Maximo Application Suite (MAS) Level 2 - Application Performance Management (APM) Quiz
Maximo Application Suite (MAS) Level 2 - Application Performance Management (APM) Quiz
30%
82%
70%
99%
You suggest working with a client via a Design Workshop. How long should you
suggest the project manager budget for the duration of the joint workshop?
8 - 12 weeks
1 month
2 months
2 weeks
Which two of the Asset Performance Management applications share the same user
interface?
A prospect would like to have models that include risk and criticality scoring, health
scoring and degradation models, and covers transformers, circuit breakers, switchgear,
and overhead/underground cables. What application of Maximo Asset Performance
Management has those items available out of the box?
Maximo Monitor
Maximo Health
Maximo Predict
You have delivered the client presentation to the prospect, what is the next step with
them?
Integration analysis
Install
Deploy
Return on Investment (ROI) analysis
When discussing the digital disruption in asset intensive industries with a prospect,
you mention a company that missed an opportunity because they were more
concerned with decreasing sales and didn't realize they were in the memory making
business. What company did that?
Opendoor
Xerox
Uber
Kodak
A prospect wants to try to understand the difference between how IBM Maximo
defines Asset Performance Management (APM) and Enterprise Asset Management
(EAM). Which answer is correct?
EAM shifts asset maintenance strategies from reactive and preventive to predictive
and prescriptive.
APM is designed for decision support, EAM is designed for maintenance execution.
EAM is designed for decision support, APM is designed for maintenance execution.
APM is designed for maintenance execution, EAM is designed for decision execution.
Share that typically clients experience as much as 60% decrease in labor costs
Share the results of the input of their data into the ROI Calculator tool located in
Seismic
1 month
12 weeks
8-12 weeks
12 months
A client is installing and wanting to use Maximo Health and Predict - Utilities. Which
type of user is required to access Maximo Health and Predict - Utilities?
Self-Service User
Premium User
Base User
Limited User
Client Average Interruption Duration Index (CAIDI) and System Average
Interruption Duration Index (SAIDI) are success metrics commonly used in which
industry?
Services
Utilities
Manufacturing
Federal/Public
Your prospect works with assets from different manufacturers in multiple countries.
What benefits of Maximo Asset Performance Management should you emphasize in
relation to this fact?
Equipment agnostic
Easy to deploy
Advanced Analytics
What type of re-invention is occurring that will change the operating model for asset
intensive companies?
Architectural
Visual
Textual
Digital
You have a prospect that builds and services elevators, what case study would be
good to bring to their attention?
Novate
Walmart
Armstrong Air
KONE
A prospect would like to install Maximo Predict. What, if any, other applications are
required also?
Maximo Manage
Which of the following case studies sited the metrics of an 87% predicted failure rate
with 100% accuracy and a savings of $10 million in missed revenue?
Armstrong Air
IBM, SAP, and Infor are competing for Asset Performance Management (APM)
business from the same prospect. What should the seller focus on when competing
with SAP and Infor?
Integration capabilities across portfolio and with other Enterprise Asset Management
(EAM) systems
IBM and GE are competing for Asset Performance Management business. What
should the seller focus on when competing with GE?
Artificial Intelligence (AI), Modern user interface (UI) / solution, fully integrated
solution
A prospect is looking to brings assets, often siloed in different areas, into a single
enterprise-wide view. Which of the following applications you would recommend?
Maximo Monitor
Maximo Predict
Maximo Manage
Maximo Health
McKinsey Global Institute reports that AI-driven predictive maintenance alone can
increase asset productivity by up to 20 percent and reduce maintenance costs by up to
what percent?
10%
20%
30%
40%
A client would like to install an SAP connector. How many AppPoints will that
consume?
80 AppPoints
150 AppPoints
1 AppPoint
50 AppPoints
When discussing daily challenges IBM hears from clients, what percentage of
maintenance activities are carried out too frequently?
70%
99%
82%
30%
You are working with a manufacturing client and want to find all the IBM sales assets
related to Maximo Monitor, Maximo Health, and Maximo Predict. Where do you go
to find that additional information?
A prospect is talking with you about optimizing asset performance and would like to
know what applications in the Maximo Application Suite would achieve foundational
asset performance management. The correct reply is?
Maximo Monitor, Maximo Health, Maximo Predict, and Maximo Health and Predict -
Utilities