SummarySheet-OT-46237.

pdf LM_Patiala - Ismailabad

SUMMARY SHEET FOR OT


Summary Sheet No.: SummarySheet-OT-46237.pdf
Contractor : SUSHIL KUMAR GUPTA & CO
Contractor Code: 0000392237
W.O. No.: 0013043531
Link Name: Bahadurpur Fakiran-Ismailabad
Link ID: PBPTILHRIMBDCLD005_BU
Span Name: LM_Patiala - Ismailabad (317) - 01-HR_1_23500
Span ID: LM_PBPTILHRIMBDSPR001_BU_23500
ITP Start Date: 25-09-2023
ITP End Date: 25-09-2023

Material Code Material Description Length in Mtr


2001130229 DUCT,HDPE,BLUE,LUB,40 OD X 3.5MM 20.00
THK

Sr.No. ITP Sheet No. ITP Sheet Chainage (Mtrs.) Road Actual Length Duct Strata Protection Remarks
Date Chainage (Mtrs.)
From To (Mtrs.) Trenching Type Length ITP No.
(Mtrs.) (Mtrs.)
1 ITP32_227888_81552_1 (0 22.10.2023 0 20 20 20.00 1 Normal 0
- 20)
Total: 20 20

Strata Total Length (Mtrs.) Protection Type Total Length (Mtrs.)


Normal 20

Created By VINAY DIXIT Approved By Sumit.Wadhwa Contractor Name SUSHIL KUMAR GUPTA & CO
Signature Signature Signature
Date 08-01-2024 16:28:20 Date 13-1-2024 14:44 Date

Page 1 of 1
SummarySheet-HDD-45619.pdf LM_Patiala - Ismailaba

SUMMARY SHEET FOR HDD


Summary Sheet No.: SummarySheet-HDD-45619.pdf
Contractor : SUSHIL KUMAR GUPTA & CO
Contractor Code: 0000392237
W.O. No.: 0013043531
Link Name: Bahadurpur Fakiran-Ismailabad
Link ID: PBPTILHRIMBDCLD005_BU
Span Name: LM_Patiala - Ismailabad (317) - 01-HR_1_23500
Span ID: LM_PBPTILHRIMBDSPR001_BU_23500
ITP Start Date: 25-09-2023
ITP End Date: 22-10-2023

Material Code Material Description Length in Mtr


2001130229 DUCT,HDPE,BLUE,LUB,40 OD X 3.5MM 272.00
THK

Sr.No. ITP Sheet No. ITP Sheet Date Chainage (Mtrs.) Road Chainage Actual Length (Mtrs.) No. of Ducts Remarks
From To Length (Mtrs.) HDD
1 ITP01_227888_81552_2 (20 - 22.10.2023 20 52 32 32.00 10
187)
2 ITP01_227888_81552_2 (20 - 22.10.2023 52 187 135 135.00 10
187)
3 ITP01_227888_81552_3 (0 - 22.10.2023 0 34 34 34.00 10
105)
4 ITP01_227888_81552_3 (0 - 22.10.2023 34 105 71 71.00 10
105)
Total: 272 272

No. of Ducts Length (Mtrs.) RJIL HDD Machine (Mtrs.) Non RJIL HDD Machine (Mtrs.)
1 272 0 272

Material Code Material Description Length in Mtr


2001130229 DUCT,HDPE,BLUE,LUB,40 OD X 3.5MM 272.00
THK

Created By VINAY DIXIT Approved By Sumit.Wadhwa Contractor Name SUSHIL KUMAR GUPTA & CO
Signature Signature Signature
Date 08-01-2024 16:29:03 Date 9-1-2024 12:54 Date

Page 1 of 1
SummarySheet-MH-59845.pdf LM_Patiala - Ismailabad

SUMMARY SHEET FOR MH


Summary Sheet No.: SummarySheet-MH-59845.pdf
Contractor : SUSHIL KUMAR GUPTA & CO
Contractor Code: 0000392237
W.O. No.: 0013043531
Link Name: Bahadurpur Fakiran-Ismailabad
Link ID: PBPTILHRIMBDCLD005_BU
Span Name: LM_Patiala - Ismailabad (317) - 01-HR_1_23500
Span ID: LM_PBPTILHRIMBDSPR001_BU_23500
ITP Start Date: 26-09-2023
ITP End Date: 26-09-2023

