Professional Documents
Culture Documents
GRP-08-TS000-SGC-ELE-CRS-00003_Rev01[1]
GRP-08-TS000-SGC-ELE-CRS-00003_Rev01[1]
GRP-08-TS000-SGC-ELE-CRS-00003_Rev01[1]
CRS LEGEND:
Comment Sheet No. CRS Status Issued Date
Rev. A = Approved
B = Approved with comments E = Rejected
GRP-08-TS000-SGC-ELE-CRS-00003 01 B 04/07/2024 C = Approved with comments & F = No action
resubmit
Remarks: Comments given in this Comment Sheet are for technical clarification only and have no commercial impact.
The approval of the document does not release the Contractor from his Contract obligations. Page 1 of 5
CONSTRUCTION OF TSE NETWORK FOR
GREEN RIYADH PROGRAM - GROUP FIVE A
CRS LEGEND:
Comment Sheet No. CRS Status Issued Date
Rev. A = Approved
B = Approved with comments E = Rejected
GRP-08-TS000-SGC-ELE-CRS-00003 01 B 04/07/2024 C = Approved with comments & F = No action
resubmit
certificates.
Also, Document title shall be updated if it is manufacturer ITP
1.1 GRP/PMC Comments Rev01 Contractor’s Reply
JA Closed as confirmed that the FAT ITP shall be submitted separately.
2 GRP/PMC Comments Rev00 Contractor’s Reply
In ITP for section Specification/Drawing and Acceptance Criteria, Contractor to
add following detail for each activity. 1.complied and added.
1) Client Specs, clause, and part number 2.. complied and added.
JA
2) Wiring Drawing, Panel schedule, IFC Drawing 3. MST: complied and added. & Material submittal on going.
3) MST, Material submittal numbers 4)third party name not applicable now.
4) Third Party name shall be added (If applicable)
2.1 GRP/PMC Comments Rev01 Contractor’s Reply
1) Closed.
2) Attached drawings are not related to group-5A, please add only
JA references from group-5A.
3) Closed
4) Closed as confirmed.
3 GRP/PMC Comments Rev00 Contractor’s Reply
Remarks: Comments given in this Comment Sheet are for technical clarification only and have no commercial impact.
The approval of the document does not release the Contractor from his Contract obligations. Page 2 of 5
CONSTRUCTION OF TSE NETWORK FOR
GREEN RIYADH PROGRAM - GROUP FIVE A
CRS LEGEND:
Comment Sheet No. CRS Status Issued Date
Rev. A = Approved
B = Approved with comments E = Rejected
GRP-08-TS000-SGC-ELE-CRS-00003 01 B 04/07/2024 C = Approved with comments & F = No action
resubmit
Remarks: Comments given in this Comment Sheet are for technical clarification only and have no commercial impact.
The approval of the document does not release the Contractor from his Contract obligations. Page 3 of 5
CONSTRUCTION OF TSE NETWORK FOR
GREEN RIYADH PROGRAM - GROUP FIVE A
CRS LEGEND:
Comment Sheet No. CRS Status Issued Date
Rev. A = Approved
B = Approved with comments E = Rejected
GRP-08-TS000-SGC-ELE-CRS-00003 01 B 04/07/2024 C = Approved with comments & F = No action
resubmit
2) Closed with note. This submitted ITP shall not need to submit again.
5.1 GRP/PMC Comments Rev01 Contractor’s Reply
As per client specs 26 24 16 clause 3.3 part b, please add more testing to ITP
activity 4.0 on page 3. Please refer below points,
JA
1) Continuity for grounding system
2) Insulation resistance test
6.1 GRP/PMC Comments Rev01 Contractor’s Reply
JA Following to be corrected and added
2) Need to add one more page or edit somewhere suitable to write the
Remarks: Comments given in this Comment Sheet are for technical clarification only and have no commercial impact.
The approval of the document does not release the Contractor from his Contract obligations. Page 4 of 5
CONSTRUCTION OF TSE NETWORK FOR
GREEN RIYADH PROGRAM - GROUP FIVE A
CRS LEGEND:
Comment Sheet No. CRS Status Issued Date
Rev. A = Approved
B = Approved with comments E = Rejected
GRP-08-TS000-SGC-ELE-CRS-00003 01 B 04/07/2024 C = Approved with comments & F = No action
resubmit
Remarks: Comments given in this Comment Sheet are for technical clarification only and have no commercial impact.
The approval of the document does not release the Contractor from his Contract obligations. Page 5 of 5