 12-Apr-21 -66 Masonry Works
Handrail & Protections 6 6 0% 25-Apr-21 29-Apr-21 -66 Handrail & Protections
Waterproofing for Bathroom & Ki tchen
6 6 0% 21-Apr-21 26-Apr-21 -64 Waterproofing for Bathroom & Ki tchen
Doors 6 6 0% 15-May-21 19-May-21 -61 Doors
Windows 6 6 0% 15-May-21 19-May-21 -61 Windows
Floor Finish (tiling & scerting) 9 9 0% 06-May-21 13-May-21 -64 Floor Finish (tiling & scerting)
Cement Plastering 9 9 0% 13-Apr-21 20-Apr-21 -66 Cement Plastering
External Painting works 9 9 0% 25-May-21 01-Jun-21 -66 External Painting works
Aluminium strip 4 4 0% 21-Apr-21 24-Apr-21 -66 Aluminium strip
Specialies 4 4 0% 03-May-21 05-May-21 -64 Specialies
Ti les for Walls 6 6 0% 27-Apr-21 02-May-21 -64 Ti les for Walls
Roof finishes & mosaic tile 9 9 0% 17-May-21 24-May-21 -66 Roof finishes & mosaic tile
External metal shades 18 18 0% 01-May-21 16-May-21 -66 External metal shades
Mechanical Wor ks 43 43 0% 13-Apr-21 22-May-21 -64 22-May-21, Mechanical Works
DX-Split units 9 9 0% 27-Apr-21 04-May-21 -45 DX-Split units
General Exhaust Fan 6 6 0% 21-Apr-21 26-Apr-21 -45 General Exhaust Fan
Domestic Water Supply System 9 9 0% 13-Apr-21 20-Apr-21 -48 Domestic Water Supply System
Electric Water Heaters 6 6 0% 15-May-21 19-May-21 -61 Electric Water Heaters
Sanitary System 9 9 0% 13-Apr-21 20-Apr-21 -48 Sanitary System
Plumbing Fixtures 9 9 0% 15-May-21 22-May-21 -64 Plumbing Fixtures
Sanitary Specialties 6 6 0% 15-May-21 19-May-21 -61 Sanitary Specialties
Electrical Works 23 23 0% 13-Apr-21 03-May-21 -44 03-May-21, Electrical Works
Electrical 23 23 0% 13-Apr-21 03-May-21 -44 03-May-21, Electrical
Panel Boards 4 4 0% 27-Apr-21 29-Apr-21 -44 Panel Boards
Lighting System First Fix (Conduits) 9 9 0% 13-Apr-21 20-Apr-21 -44 Lighting System First Fix (Conduits)
Power Installation 4 4 0% 27-Apr-21 29-Apr-21 -44 Power Installation
Sockets & Switches 4 4 0% 27-Apr-21 29-Apr-21 -44 Sockets & Switches
Conductors and cables 6 6 0% 21-Apr-21 26-Apr-21 -44 Conductors and cables
Lighting System Second Fix (Wires) 6 6 0% 21-Apr-21 26-Apr-21 -44 Lighting System Second Fix (Wires)
Lighting System Third Fix (Fixtures) 4 4 0% 01-May-21 03-May-21 -44 Lighting System Third Fix (Fixtures)
Communications 23 23 0% 13-Apr-21 03-May-21 -44 03-May-21, Communications
Telephone & Data Communication System
11 First11
Fix 0% 13-Apr-21 22-Apr-21 -44 Telephone & Data Communication System First Fix
Public Address system 4 4 0% 27-Apr-21 29-Apr-21 -44 Public Address system
Fire Alarm System Fi rst F ix 9 9 0% 13-Apr-21 20-Apr-21 -44 Fire Alarm System Fi rst F ix
Fire Alarm System Second Fi x 6 6 0% 21-Apr-21 26-Apr-21 -44 Fire Alarm System Second Fi x
Fire Alarm System Third Fi x 4 4 0% 01-May-21 03-May-21 -44 Fire Alarm System Third Fi x
Telephone & Data Communication System
4 Second
4 Fix 0% 24-Apr-21 26-Apr-21 -44 Telephone & Data Communication System Second Fix
Telephone & Data Communication System
4 Third 4Fix 0% 01-May-21 03-May-21 -44 Telephone & Data Communication System Third Fix
Water Tank & Pump Room (C) 151 151 0% 22-Dec-20 11-May-21 -44 11-May-21, Water Tank & Pump Room (C)
Civil Works 30 30 0% 22-Dec-20 18-Jan-21 -44 18-Jan-21, Civil Works
Cover & Ladder 6 6 0% 13-Jan-21 18-Jan-21 -44 Cover & Ladder
Test the filtration of the existing tank 6 6 0% 22-Dec-20 27-Dec-20 -44 Test the filtration of the existing tank
Pump Room 18 18 0% 28-Dec-20 12-Jan-21 -44 Pump Room
Mechanical Wor ks 44 44 0% 19-Jan-21 28-Feb-21 -44 28-Feb-21, Mechanical Works
Fire Pump 26 26 0% 19-Jan-21 11-Feb-21 -44 Fire Pump
Water Transfer Pumps 18 18 0% 13-Feb-21 28-Feb-21 -44 Water Transfer Pumps
Electrical Works 78 78 0% 01-Mar-21 11-May-21 -44 11-May-21, Electrical Works
Sockets & Switches 4 4 0% 08-Mar-21 10-Mar-21 -44 Sockets & Switches
Fire Alarm System Fi rst F ix 4 4 0% 01-Mar-21 03-Mar-21 -44 Fire Alarm System Fi rst F ix
Fire Alarm System Second Fi x 4 4 0% 04-Mar-21 07-Mar-21 -44 Fire Alarm System Second Fi x
Fire Alarm System Third Fi x 4 4 0% 09-May-21 11-May-21 -44 Fire Alarm System Third Fi x

Testing & Commissioning 16 16 0% 07-Jun-21 21-Jun-21 -71 21-Jun-21, Testing & Commissioning

A21010 Testing & Commissioning 16 16 0% 07-Jun-21 21-Jun-21 -71 Testing & Commissioning

Hnading Over 9 9 0% 28-Jun-21 05-Jul-21 -71 05-Jul-21, Hnading Over

A4300 Handing Over 9 9 0% 28-Jun-21 05-Jul-21 -71 Handing Over

Actual Work Critical Remaining Work Summary Page 7 of 7 TASK filter: All Activities
Remaining Work Milestone © Primavera Systems, Inc.