Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

BUNKER PLAN

Vessel: Port: Berth: Voy.No:

Bunker Information Date:

Grade :
Quantity (Cubic’s) :
(MT)
Stowage :
SG or density :

Operation

Fender Condition :

Depend on
Alongside : Port Starboard
Current/Tide
Portable
Ship's
Means of Access : Barge/Termin Gangway /
Gangway
al Gangway Pilot Ladder
Maximum Pumping Rate and/or
Manifold pressure during : Cubic per hour, kg/cm2
Bunkering
by
Final stop : by ship both
barge/shore

Watch Arrangement:

Duties of Personnel in addition/different to


Time Location Title and name
Bunker
ECR/Bunker
From: Control Station

Manifold
To:

Deck

Topping off
1) Topping Sequence
2) Topping Ullage or Sounding (to be provided by Chief Engineer, and re-checked by duty engineer)
BUNKER PLAN

Vol of Vol of
Ullage
tank tank Vol to
Bunker in tank Availab Final Final Final
prior prior be
tank Grade Prior le vol. Vol. Vol Ullage
bunkeri bunkeri loaded
no. bunkeri (M3) (M3) (%) (M)
ng ng (M3)
ng (M)
(M) (%)

Bunker Sampling Procedures:

Additional precautions/procedures during Bunkering operations:

Topping off procedures/instructions:

Emergency procedure (against incident such as bunker spill, fire, and so on.)

Other information
Total expected duration of Bunkering Operation:

Date prepared by Chief Engineer:

Date Bunkering Operation Team briefed:

Chief Engineer’s Name Signature


Master’s Name Signature
Duty Engineer’s Name Signature
Engine Rating Name Signature
Deck Rating Name Signature

You might also like