PROJECT LOCATION: MOTHERCARE , AL MEERA – JERYAN JOB CARD NO: AFSQ 266
DELUGE AND
Piping supervised YES NO Detecting Media Supervised YES NO
PRE ACTION
Does valve operate from the manual trip remote or both control stations YES NO
VALVES
Is there any accessible facility in each circuit for testing If no please explain
YES NO
MAKE MODEL Does each circuit operate Does each circuit operate Maximum time to operate release
supervision loss alarm? valve release
PRESSURE Location and Make and Setting Static Pressure Residual Pressure Flow Rate
REDUCING floor model
VALVE TEST
Inlet psi Outlet psi Inlet psi Outlet psi Flow gpm
Backflow device Indicate means used for forward flow test of backward flow
forward flow test
When means to test device was opened was system flow demand created YES NO
Hydrostatic: Hydrostatic test shall be made at not less than 200 psi ( 13.6 bars ) fro 2 hours or 50 psi ( 3.4 bar ) above static
pressure in excess of 150 psi ( 10.2 bar) for 2 hours. Differential dry pipe valve clappers shall be left open during the test to
prevent damage. All aboveground piping leakage shall be stopped.
Test
Description Pneumatic: Establish 40 psi ( 2.7 bar) air pressure and measure drop, which shall not exceed 1 ½ psi (0.1 bar) in 24 hours. Test
pressure tanks at normal water level and air pressure and measure air pressure drop which shall not exceed 1 ½ psi in 24 hrs.
All piping hydrostatically tested at… 175 psi 12 .bar for 12 Hours
Do you certify as the sprinkler contractor that additives and corrosive chemicals, sodium silicate or derivatives of sodium silicate,
brine or other corrosive chemicals were not used for testing systems or stopping leaks
`Drain Test Reading of gauge located near water supply Residual pressure with valve in test connection open wide
test connection ……………..psi ( …………bar ) ………..psi (………bar )
Verified by copy of the Contractors Material and Test YES NO OTHER EXPLAIN
If powder driven fasteners are used in concrete has representative sample If No explain
Date left in service with all control valves : CONTROL VALVES STILL CLOSED
REMARKS
NAME OF SPRINKLER CONTRACTOR : ALPHA FIRE SERVICES WLL
Name …………………………………………………………………………………………………………………
Signature ……………………………………………………………………………………………………………
Date …………………………………………………………………………………………………………………….