Professional Documents
Culture Documents
Bunker Plan
Bunker Plan
Grade :
Quantity (Cubic’s) :
(MT)
Stowage :
SG or density :
Operation
Fender Condition :
Depend on
Alongside : Port Starboard
Current/Tide
Portable
Ship's
Means of Access : Barge/Termin Gangway /
Gangway
al Gangway Pilot Ladder
Maximum Pumping Rate and/or
Manifold pressure during : Cubic per hour, kg/cm2
Bunkering
by
Final stop : by ship both
barge/shore
Watch Arrangement:
Manifold
To:
Deck
Topping off
1) Topping Sequence
2) Topping Ullage or Sounding (to be provided by Chief Engineer, and re-checked by duty engineer)
BUNKER PLAN
Vol of Vol of
Ullage
tank tank Vol to
Bunker in tank Availab Final Final Final
prior prior be
tank Grade Prior le vol. Vol. Vol Ullage
bunkeri bunkeri loaded
no. bunkeri (M3) (M3) (%) (M)
ng ng (M3)
ng (M)
(M) (%)
Emergency procedure (against incident such as bunker spill, fire, and so on.)
Other information
Total expected duration of Bunkering Operation: