REVISION REGISTER
Clause Authorised
Description of Revision Issue Date
Number By
Clause 828.06.1 Sub-clause amended SDSE 28/04/2023
Clause 828.06.2 Sub-clause amended SDSE 28/04/2023
Clause 828.08.1 Increased positive cover tolerance SDSE 28/04/2023
Clause 828.09.8 Hold point: stressing calculation submission time SDSE 28/04/2023
increased from 1 day to minimum 5 days
Clause 828.09.11 Additional subclause has been added for SDSE 28/04/2023
prestressing requirements
Clause 828.11.4 Sub-clause amended SDSE 28/04/2023
Clause 828.13.2 Sub-clause amended SDSE 28/04/2023
Clause 828.91.1.1 Sub-clause amended SDSE 28/04/2023
Whole document Reformatted SCO 03/05/2017
Clause 828.02 Redundant AS 1554.3 removed A/SDSE 11/06/2010
Whole document Complete revision of Issue 1.3 to new format MCP 01/08/2006
Table of Contents
GENERAL 4
828.01 SCOPE 4
828.02 REFERENCES 4
828.03 – 828.05 NOT USED 4
MANUFACTURE 4
828.06 GENERAL 5
828.07 FORMWORK 5
828.08 REINFORCEMENT 5
828.09 PRESTRESS 5
828.10 CONCRETE 6
828.11 TRANSFER OF PRESTRESS 7
828.12 RECORDS 7
828.13 MEMBER TOLERANCES 7
828.14 MARKING OF MEMBERS 7
828.15 – 828.25 NOT USED 7
INSTALLATION 8
828.41 GENERAL 8
828.42 WELDING OF POSITIVE MOMENT CONNECTION REINFORCEMENT AT BEAM
ENDS 9
828.43 PLANK JOINTS 9
828.44 DECK CONCRETE OVERLAY 9
828.45 – 828.80 NOT USED 9
SPECIFICATION 828
GENERAL
828.01 SCOPE
1. The work under this specification consists of the supply and installation of
precast concrete members (beams and planks).
828.02 REFERENCES
Australian Standards
AS 1349 Bourdon Tube Pressure and Vacuum Gauges
AS 5100 Bridge Design
Other Standards
Concrete Institute of Australia Precast Concrete Handbook (2002)
MANUFACTURE
828.06 GENERAL
3. Some beams are required to have holes located in the webs for subsequent
attachment of formwork during bridge construction. The location and size of
these holes and the number of beams requiring these holes are detailed on
the Drawings.
828.07 FORMWORK
828.08 REINFORCEMENT
828.09 PRESTRESS
2. The stressing bed shall have the capacity to safely accommodate the forces
involved for the pretensioned member being manufactured.
8. At least five (5) Business Days prior to the proposed pretensioning of HOLD POINT
each member or line of members, the Contractor shall submit to the
Superintendent stressing calculations, Engineer's certification and the
representative test certificates for each member.
10. Strands at the ends of units shall be cut off flush or left protruding as
detailed on the drawings. Strands cut off flush shall be coated with epoxy
resin to prevent rusting. Strands left protruding shall be coated with cement
grout.
11. Where debonding of strands is shown in the drawings, PVC sheathing tubes
with external diameter not exceeding the strand diameter plus 3mm must be
utilised. Rigid electrical conduits must not be utilised as sheathing. The
sheathing tube must be extended beyond the end of the member and
sealed sufficiently to prevent ingress of mortar.
828.10 CONCRETE
a. If the Contractor proposes to use external type vibrators for concrete Compaction
compaction then evidence shall be provided to show that the same
level of compaction as achieved by immersion vibrators.
1. The Contractor shall use methods that minimise the shock transfer of stress
during the release of tendons. Examples of non-complying methods include
cutting through with a disk grinder, and severing the tendons directly and
quickly with a naked flame.
2. The transfer of the prestressing force from the stressing bed to the member
shall not occur until the concrete has reached the minimum transfer
strength specified in the Drawings.
