SUMMARY
ITEM DESCRIPTION TOTAL AMOUNT
A.SUB STRUCTURE
1 Excavation and earth work 21,529.65
2 Concrete work 60,760.25
3 Masonry work 18,883.25
Sub Total (A) 101,173.15
B. SUPER STRUCTURE
1 Concrete work 125,149.44
2 Block work 80,320.09
3 Carpentry and Joinery work 59,351.68
4 Roofing work 30,511.53
5 Floor and wall Finishing work 9,683.04
6 Painting work 71,455.96
7 Electrical Instalation -
Sub Total (B) 376,471.73
Total (A + B) 477,644.88
GRAND TOTAL 477,644.88
BILL OF QUANTITY AND SPESFICATION
CLIENT: ATO AMANUAL HADUSH TEFERI
PROJECT: GURD HOUSE
LOCATION : SHERARO
1.4 Back fill under hard core, around foundation wall and m3 5.05 1,211.04
footing column with selected materials & well
compacted at every 20 cm. select material from site. 240
Back fill under harde, around foundation wall and
1.5 footing column with selected materials & well m3 14.00 6,713.00
compacted at every 20 cm. select material from out
side the site. 479.5
Cart away surplus excavated material and deposite at 454.39
1.6 distance not exceeding 2km from site. m3 14.21 6,456.88
25 cm thick basaltic or equivalent stone hard core well 292.6
1.7 rolled consolidated and blinded with crushed stone. m3
16.82 4,921.53
5.1
a)Diametr 10-12 cm eucalyptus upper & lower,
members of truss. ml 36.00 107.99 3,887.64
b)Diametr 8-10cm eucalyptus vertical &
diagonal truss member ml 18.00 96.59 1,738.62
5.2 Diametr 8-10cm eucalyptus purlins. ml 42.00 96.59 4,056.78
Total carried to Summary 9,683.04
44.79 2 2.90
44.79 Kg. TOTAL 0.25
0.25
B) Ø 10 mm Deformed bar 0.36 M³
0.00 B) In Top tie beams @ +8
0.00 Kg. TOTAL
AXIS: 1,7
C) Ø 12 mm Deformed bar 0 25.40
85.25 0.40
85.25 Kg. TOTAL 0.40
- M³
D) Ø 14 mm Deformed bar AXIS: A,K
0 60.80
0.00 0.40
0.00 Kg. TOTAL 0.40
- M³
E) Ø 16 mm Deformed bar 0.73 M3 TOTAL
0.00 1.2, Form work
0.00 Kg. TOTAL 4 0.25 A) In elevation columns.
4 3.3
13.20 M
2
F) Ø 20 mm Deformed bar
0.00
0.00 Kg. TOTAL 13.20 M2 TOTAL
g) Ø 24 mm Deformed bar B) Intermidate beams @+ 3.6 & +4.8
0.00
0.00 Kg. TOTAL 2 2.90
3. Masonary 0.75
4.35 M
2
below NGL
4 2.90 2 2.90
0.5 0.75
4.35 M
2
1
5.80 M3 TOTAL B) In Top tie beams @ +8
Above NGL 0 25.40
4 2.90 1.20
0.5 - M2
0.6 3.48 M3 TOTAL 0 60.40
1.20
- M
2
8.70 M2 TOTAL
NO L/W/D QTY DESCRIPITION NO L/W/D QTY DESCRIPITION
1.3, Reinforcement bars.
A) Ø 8 mm Deformed bar
104.57
104.57 Kg. TOTAL
B) Ø 10 mm Deformed bar
0.00
- Kg. TOTAL
C) Ø 12 mm Deformed bar
153.45
153.45 Kg. TOTAL
D) Ø 14 mm Deformed bar
0.00
- Kg. TOTAL
E) Ø 16 mm Deformed bar
0.00
- Kg. TOTAL
F) Ø 20 mm Deformed bar
0.00
- Kg. TOTAL
F) Ø 20 mm Deformed bar
0.00
- Kg. TOTAL
2. BLOCK WORK
2.1, 20*20*40cm thick concrete block
2 2.9
4.7 27.26 M2
2 2.9
4.3 24.94 M2
-1 1 deduction of window
1.5 -1.50 M2
deduction of doors
-1 1
2.75 -2.75 M2
47.95 M2 TOTAL
4. METAL WORK
1 1 4.1 metal Doors
2.75
2.75 M2
2.75 M2 TOTAL
4.2 metal windows
1 1
1.5
1.50 M2
1.50 M2 TOTAL
5. STEEL WORK
4
0 No
5.3 RHS
a. 60*60*3 Diagonal 10.89 M2 TOTAL
25 21.50
5.20 2795
2795.0 kg 6.2 G-28 sheet metal gutter.
b. RHS 60*60*3 Vertical 1 3.00
25 7.00 3.00 ml
5.20 910
0 25.40
910.0 kg - ml
REINFORCEMENT SCHEDULE
FOUNDATION Reinforcement)
TOTAL LENGTH (M) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0
REINFORCEMENT SCHEDULE
(FOUNDATION COLUMN Reinforcement)
1.30 65 40
TOTAL LENGTH (M) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
REINFORCEMENT SCHEDULE
(GRADE BEAM Reinforcement)
TOTAL LENGTH (M) 113.40 0.00 96.00 0.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 44.79 0.00 85.25 0.00 0.00 0.00 0.00
REINFORCEMENT SCHEDULE
(Mesh Reinforcement)
TOTAL LENGTH (M) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SUMMARY FOR SUPER STRUCTURE
REINFORCEMENT SCHEDULE
(Elevation Columns Reinforcement)
TOTAL LENGTH (M) 97.33 0.00 52.80 0.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 38.45 0.00 46.89 0.00 0.00 0.00 0.00
REINFORCEMENT SCHEDULE
(BEAM Reinforcement)