AS FOUND AS LEFT
Description Std. Flow Measured Instrument Instrument Error Std. Flow Measured Instrument Instrument Error Due
Date of work performed. Notes CuFt/Sec Height Flow Height CuFt/Sec CuFt/Sec Height Flow Height CuFt/Sec Date
7/28/2022 Calibration TTL=895326 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Unit in excellent shape -No adjustment
0.494 6.250 0.450 6.300 -0.044 0.494 6.250 0.450 6.100 -0.044
necessary Jul-2023
The equation recommended by the Bureau of Reclamation in their Water Measurement Manual,for use with a fully contracted, 90 o, v notch, sharp crested weir with free flow conditions and 0.2 ft < H < 1.25 ft, is:
Q = 2.49 x h2.48
AS FOUND AS LEFT
Description Std. Flow Measured Instrument Instrument Error Std. Flow Measured Instrument InstrumenError Due
Date of work performed. Notes CuFt/Sec Height Flow Height CuFt/Sec CuFt/Sec Height Flow Height CuFt/Sec Date
7/28/2022 Calibration TTL=55267882 No flow at time of calibration. 0.000 0.000 0.007 0.150 0.007 0.000 0.000 0.001 0.050 0.001
2.350 6.000 2.390 6.130 0.040 2.350 6.000 2.353 6.030 0.003
Jul-2023
Small -.1 adjustment necessary / Paper was out at calibration
The equation recommended by the Bureau of Reclamation in their Water Measurement Manual,for use with a fully suppressed rectangular weir with free flow conditions is:
Q = 3.33 x L x h3/2
NOTES:
Calibration performed by confirming levels with indicated levels using standard measurement equipment.
Levels also simulated using steel plates with known distance to reference bottom.