Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Dear Sir, 18/06/2024

QUOTATION FOR FRONT FACADE

We hereby submit our quotation as follows;

MATERIAL SPECIFICATION:
3MM LASER PLATE, 3 x 3 x 2MM PIPE, 3 x 1½ x 2MM PIPE, 3 x 3 x 5MM ANGLE IRON

ITEMS DESCRIPTION QTY UNIT COST AMOUNT


1. 3 x 3 x 2mm Square Pipe 45 30,000 1,350,000
2. 3 x 1½ x 2mm 25 27,000 675,000
Square Pipe
3. 3 x 3 x 5 Angle Iron 6 35,000 210,000
4. 3mm Laser Cut Sheets 26 115,000 2,990,000
5. Anti-Rust and Final - - 750,000
Painting
6. Consumables - - 200,000
7. Logistics - - 150,000
8. Fabrication and - - 1,300,000
Installation
TOTAL N7,625,000
Amount in words: Seven Million, Six Hundred and Twenty-Five Thousand Naira Only.

ANGLE SIDE FACADE (USING 3MM LASER DESIGN PLATE)


ITEMS DESCRIPTION DIMENSION QTY UNIT COST AMOUNT
PER METER
1. Angle Side Facade 6.0 x 1.2m 2 125,000 1,800,000
TOTAL - - - N1,800,000
Amount in words: One Million, Eight Hundred Thousand Naira Only.
ALUCO BOARD FACADE CLOUDY
ITEMS DESCRIPTION QTY UNIT COST AMOUNT
1. Aluco Board 38 37,000 1,406,000
2. Installation Accessories 38 21,000 798,000
3. Installation of Aluco Board - - 550,000
4. Logistics - - 80,000
TOTAL - - N2,834,000
Amount in words: Two Million, Eight Hundred and Thirty-Four Thousand Naira Only.

SUMMARY
ITEMS DESCRIPTION AMOUNT
1. FRONT FACADE 7,625,000
2. ANGLE SIDE FACADE 1,800,000
3. ALUCO BOARD FACADE 2,834,000
CLOUDY
GRAND TOTAL N12,259,000
Amount in words: Twelve Million, Two Hundred and Fifty-Nine Thousand
Naira Only

NOTE:
➢ Our work does not entail any form of masonry activity. (Sand, Cement and Granite)
➢ Scaffold or ladder will be provided by client where necessary.
PROPOSED FACADE DESIGN

Terms of Payment
80% mobilization fee.
10% part payment on resumption of work.
10% balance on work completion.
Validity of Quote: 5 Days

Account Name: ARC METALS NIG CO


Account No: 2014893038
Bank: First Bank

Thanks for your patronage


For: Arc metals Nig. co

NWANDU KINGSLEY
Managing Director.

You might also like