SUMMARY
ITEM DESCRIPTION TOTAL AMOUNT
A.SUB STRUCTURE
1 Excavation and earth work 68,612.01
2 Concrete work 62,812.87
3 Masonry work 58,603.18
Sub Total (A) 190,028.06
B. SUPER STRUCTURE
1 Concrete work 108,164.08
2 Block work 141,711.77
3 Carpentry and Joinery work 146,633.55
4 Roofing work 95,850.32
5 Floor and wall Finishing work 27,479.64
6 Painting work 64,072.80
7 Electrical Instalation Err:509
Sub Total (B) Err:509
Total (A + B) Err:509
GRAND TOTAL Err:509
BILL OF QUANTITY AND SPESFICATION
CLIENT: ATO AMANIAL HADUSH TEFERI
PROJECT: LABORATORY AND
MEDICAL STOR
LOCATION : SHERARO
1.4 Back fill under hard core, around foundation wall and m3 4.32 1,036.80
footing column with selected materials & well
compacted at every 20 cm. select material from site. 240
Back fill under harde, around foundation wall and
1.5 footing column with selected materials & well m3 26.40 12,658.80
compacted at every 20 cm. select material from out
side the site. 479.5
Cart away surplus excavated material and deposite at 454.39
1.6 distance not exceeding 2km from site. m3 39.00 17,721.21
25 cm thick basaltic or equivalent stone hard core well 292.6
1.7 rolled consolidated and blinded with crushed stone. m3
72.00 21,067.20
5.1 -
a)Diametr 10-12 cm eucalyptus upper & lower,
members of truss. ml 72.00 107.99 7,775.28
b)Diametr 8-10cm eucalyptus vertical &
diagonal truss member ml 36.00 96.59 3,477.24
5.2 Diametr 8-10cm eucalyptus purlins. ml 168.00 96.59 16,227.12
Total carried to Summary 27,479.64
130.82 4 6.00
130.82 Kg. TOTAL 0.20
0.20
B) Ø 10 mm Deformed bar 0.96 M³
0.00 B) In Top tie beams @ +8
0.00 Kg. TOTAL
AXIS: 1,7
C) Ø 12 mm Deformed bar 0 25.40
131.42 0.40
131.42 Kg. TOTAL 0.40
- M³
D) Ø 14 mm Deformed bar AXIS: A,K
0 60.80
0.00 0.40
0.00 Kg. TOTAL 0.40
- M³
E) Ø 16 mm Deformed bar 1.92 M3 TOTAL
0.00 1.2, Form work
0.00 Kg. TOTAL 8 0.25 A) In elevation columns.
4 3.3
26.40 M
2
F) Ø 20 mm Deformed bar
0.00
0.00 Kg. TOTAL 26.40 M2 TOTAL
g) Ø 24 mm Deformed bar B) Intermidate beams @+ 3.6 & +4.8
0.00
0.00 Kg. TOTAL 2 12.00
3. Masonary 0.60
14.40 M
2
below NGL
2 36.00 2 6.00
0.5 0.60
7.20 M
2
1
36.00 M3 TOTAL B) In Top tie beams @ +8
Above NGL 0 25.40
2 36.00 1.20
0.5 - M2
0.6 21.60 M3 TOTAL 0 60.40
1.20
- M
2
21.60 M2 TOTAL
NO L/W/D QTY DESCRIPITION NO L/W/D QTY DESCRIPITION
1.3, Reinforcement bars.
A) Ø 8 mm Deformed bar
164.35
164.35 Kg. TOTAL
B) Ø 10 mm Deformed bar
0.00
- Kg. TOTAL
C) Ø 12 mm Deformed bar
131.42
131.42 Kg. TOTAL
D) Ø 14 mm Deformed bar
260.93
260.93 Kg. TOTAL
E) Ø 16 mm Deformed bar
0.00
- Kg. TOTAL
F) Ø 20 mm Deformed bar
0.00
- Kg. TOTAL
F) Ø 20 mm Deformed bar
0.00
- Kg. TOTAL
2. BLOCK WORK
2.1, 20*20*40cm thick concrete block
2 12
4.7 112.80 M2
3 6
4.3 77.40 M2
169.20 M2 TOTAL
4. METAL WORK
3 2 4.1 metal Doors
2.75
16.5 M2
16.5 M2 TOTAL
4.2 metal windows
2 1.5
1.5
4.50 M2
4.50 M2 TOTAL
5. STEEL WORK
4
0 No
5.3 RHS
a. 60*60*3 Diagonal 81.92 M2 TOTAL
25 21.50
5.20 2795
2795.0 kg 6.2 G-28 sheet metal gutter.
b. RHS 60*60*3 Vertical 1 12.00
25 7.00 12.00 ml
5.20 910
0 25.40
910.0 kg - ml
REINFORCEMENT SCHEDULE
FOUNDATION Reinforcement)
TOTAL LENGTH (M) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0
REINFORCEMENT SCHEDULE
(FOUNDATION COLUMN Reinforcement)
1.30 65 40
TOTAL LENGTH (M) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
REINFORCEMENT SCHEDULE
(GRADE BEAM Reinforcement)
TOTAL LENGTH (M) 331.20 0.00 148.00 0.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 130.82 0.00 131.42 0.00 0.00 0.00 0.00
REINFORCEMENT SCHEDULE
(Mesh Reinforcement)
TOTAL LENGTH (M) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SUMMARY FOR SUPER STRUCTURE
REINFORCEMENT SCHEDULE
(Elevation Columns Reinforcement)
TOTAL LENGTH (M) 194.67 0.00 0.00 216.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 76.89 0.00 0.00 261.36 0.00 0.00 0.00
REINFORCEMENT SCHEDULE
(BEAM Reinforcement)