Material Code Material Description Count


2001550387 MANHOLE,NP2,900MM DIA X 825MM 4
HT;W/COVER

Sr.No. ITP Sheet No. ITP Sheet Date Chainage (Mtrs.) Lat Long Remarks Type of MH/HH
From To
1 ITP33_227888_81552_1 22.10.2023 0 20 30.13608 76.66630 0 MANHOLE,NP2,900MM DIA X
(0 - 20) 825MM HT;W/COVER
2 ITP33_227888_81552_2 22.10.2023 20 52 30.13600 76.66601 0 MANHOLE,NP2,900MM DIA X
(20 - 187) 825MM HT;W/COVER
3 ITP33_227888_81552_3 22.10.2023 0 34 30.13608 76.66595 0 MANHOLE,NP2,900MM DIA X
(0 - 105) 825MM HT;W/COVER
4 ITP33_227888_81552_3 22.10.2023 0 34 30.13608 76.66630 0 MANHOLE,NP2,900MM DIA X
(0 - 105) 825MM HT;W/COVER
Total No. of MH/HH: 4

Type of MH Quantity
MANHOLE,NP2,900MM DIA X 825MM 4
HT;W/COVER
Total No. of MH/HH: 4

Created By VINAY DIXIT Approved By Sumit.Wadhwa Contractor Name SUSHIL KUMAR GUPTA & CO
Signature Signature Signature
Date 08-01-2024 16:31:31 Date 9-1-2024 12:56 Date

Page 1 of 1
SummarySheet-DIT-60198.pdf LM_Patiala - Ismailabad

SUMMARY SHEET FOR DIT


Summary Sheet No.: SummarySheet-DIT-60198.pdf
Contractor : SUSHIL KUMAR GUPTA & CO
Contractor Code: 0000392237
W.O. No.: 0013043531
Link Name: Bahadurpur Fakiran-Ismailabad
Link ID: PBPTILHRIMBDCLD005_BU
Span Name: LM_Patiala - Ismailabad (317) - 01-HR_1_23500
Span ID: LM_PBPTILHRIMBDSPR001_BU_23500
ITP Start Date: 25-09-2023
ITP End Date: 25-09-2023

Sr.No. ITP Sheet No. ITP Sheet Date From To MH/HH No. Actual Length No of Remarks
Lat Long Lat Long From To (Mtrs.) Ducts
1 ITP42_227888_81552_1 30.10.2023 30.13608 76.66630 30.13600 76.66601 ITP33_227888_81552_1_1 ITP33_227888_81552_2_ 52.000 10
(0 - 292) _1 1_1
2 ITP42_227888_81552_1 30.10.2023 30.13600 76.66601 30.13521 76.66683 ITP33_227888_81552_2_1 ITP33_227888_81552_2_ 135.000 10
(0 - 292) _1 2_1
3 ITP42_227888_81552_1 30.10.2023 30.13608 76.66595 30.13608 76.66630 ITP33_227888_81552_3_1 ITP33_227888_81552_3_ 34.000 10
(0 - 292) _1 1_2
4 ITP42_227888_81552_1 30.10.2023 30.13608 76.66630 30.13661 76.66552 ITP33_227888_81552_3_1 ITP33_227888_81552_3_ 71.000 10
(0 - 292) _2 2_1
Total DIT Distance (Mtrs.) 292

Ducts Length (Mtrs.)