3. Prior to transfer all tendons shall be checked to ensure all tendons are tight.
4. The slippage of each tendon into the concrete at transfer shall be visually
inspected. Localised spalling around fully bonded strands at transfer as a
result of excessive slippage shall be identified as a nonconformance and
treated in accordance with Specification 201 – QUALITY MANAGEMENT.
828.12 RECORDS
2. Precast pretensioned concrete planks shall conform to the dimensions and Planks
details given on the Drawings.
1. Each precast concrete member shall be clearly marked using distinguishing Identification
numbers or letters consistent with those shown on the Drawings.
828.26 GENERAL
828.27 LIFTING
1. Precast concrete members shall be kept in the upright position at all times
and shall only be lifted from the specified lifting points. Precast concrete
members shall be lifted using either a full length steel lifting beam or two
cranes to ensure the force at the lifting points is in accordance with the
Drawings.
828.28 TRANSPORT
828.29 STACKING
INSTALLATION
828.41 GENERAL
1. The Contractor shall observe the rules and procedures of welding laid down
in AS/NZS 1554.3.
1. Plank locating dowels shall be fully installed and grouted before placing any
shear key concrete.
2. The shear keys between planks shall be adequately sealed at their lower
section as detailed on the Drawings before placing the shear key concrete.
3. The shear key concrete shall be placed in a continuous operation for each
shear key for each plank length. Concrete shall be compacted using a
25mm maximum diameter pencil vibrator in accordance with Specification
820 CONCRETE FOR STRUCTURES.
4. Joints between plank ends over the piers shall be filled with a cement
mortar with a water/cement ratio by mass not exceeding 0.42 and a
sand/cement ratio by mass of 3.0. The mortar shall be rodded into the joint
to achieve maximum compaction.
1. The deck concrete overlay shall not be placed earlier than 3 days after the
completion of all plank shear key joints.
2. Before the deck concrete overlay is placed the top surface of the precast
concrete units shall be thoroughly cleaned with a water jet to remove dust
and chips and any other foreign matter.
4. All other work for the deck concrete overlay shall be in accordance with
Specification 820 CONCRETE FOR STRUCTURES.
GUIDANCE NOTES
FOR REFERENCE ONLY – DELETE GUIDANCE NOTES FROM FINAL DOCUMENT
1. All edits to downloaded Specifications shall be made using Track Changes, to clearly show
added/deleted text.
2. If all information relating to a clause is deleted, the clause number should be retained and the
words “NOT USED” should be inserted.
3. The proposed documents with tracked changes shall be submitted to the Project Manager for
review, prior to printing the final batch of documents. When this final printing is carried out, the
tracked changes option is to be turned off.
4. Before printing accept all changes in the document, turn off Track Changes and refresh the
Table of Contents.
5. The Custodian of this specification is the Structures Design and Standards Engineer.
1.1 If the Principal will pre-supply precast concrete members, include Clause 828.91 in the
CONTRACT SPECIFIC REQUIREMENTS Section, complete and incorporate Annexure
828A into the Specification document.
1.2 Annexure 828A is provided for listing Principal supplied items such as precast concrete
beams and planks, in which case any Clauses relating to manufacture should be deleted
and marked as “Not Used”. The description to be entered in Annexure 828A should
include identification with items shown on the Drawings, and the location for pick-up of
precast members.
828.91.01 GENERAL
1. The number and type of precast concrete members which will be supplied
by the Principal free of charge to the Contractor is given in Annexure 828A.
These will conform to the dimensions specified on the Drawings within the
tolerances specified in the Specifications. All units have been precast
under factory conditions.
2. Holes are provided on the beam webs for the attachment of falsework. The
drilling of other holes in the beam will not be permitted.
828.91.02 SUPPLY
1. The precast concrete members will be stored in the Perth metropolitan area
and will be available to the Contractor at the times and locations shown in
Annexure 828A. The Contractor shall provide all equipment, plant and
labour necessary for the transportation of the beams and planks to the Site.
ANNEXURE 828A
Beam Type B
Plank Type A
Plank Type B
(NOTE: This Annexure is used in conjunction with Clause 828.91 and should be varied as required to suit.)
AMENDMENT CHECKLIST