1 PROJECT MANAGER
2 CONSTRUCTION MANAGER
CM-PM-PMP-S# 001
August 3 Sessions
September 4 Sessions
October 4 Sessions
November 3 Sessions
December 4 Sessions
TOTAL 18 SESSIONS
@Copyright by: Professional Engineering (PMP) Prepared by: Prof. Voek Pitou
1 Project Organization Chart
Deputy PM
Assistance PM
Section Manager
1 2 3 5 6 7
4
Technical Manager Construction Manager QA/QC Manager QS Manager HSE Manager Procured Manager HR Manager
Site Site Site Head Office Site/Head Office Head Office Head Office
Surveyors Structural engineers QA/QC engineers Site QS engineers HSE officers/engineers Site purchasers Site administrator
Architectures Finishing engineers Contract engineers Site stoke controller Site securities
Technical engineers Forman
Structural designer
@Copyright by: Professional Engineering (PMP) Prepared by: Prof. Voek Pitou
2 Necessary Skills for Managers
មុននឹងអាចប្រែក្លាយខ្ាន
ួ ទៅជា រែធានក្លរដ្ឋាន ឬ រែធានររែ់ររងរទរោងបាន
ក្លរប្វែងយល់ទអាយបានចាវ់អំពីជំនាញ និងមុខ្ វិជាាវំខាន់ៗ ប្ែលររូវទរៀន
វូររែប្នែម រឺជាចំនុចែ៏ចំបាច់ែំផុរ។
Construction Technology
Pre-stressed concrete
Budget Plan/Tracking
Labor Plan/Tracking
Strength of material
N
Structural analysis
Procurement Plan
Problem solving
Task delegation
Communication
Steel structure
TI
Responsibility
MEP Drawing
ARC Drawing
Cost analysis
STR Drawing
Risk analysis
Presentation
Team work
Leadership
SI
Negotation
Motivation
Honestly
Contract
PO
Patient
1 2 3 1 2 3 4 5 6 7 8 9 10 11 12 13 13 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 11
HARD-SKILL SOFT-SKILL
Project Manager 100% 100% 70% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Construction Manager 100% 100% 70% 50% 70% 100% 100% 100% 100% 100% 100% 60% 60% 100% 70% 60% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 100% 100% 70% 100% 100% 100% 100% 100% 60% 80% 100%
Technical Manager 100% 100% 100% 80% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 80% 100% 80% 100% 70% 70% 100% 100% 100% 80% 100%
QS Manager 100% 100% 100% 100% 100% 80% 80% 100% 100% 70% 70% 80% 100% 70% 100% 70% 70% 100% 80% 60% 80% 100%
QA/QC Manager 100% 100% 100% 100% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 100% 100% 100% 100% 50% 70% 100% 100% 70% 100%
HSE Manager 100% 90% 60% 100% 70% 70% 100% 70% 100%
Procurement Manager 80% 50% 100% 100% 80% 80% 70% 80% 100% 90% 70% 100% 100% 50% 100%
@Copyright by: Professional Engineering (PMP) Prepared by: Prof. Voek Pitou
3 Project Stages with In-Charged Managers
1 2 3 4
BIDDING/PLANNING EXECUTIVE MONITORING CLOSE-OUT
Project Manager 30% Project Manager 100% Project Manager 100% Project Manager 100%
QS Manager 100% Construction Manager 100% Construction Manager 100% Construction Manager 100%
QA/QC Manager 30% HSE Manager 50% HSE Manager 100% HSE Manager 60%
HSE Manager 30% Technical Manager 50% Technical Manager 100% Technical Manager 50%
Technical Manager 40% Procurement Manager 50% Procurement Manager 100% QA/QC Manager 100%
QS Manager 50%
2-Weeks Master-Schedule
1 3
BIDDING/PLANNING EXECUTIVE MONITORING CLOSE-OUT
2 4
1 month Master-Schedule
@Copyright by: Professional Engineering (PMP) Prepared by: Prof. Voek Pitou
4 Bidding Stage and Manager JD
គ្បធាៃខ្ននកៃីម្យ
ួ ៗខ្ដលពាក់ព័ៃធកង
នុ ដំណាក់កាលដ៏សំខាៃ់ម្ួយគៃេះ ក៏គ្តូវោៃការកំណត់ពីតួ
នាទី ៃិងភារកិច្ចគោយបាៃច្ាស់លាស់កង នុ ការគរៀបច្ំការងារសំខាៃ់ៗគៅកនង
ុ ដំណាក់កាល
គៃេះ។
2 Site visit
2 Inspection Flow
@Copyright by: Professional Engineering (PMP) Prepared by: Prof. Voek Pitou
BIDDING STAGE AND MANAGER JD
2 HSE regulation
@Copyright by: Professional Engineering (PMP) Prepared by: Prof. Voek Pitou
5 Executive Stage and Manager JD
6 Plan assigments
5 HSE MANAGER 1 Prepare for safety protection both internal & exteranl site
DEPUTY PROJECT MANAGER 4 Expenses tracking (Material & Labor) CONSTRUCTION MANAGER
@Copyright by: Professional Engineering (PMP) Prepared by: Prof. Voek Pitou
MONITORING STAGE AND MANAGER JD
3 TECHNICAL MANAGER 1 Prepare shop drawing & method statement for submission to consultant
SURVEYORS 4 Doing indcution course for necessary techniques and method during construction
SITE ARCHITECTURES 7 Check revised drawing gotten from consultant to control VO work
TECHICAL ENGINEERS
6 Prepare for defect report and follow up with site team for rectifying work
@Copyright by: Professional Engineering (PMP) Prepared by: Prof. Voek Pitou
MONITORING STAGE AND MANAGER JD
7 Lead & conduction necessary testing work and submit report to client
5 HSE MANAGER 1 Follow up & control safety work on site daily under construction
HSE ENGINEERS 4 Prepare and submit weekly safety report to project manager
3 Prepare Variation Order BoQ (if any) and submit to client to approve
7 PROCURE. MANAGER 1 Tracking and follow up with material purchase order with suppliers
3 Control PR, PO, and DO with construction team, stoke controller & suppliers
STOKE CONTROLLER
@Copyright by: Professional Engineering (PMP) Prepared by: Prof. Voek Pitou