DUCT,HDPE,BLUE,LUB,40 OD X 3.5MM 292
THK

Created By VINAY DIXIT Approved By Sumit.Wadhwa Contractor Name SUSHIL KUMAR GUPTA & CO
Signature Signature Signature
Date 08-01-2024 16:29:58 Date 9-1-2024 13:03 Date

Page 1 of 1
SummarySheet-Blowing-61040.pdf LM_Patiala - Ismail

SUMMARY SHEET FOR Blowing


Summary Sheet No.: SummarySheet-Blowing-61040.pdf
Contractor : SUSHIL KUMAR GUPTA & CO
Contractor Code: 0000392237
W.O. No.: 0013043531
Link Name: Bahadurpur Fakiran-Ismailabad
Link ID: PBPTILHRIMBDCLD005_BU
Span Name: LM_Patiala - Ismailabad (317) - 01-HR_1_23500
Span ID: LM_PBPTILHRIMBDSPR001_BU_23500
ITP Start Date: 25-09-2023
ITP End Date: 25-09-2023

Material Code Material Description Length in Mtr


2001130229 DUCT,HDPE,BLUE,LUB,40 OD X 3.5MM 292.000
THK
2001632253 OFC ARM OFC HDPE 24F SM FRP 292.000

Sr.No. ITP Sheet No. ITP Sheet Date From To MH/HH No. Fibre Duct Loop Remarks
Lat Long Lat Long From To Type (No Length Length
of Fibres) (Mtrs.) (Mtrs.)
1 ITP11_227888_81552_ 30.10.2023 30.1360 76.6663 30.1352 76.6668 ITP33_227888_81552_ ITP33_227888_81552_ 24 187.000 89 20mtr odc loop
1 (0 - 292) 8 0 1 3 1_1_1 2_2_1
2 ITP11_227888_81552_ 30.10.2023 30.1360 76.6659 30.1366 76.6655 ITP33_227888_81552_ ITP33_227888_81552_ 24 105.000 106 20mtr odc loop
1 (0 - 292) 8 5 1 2 3_1_1 3_2_1
Total Distance (Mtrs.) 292 195

Fiber Type Duct Length Loop Length RJIL Blowing Machine Non RJIL Blowing RJIL Air Compressor Non RJIL Air Compressor
(Mtrs.) (Mtrs.) (Mtrs.) Machine (Mtrs.) Machine (Mtrs.) Machine (Mtrs.)
24 292 195 0 292 0 292

Created By VINAY DIXIT Approved By Sumit.Wadhwa Contractor Name SUSHIL KUMAR GUPTA & CO
Signature Signature Signature
Date 08-01-2024 16:30:41 Date 9-1-2024 13:01 Date

Page 1 of 1
SummarySheet-Splicing-57664.pdf LM_Patiala - Ismail

SUMMARY SHEET FOR Splicing


Summary Sheet No.: SummarySheet-Splicing-57664.pdf
Contractor : SUSHIL KUMAR GUPTA & CO
Contractor Code: 0000392237
W.O. No.: 0013043531
Link Name: Bahadurpur Fakiran-Ismailabad
Link ID: PBPTILHRIMBDCLD005_BU
Span Name: LM_Patiala - Ismailabad (317) - 01-HR_1_23500
Span ID: LM_PBPTILHRIMBDSPR001_BU_23500
ITP Start Date: 25-09-2023
ITP End Date: 25-09-2023

Material Code Material Description Count


2001548397 CLOSURE,JOINT,OFC,48F(6LT X 8F) 3

Sr.No. ITP Sheet No. ITP Sheet MH Chainage MH Reference No Lat Long Cable Tag No. No. of Fibres Remarks
Date No From To In Cable Splicing Done
1 ITP09_227888_81552_ 30.10.2023 187 ITP33_227888_81552_ 30.13521 76.66683 0 0 0 1 clouser
1 (20 - 187) 2_2_1
2 ITP09_227888_81552_ 30.10.2023 105 ITP33_227888_81552_ 30.13661 76.66552 0 0 0 1 clouser
2 (0 - 105) 3_2_1
3 ITP09_227888_81552_ 30.10.2023 0 ITP33_227888_81552_ 30.13608 76.66630 0 0 48 1 termination
3 (0 - 20) 1_1_1
Total: 48 3

Created By VINAY DIXIT Approved By Sumit.Wadhwa Contractor Name SUSHIL KUMAR GUPTA & CO
Signature Signature Signature
Date 08-01-2024 16:32:42 Date 9-1-2024 13:07 Date