Walkdown comments of 20GMA01-10 (EDG Area Oily Wastewater Lift Station )

RFI No. 19K9-SCT-RFI-E10-0268 7/9/2024


Package. 20GMA01-16 (Fire Fighting Pump Container Package Area Oily Waste Water Lift Station ) Walkdown Punch List - Electrical Part
Desc.
Location Fire Fighting Pump Container Package Area
S. No. Comment Description Category Remarks
1 Cable route to be updated as it is not matching with the actual routing . C
2 Openings to be closed with duct sealant (MCC side ). C
3 LCP Geouning RFI to be attached inside the Package . C
4 Inside the Pit motors cables to be arranged with stainless steel cable ties. C
Splice Plates & Tray Supports rusted bolts to be replaced ,cable dressing ,tray
5 C
grounding ,Cover & tray section supports to be provided.(In the Route & workshop)