+375 47+400 47+425 47+450 47+475 47+500 47+525 47+550 47+575 47+600 47+625 47+650 47+675 47+700 47+725 47+750
ELEVATION FROM DRAWING
a. final elevation FINISH GRADE (FG) 10.5250 10.4500 10.3750 10.3000 10.2250 10.1500 10.0750 10.0000 9.9250 9.8500 9.7710 9.6710 9.5490 9.4050 9.2390 9.0510 8.8420 8.6110
b. final soil TOP SUBGRADE (1) 9.8250 9.7500 9.6750 9.6000 9.5250 9.4500 9.3750 9.3000 9.2250 9.1500 9.0710 8.9710 8.8490 8.7050 8.5390 8.3510 8.1420 7.9110
c. Original Ground Level 1.2350 1.2760 1.1880 1.2540 1.0930 1.2680 1.3010 0.9540 0.9510 0.9110 0.6130 0.9170 1.1200 1.2020 1.3260 1.4170 0.8550 0.9490
d. Platform Elevation
IMPROVEMENT WIDTH
j. Typical Width of Road [m] (4) 29.02 29.02 29.02 29.02 29.02 29.02 29.02 29.02 29.02 29.02 29.02 29.02 29.02 29.02 29.02 29.02 29.02 29.02
k. Width of Slope (1:2) for Both Side 32.82 32.35 32.40 31.84 32.18 31.18 30.75 31.84 31.55 31.41 32.29 30.67 29.37 28.47 27.31 26.19 27.60 26.30
l. Propose Improvement width [m] (1m from Slope Toe) 64 63 63 63 63 62 62 63 63 62 63 62 60 59 58 57 59 57
m. Total vacuum area [m2] 1,600 1,575 1,575 1,575 1,575 1,550 1,550 1,575 1,575 1,550 1,575 1,550 1,500 1,475 1,450 1,425 1,475 1,425
LOAD RATIO CALCULATION
n. Improvement Load [t/m2]= VCM + Permanent Backfill (exl. Settlement compensa 21.74 21.56 21.58 21.35 21.49 21.09 20.92 21.35 21.24 21.18 21.53 20.89 20.37 20.00 19.54 19.09 19.66 19.14
o. Operational Load [t/m2](5) 18.94 18.75 18.77 18.55 18.68 18.28 18.11 18.55 18.43 18.37 18.72 18.08 17.56 17.20 16.73 16.29 16.85 16.33
p. Load Rasio (Backfill for Leveling during vacuum process) 1.15 1.15 1.15 1.15 1.15 1.15 1.16 1.15 1.15 1.15 1.15 1.16 1.16 1.16 1.17 1.17 1.17 1.17