Professional Documents
Culture Documents
BLOCK A 12
BLOCK A 12
1.4 Back fill under hard core, around foundation wall and m3 160.00 38,400.00
footing column with selected materials & well
compacted at every 20 cm. select material from site. 240.00
Back fill under harde, around foundation wall and
1.5 footing column with selected materials & well m3 124.00 59,458.00
compacted at every 20 cm. select material from out
side the site. 479.50
Cart away surplus excavated material and deposite at
1.6 distance not exceeding 2km from site. m3 325.00 147,676.75
454.39
25 cm thick basaltic or equivalent stone hard core well
1.7 rolled consolidated and blinded with crushed stone. m3 400.00 117,040.00
292.60
Total carried to Summary 410,574.75
2. CONCRETE WORK
5cm thick lean concrete in class C-5 (150kg cement
2.1 /m3) under foundation stone masonary wall & footing
pad mix concrete(cement,sand,gravel)
A) Under Grade beam m2 33.00 166.79 5,504.07
concrete in C-25 ( 360kg cement/m3 ) mix concrete
(cement,sand,gravel)filled in to form work and vibrated
2.2 around reinforcement bar. (form work and
reinforcement bar measured separately).
A) In grade beam m3 9.90 7,456.19 73,816.28
B) In 10cm thick concrete ground floor slab m2 400.00 118.43 47,372.00
supply and fix shs (squar hollow section steel tube for
lower ,upper, digonal ,vertical,horizontal
3.30 truss,purlin ,fance gril,post and other works price
including 2 coat of anti rust paint with all accessories,
(material quality approved by the engineer).
5.1 -
a)Diametr 10-12 cm eucalyptus upper & lower,
members of truss. ml 240.00 107.99 25,917.60
b)Diametr 8-10cm eucalyptus vertical &
diagonal truss member ml 360.00 96.59 34,772.40
5.2 Diametr 8-10cm eucalyptus purlins. ml 400.00 96.59 38,636.00
Total carried to Summary 99,326.00
6, FLOOR AND WALL FINISHING WORK
Apply 3 coats of plastering in cement sand
mortar (1:3) up to fine finish to all indicated
6.1 internal Hollow concrete block/HCB/wall, m2 327.50 -
column, beam
6.2 15 cm thick basaltic or equivalent stone hard core
well rolled consolidated and blinded with crushed
stone. m2 120.00 255.00 30,600.00
6.30 10cm thick marshavedi concrete in C-20 ( 320 kg
cement/m3 ) mix concrete (cement,sand,gravel)
m2 120.00 220.000 26,400.00
Supply and lay concrete pipes for ,sewere, water-storm
& water supply waters according to the drawing
shown with a slope as indicated on the drawing . The
joints shall be made tight in cement sand mortar 1:2 &
installation shall make possible the best condition for
cleaning and maintenance. unit price shall include
excavation of the treanch supply and spread of
granular material & back fillings.with all the
accessories ( material quality approved by engineer)
713.37 6 10.00
713.37 Kg. TOTAL 0.25
0.25
B) Ø 10 mm Deformed bar 3.75 M³
0.00 B) In Top tie beams @ +8
0.00 Kg. TOTAL
AXIS: 1,7
C) Ø 12 mm Deformed bar 0 25.40
1,220.45 0.40
1220.45 Kg. TOTAL 0.40
- M³
D) Ø 14 mm Deformed bar AXIS: A,K
0 60.80
0.00 0.40
0.00 Kg. TOTAL 0.40
- M³
E) Ø 16 mm Deformed bar 13.75 M3 TOTAL
0.00 1.2, Form work
0.00 Kg. TOTAL 22 0.25 A) In elevation columns.
4 3.5
77.00 M
2
F) Ø 20 mm Deformed bar
0.00
0.00 Kg. TOTAL 77.00 M2 TOTAL
g) Ø 24 mm Deformed bar B) Intermidate beams @+ 3.6 & +4.8
0.00
0.00 Kg. TOTAL 4 40.00
3. Masonary 0.50
80.00 M
2
below NGL
2 50.00 4 10.00
0.5 0.50
20.00 M
2
1
50.00 M3 TOTAL B) In Top tie beams @ +8
Above NGL 0 25.40
2 50.00 1.20
0.5 - M2
0.6 30.00 M3 TOTAL 0 60.40
1.20
- M
2
100.00 M2 TOTAL
NO L/W/D QTY DESCRIPITION NO L/W/D QTY DESCRIPITION
1.3, Reinforcement bars.
A) Ø 8 mm Deformed bar
2,323.00
2,323.00 Kg. TOTAL
B) Ø 10 mm Deformed bar
0.00
- Kg. TOTAL
C) Ø 12 mm Deformed bar
2,031.39
2,031.39 Kg. TOTAL
D) Ø 14 mm Deformed bar
797.28
797.28 Kg. TOTAL
E) Ø 16 mm Deformed bar
0.00
- Kg. TOTAL
F) Ø 20 mm Deformed bar
0.00
- Kg. TOTAL
F) Ø 20 mm Deformed bar
0.00
- Kg. TOTAL
2. BLOCK WORK
2.1, 20*20*40cm thick concrete block
2 40
2.75 220.00 M2
3 10
4.5 135.00 M2
327.50 M2 TOTAL
4. METAL WORK
5 2 4.1 metal Doors
2.75
27.5 M2
27.5 M2 TOTAL
4.2 metal windows
2 40
0.5
40.00 M2
40.00 M2 TOTAL
5. STEEL WORK
B. J BOLT Ø 20 L 800mm
4
0 No
5.3 RHS
a. 60*60*3 Diagonal 446.60 M2 TOTAL
25 21.50
5.20 2795
2795.0 kg 6.2 G-28 sheet metal gutter.
b. RHS 60*60*3 Vertical 2 40.00
25 7.00 80.00 ml
5.20 910
0 25.40
910.0 kg - ml
REINFORCEMENT SCHEDULE
FOUNDATION Reinforcement)
TOTAL LENGTH (M) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0
REINFORCEMENT SCHEDULE
(FOUNDATION COLUMN Reinforcement)
1.30 65 40
TOTAL LENGTH (M) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
REINFORCEMENT SCHEDULE
(GRADE BEAM Reinforcement)
TOTAL LENGTH (M) 1806.00 0.00 1374.38 0.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 713.37 0.00 1,220.45 0.00 0.00 0.00 0.00
REINFORCEMENT SCHEDULE
(Mesh Reinforcement)
TOTAL LENGTH (M) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SUMMARY FOR SUPER STRUCTURE
REINFORCEMENT SCHEDULE
(Elevation Columns Reinforcement)
TOTAL LENGTH (M) 913.00 0.00 0.00 660.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 360.64 0.00 0.00 798.60 0.00 0.00 0.00
REINFORCEMENT SCHEDULE
(BEAM Reinforcement)
TOTAL LENGTH (M) 4968.00 0.00 2287.60 0.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 1,962.36 0.00 2,031.39 0.00 0.00 0.00 0.00
30.20833
32