Form No. : Masonry Block Works 0 Rev. No. : SUBCONTRACTOR CONTRACTOR 1 of 1 Page :
Section of Work: CIVIL – SITE WORKS Location:
Level: Checked by Checked by STAGE ITEM DATE S/C CONT. CONSULTANT Document - Check shop drawings are approved & at Verification correct revision obtained. Material approval - Check material approval obtained (Block, accessories, embedment’s, conduits, DPC etc.) - ITL Test Report submitted to the Consultant. Mortar mix - Check mortar mix for block work as per specification and mixed in mechanical mixer. Incoming material - Cary out inspection of incoming material to Inspection conform to the approved submittal. - MIR for incoming material.
Storage and - Visually verify the storage and protection of
Protection blocks to be adequate Preliminary - Check access permission ,equipment and activities scaffolding permission In process 1. Visually check damp proof course provided Inspection below the first layer in Ground floor area. 2.Setting out and first layer of block works done as per approved shop drawing & submit WIR for inspection 3. Visual check for bond, thickness of mortar and block 4. Visually check all sleeves, Embedment openings, provision of block work accessories. 5. Check the plumb, level, number of layer in each day work (within acceptable tolerance) 6. Check opening sizes for doors / windows & services. 7. Curing of block works – 3 days and 7 days for lintels and sills. Final Inspection - Check workmanship and quality of the block works.
For S/C: Date: For CONTRACTOR QA/QC: Date For CONSULTANT Rep. Date: