Professional Documents
Culture Documents
Extol Profile.
Extol Profile.
COMPANY PROFILE
1/23
EXTOL
1. INCORPORATION
2. OBJECTIVE
PROFILE
2/23
EXTOL
At Karur Village , Tada, near Chennai, Tada, Nellore district, Andhra Pradesh.
At Hyderabad, Sy.No.487/Part, IDA, Bollaram Road, Bachupally, Hyderabad – 500 072 Telangana.
At Hyderabad, Plot No.:141/1,Phase II, IDA, Cherlapally,Hyderabad -500 051, Telangana
At Visakhapatnam, Plot No.44 & 45, “F” Block, Autonagar, Visakhapatnam – 530 012, Andhra Pradesh
We also have a Techno – Commercial tie up with Engineering Industries at
Chennai and Hyderabad for manufacture and supply.
3. QUALITY
- Qualified and Experienced Quality Assurance/ Quality Control team to assist the
company in maintaining Quality Systems of International repute.
QUALITY POLICY :
4. SAFETY
SAFETY POLICY :
To meet national standards and to meet safety of men and equipment both at
manufacturing shop and site facilities.
To ensure environment integrity both at shop and site.
5. FACILITIES
a) ENGINEERING OFFICE :
Hardware:
Computers including CAD workstations,
Plotters, Laser Printers etc.
Software :
Auto CAD 2010
MS Project Scheduling Software
Stad Pro
3/23
EXTOL
b) RESOURCES :
Personnel -
Qualified and experienced group of Engineers of various disciplines to cater
c) Quality :
d) Delivery control :
e) Workshop :
Necessary machinery, tools and tackles are available take up fabrication of
Heavy Structural's, Piping spools, Vessels, Tanks, and Heat Exchangers etc.
4/23
EXTOL
10 Idler Rollers 4
11 Portable ovens 10
12 Air compressor 1
Power Availability
1 100 KVA Capacity Transformer
2 63 KVA Diesel generator set (backup facility)
Testing Facilities
1 Hydraulic Test Pumps
2 Non destructive Testing facilities i.e., Radiography film viewer etc.,
3 Measuring Instruments
4 Elcometer to check Paint Thickness
5/23
EXTOL
BOARD
MANAGING DIRECTOR
ENGINEERING
Process Equipment Structural Fabrication
SERVICES Projects Division
Division Division
Head Head
Head Head
Technological
Mechaniical
PRESSURE Pressure Structures for
Equipment
VESSELS Veessels Steel, Power ,
Erection
Oil &Gas Plants
Structural
HEAT
Tanks fabrication &
EXCHANGERS
Erection
MANUFACTURIG
PIPING Heat &
Exchangers
SUB CONTRACTIG
TECHNOLOGICAL CIVIIL
C.S & S.S Pipng
STRUCTURES CONSTRUCTION
HYDRO MECH.
EQUIPMENT
6/23
EXTOL
6. KEY PERSONNEL
Areas of specialisation :
Project Management
Construction Services
Manufacturing
Heat Exchangers & pressure vessels
Cryogenic Equipment
Experience : 40years
Organization & Posts Held :
Areas of specialisation:
7/23
EXTOL
Experience : 20 years
Areas of specialisation :
8/23
EXTOL
45
42
9/23
EXTOL
HANDLING OF EQUIPMENT
44
43
ERECTION OF COLD BOX COLUMN FOR ASU ERECTION OF 2X300KL LIN TANK
10/23
EXTOL
26
11/23
EXTOL
12/23
EXTOL
13/23
EXTOL
Experience : 30 years
Areas of specialisation:
Project Works
14/23
EXTOL
15/23
EXTOL
Experience : 35 years
Areas of specialisation:
Experience : 30 years
Areas of specialisation:
Quality control
Inspection and quality control
NDT
Quality audits
16/23
EXTOL
Experience : 25 years
Areas of specialisation:
• Project Management
• Financial Management
• Fund Management
• Business Development
7. KEY STRENGTHS
17/23
EXTOL
28 Warm Booster After Cooler 1 IOCL Panipat 685 2900 4698 Carbon Steel & Cupro Nickel (90/10
29 Booster Turbine After Cooler 1 JSPL Raigarh 3 489 4700 2679 Carbon Steel & Cupro Nickel (90/10)
18/23
EXTOL
Test
Sl Name of Equipment QTY Name of Project SIZE (mm) Weight Pressure- Year of
No. Nos. DIA LG/Ht. Thickness M.Tons Kg/cm² Supply
1 Nitrogen Water Tower 1 Siscol - India 1800 16424 8 14.0 4.6 Oct’ 2005
water filling
2 Air Water Tower 1 Siscol - India 1800 12920 10 11.01 9.6 Oct’ 2005
12 Cold Box Package - 1 1 Guardian - Russia 23.71 x 3.20 x 3.90 48.0 Jan’ 2008
13 Cold Box Package - 2 1 Guardian - Russia 23.60 x 3.20 x 3.90 46.0 Jan’ 2008
(2493 “ dia piping)
14 Cold Box Package – 1 1 All-Aratu – Brazil 23.71 x 3.20 x 3.90 48.0 May’2008
15 Cold Box Package - 2 1 ALL-Aratu - Brazil 23.60 x 3.20 x 3.90 46.0 May’2008
(2553 dia piping)
19/23
EXTOL
Manufacture and Supply of Cooler assembly for STEEL RINL 0.978 Completed
Expansion Turbine (Heat Exchanger) PLANT VISAKHA
PATNAM
STEEL PLANT
20/23
EXTOL
Earth work excavation, Laying of 3300 mm,3700 mm, Irrigation Megha 15.0 Under
and 3900 mm inner dia. M.S. Pipes 6 mtr. length, Engineering & Execution
Lowering,Jointing,and refilling of trenches and Hydro Infrastructures
testing for New Kaleshwaram Project – 20 km at Ltd
Medigadda site,25 km at Annaram site, 20 km at
Sundilla site
Making of approach to the specific locations at all Defence PLRC 5.03 Completed
levels in all types of soil, SDR and rock including
disposing of excavated material to a distance of upto
2.0 Kms
Supply of Structural Steel members made out of Defence PLRC 4.67 Completed
Angle, Beam, Channel and plates all as per drawings
including painting with one coat of Red oxide all as
per relevant to IS Standards complete.
Supply of MS Heavy Duty Pipes with flanges
Reclamation Works for the Land Development Works Air Ports Constructora 1.64 Completed
of Navi Mumbai International Airport, Package IV San Jose GVK
Projects and
Technical
Services
Pvt.Ltd.
Reclamation Works for the Land Development Works Air Ports Constructora 4.17 Under
of Navi Mumbai International Airport, Package IV – San Jose GVK Execution
Transporting of material by mechanical means upto Projects and
any lead and lift including loading, unloading, Technical
stacking, spreading & levelling etc. complete as Services
directed by Engineer. Pvt.Ltd.
21/23
EXTOL
Pressure Vessels
Heat Exchangers
Plant Piping
Hydro Mechanical Equipment
Manufacturing :
Construction Services :
Project :
Auxiliary Services :
Statutory Information :
22/23
EXTOL
CONTACT ADDRESS
23/23