Professional Documents
Culture Documents
Takenaka Corporation_ZEB
Takenaka Corporation_ZEB
2018.10.5
Renewable Energy Institute / Green Building Symposium
Promotion of
Energy saving Renovation of Existing
middle and small stock buildings 98 %
Nov./2003 Mar./2016
Before After
Interior of the building after renovation
Building outline
・Maximum use of daylighting, natural vent. & control ・Significant reduction of thermal load
by renovation of facade
・Temperature control by radiant cooling & heating
・LED task & ambient lighting & control
・Humidity control by desiccant air conditioning
・Ceiling radiant cooling & heating
・Airflow control by personal diffuser
・direct use of geo-thermal
・direct use of solar heat
・Maximum use of daylighting, natural vent. & control ・Significant reduction of thermal load
by renovation of facade
・Temperature control by radiant cooling & heating
・LED task & ambient lighting & control
・Humidity control by desiccant air conditioning
・Ceiling radiant cooling & heating
・Airflow control by personal diffuser
・direct use of geo-thermal
・direct use of solar heat
Filing area
Communication area
Workplace
Entrance
Various Technologies for ZEB Renovation
Solar panel
Solar heat collecting panel
Natural lighting and natural ventilation from top
Enhanced thermal lights
insulation of roof and
external walls
Reuse of existing
aluminum fins
Low humidity by desiccant air
Radiant panel conditioning
Installation of
double skin
Sunshade by external Natural ventilation
blinds (automatic control)
Thermal insulation
enhancement by replacement
with high thermal insulation
glass Geothermal heat collecting piles and
direct use of geothermal heat
Natural ventilation opening Daylight from both side Personal diffuser LED lighting
Double skin (blind automatic control)
(automatic control)
Radiant cooling & heating panel Geothermal heat using pile Solar heat collecting panel PV panel
(Heat exchanger: Borehole)
Others;
Remote building control system with cloud,
Technologies of ZEB renovation Battery for BCP, and so on.
Enovation of Exterior (roof, wall, glass and double skin)
Before Renovation
Roof: +100mm insulating
(=3.94 inch)
Sun-shading external
blinds Replacement with high thermal
insulation glass (argon-gas-charged
low-ε glass)
Detail of exterior
Direct Use of Geothermal Heat
Radiant panel
Dessicant air
conditioner
Geothermal heat collecting pile
(During construction)
parking
space
Depth: 67 m
Boreholes
Summer Winter
Solar heat panel Solar heat panel
Use for re-heat of desiccant AC in summer Use for radiating heating in winter
Cooling
WHP-1 (for desiccant)
M.
2016 J. 40%A.geothermal
J. S. O. N.
AHP-1 (for desiccant and radiant panels)
D.
J. F. M. A. M. J. J. A. S.
2017
AHP-2
(for desiccant) WHP-1 (for desiccant and radiant panels)
80 800
0 0 0 0
M. J. J. A. S. O. N. D. J. F. M. A. Before Predicted Actual
-40 13.0 -400
417 403
-80 -800
* 403 MJ/year/m2 = 35.5 kBtu / ft2 (primary) = 13.1 kBtu / ft2 (EUI)
417 MJ/year/m2 = 36.7 kBtu / ft2 (primary) = 13.5 kBtu / ft2 (EUI)
Exhaust
Flow-channel-switching moisture absorption and
desorption equipment
Static total heat
exchanger
Return air
Air supply
Outdoor air
Outside dimensions:
2,250 (W) 1,050 (D) 450 (H)
14
6
Feb. 4
0.5 clo zone
2
0
20 21 22 23 24 25 26 27 28 29
Operative Temperature (°
C)
温度 ℃
24.
5
風向:北 24.0
23.5
23.0
22.5
Natural ventilator (auto control) Natural exhaust (auto control) CFD of Natural ventilation(Temp.) 22.0
Summer(July)
Radiant Ceiling
Low-partition wall panel surface Window glass
surface
Floor surface
Desktop
Winter(Dec.)
Radiant Ceiling
panel surface
Low-partition wall
surface
Window glass
Desktop
Floor surface
Personal Diffuser
(m/s)
This personal diffuser utilizes a nozzle installed on the ceiling surface to create an air
flow towards an individual’s face.
Each worker can adjust the air volume from their own super-small fan.
Wellness Control by wearable devices
Personal diffuser
Radiant cooling
Wearable Devices & heating panel
Wellness Control by wearable devices
Annual energy balance(Actual result)
Annual
年 間 G︓生成
Generation
建築物
417
203 217
D︓配送 E︓逆送
Delivered 403 Exported
C︓消費
Consumption
空調 照明 コンセント その他
174 53 151 25
[MJ/㎡・a]
AC Lighting Plug Others
Comparison of primary energy consumption and annual energy balance
before and after renovation
EUI
1600
[kBtu/(ft2・year)]
Actual Primary Energy Consumption(MJ/m2・year)
Others Lighting Air Conditioning & ventilation Power Outlet
45.5 1400
13.1 400
Downsizing PC Devices
200 Sharing of eco‐saving 30
30 %
32% Reduction
Reduction
copy machines and others Net Zero Energy Building
0
-0.5
Before Renovation After Renovation After Renovation
‐200 (Including PV)
Generation Consumption
-417 Photovoltaics
Lighting 53
Others 25