Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

gitu

Tub d=

6
e ria 4 652

eria
"=1
m

m.
10.1
.

Tub
6m
.

5.40
34

40 Tub
e

"=9
ria 4
17.31
"=1
00.9

m.
8m

6
PM
17.58
.

5.40

eria
17.35
35
17.28

41

Tub
9
8" =
16.96
LOT
Long E - T1u 36

eria
itud b3
eria

T ub
= 66
16.72

8" = 49
91.8
9m 0m
.
PM
.
17.34 32 37
17.36

Tub Tub
39 eria 48
MURO CONTENCION. CANAL EXISTENTE
8" =
REA COTA SUPERIOR 17.68
17.07

AREA: 3.3 Has.


91.8
0m
A RE COTA INFERIOR 15.32 . 31

2 ha D I SEÑ
17.04 KZ BOMBEO
RES
ERV 38
Tub
eria
8" =
s+ O RIO Long LmO 100
8,82 AR 17.32

itud . TE -.98
0 RES 14
17.1
30

= 56
m.

14
ERV
Tub O 3 m Tub. 1
9.50

. 8" = 114 RIO 37

.
17.28
36
58.2
RES 0" =
"=8

0m 17.97
35
. ERV 11 0.16
ORI m.
29
Tub
O
e 12

17.09

CAN
Tub . 10"
eria 34 =7
6" =
3,87
ria d

A
1 56.0

L TR
8m
17.10

17.50
0 m.
2
17.88
e

113
PM
Tub

ES P
17.10

EOS
1
3 Tub
2 e ria 4 17.97
17.88

0.0
"=1
17 37.7 17.88

0m
17.97
7
Tub . 112 18.38

eria
0.0
4" =
110
.16 4
m. 6 15.66
18.04 17.86 18.29
18.21
17.46
18 5 26

Tub
L
m.

46.9 O
eria Tub 4" =
6" = eria
Lon0gm.
.40

29
17.45
100 de 1
.98 2" =
m.
it
101

17.65

19
L O .35
T
Tub
Long a 4" = 1 E -
r
8

i em.
526 15.68

18.07
18.02
2" =

17.58 18.27

itud 00.98 m.16


18.39
18.36

16
de 1

17.71 Tub
e = 70 9
18.04
15.81

3m
12
PM ria 4 20 17.96

"=1
18.18 18.29
18.31
eria

18.20

00.9
8 m 15 .
Tub

17.58
. 11
6"=
27.5 17.79
15.57

4m 17.93
17.44
. 10
Tub
18.59
18.60

21 Tub
. 6" . 4"
.

= 73 = 64
.53m

14 21
.44 .26
17.25 m. Tub m . 22
eria
L
= 75

Long 10O
13
17.65
4" =
0.9T
18.43
17.59
COTA
6"=
E
18.96
17.77 18.94
18.84 18.97
18.98
18.96
18.98 COTA
36.7
- 17
17.64
18.66
18.85 17.55
6
8m
itud
18.51
18.85

0 m.
. 2
. 10"

17.57

Tub
eria
4" = = 70

95.4
9
Tub

1.80
m 4

You might also like