A ISSUED FOR APPROVAL 26.11.2021, uuc. CHEN L. FAN XH. DONG L.
REV. DESCRIPTION DATE PREP'D cHK'D REVD APP'DBASIC DESIGN DOC. NO.: GEN-PPL-SPC-0026 REV. A PAGE 2 OF 14
1.0
WwW
12
20
3.0
40
44
42
43
44
45
5.0
6.0
61
62
63
64
7.0
774
72
7.3
8.0
at
CONTENT
GENERAL...
Purpose...
Definitions.
CODES AND STANDARD..
ABBREVIATIONS.
MATERIAL AND MANUFACTURE.
General Requirements...
Material
Heat Treatment.
Traceability
Non-metallic inclusions
CHEMICAL COMPOSITIO!
PROPERTIES AND TEST REQUIREMENTS.
Guided-Bend Test...
Hardness Tost..
Corrosion Test.
INSPECTION REQUIREMENTS
Visual Inspection.
Hydrostatic Test..
Non-destructive Test (NDT).
DIMENSION AND WEIGHT REQUIREMENTS...
Diameter and Wall Thickness Tolerance..BASIC DESIGN DOC. NO.: GEN-PPL-SPC-0026 REV. A PAGE 3 OF 14
8.2 Out-of-roundness
8.3 Wall Thickness Tolerance
84 — Length of Supply.
8.5 Straightness..
86 Pipe Ends.
&7 Delivered Weight
9.0 INSPECTION FREQUENCY.
10.0 PICKLING AND PASSIVATION
11.0 POSITIVE MATERIAL IDENTIFICATION (pmi)..
12.0 MANUFACTURING AND SUPERVISION
13.0 TEMPORARY PROTECTIVE MEASURES.
14.0 STORAGE AND TRANSPORATION...
15.0 DOCUMENTATION ..
16.0 MARKING...
17.0 OTHERSBASIC DESIGN DOC. NO.: GEN-PPL-SPC-0026 REV. A PAGE 4 OF 14
1.0
14
12
20
GENERAL
Purpose
This specification defines the minimum technical requirements for the fabrication, testing,
inspection and shipment of UNS N08825 (LC30-2242) welded pipe with filler metal,
which provided by VENDOR shall at least comply with the requirements of this
specification. The specification is supplement to AP! Spec SLC.
This technical specification is for NO8825 (LC30-2242) line pipe material which are
served in sour condition. The requirements in NACE MR 0175/ISO 15156-3 shall be
carried out.
The technical requirements in this specification are supplement to API Spec SLC, and
shall be used with API Spec 5LC.
Any deviation from this specification must be approved, in writing, by Company. Such
‘written approval must be obtained prior to the commencement of any work which would
constitute such a deviation.
Definitions
‘WORD MEANING
COMPANY PetroChina Intemational Iraq FZE Iraq Branch
“The organization selected and entrusted by COMPANY to
CONTRACTOR perform the Engineering, Procurement, Construction, Start-up,
re-Commissioning and Commissioning of the Project.
‘The party who is in charge of awarding agreement on behalf of
PURCHASER COMPANY / CONTRACTOR for the supply of goods and
services in connection with the work.
The party to the contract and/or purchase order which has
VENDOR’ SUPPLIER’ _| undertaken the obligation to supply the goods and/or services
SUBCONTRACTOR which are ordered and specified herein.
Shall Indicates a mandatory requirement
Should Indicates a strong recommendation to comply with the
requirements of this document
CODES AND STANDARD
Vendor shall meet or exceed the requirements of the latest edition of the following codes,
regulations and standards, except as superseded herein. In cases where more than one
code, regulation or standard apply to the same condition, the most stringent shall be
followed. In the event of a conflict between this specification and other specifications or
correspondence, the Company shall be consulted and a ruling, in writing, shall be
obtained before any work is started.BASIC DESIGN DOC. NO.: GEN-PPL-SPC-0026 REV.:A | PAGESOF 14
API Spec 5LC CRA Line Pipe
Standard Test Methods and Definitions for Mechanical
ASTM A370 Testing of Steel Products
Standard Practice for Cleaning, Descaling, and
ASTM A380 Passivation of Stainless Steel Parts, Equipment, and
Systems
Standard Specification for Chemical Passivation
ASTM AS67 Treatments for Stainless Stee! Parts
Standard Test Methods for Determining the Inclusion
ASTM E46 Content of Stee!
ASTM ES2 Standard Test Method for Vickers Hardness of Metallic
Materials
‘ASTM E262 Standard Practices for Detecting Susceptibility to
Intergranular Attack in Austenitic Stainless Steels
Standard Practice for Preparation and use of Bent-Beam
‘ASTM C30 ‘Stress-Corrosion Test Specimens
Standard Test Methods for Pitting and Crevice Corrosion
ASTM G48 Resistance of Stainless Steels and Related Alloys by Use
of Ferric Chloride Solution
Iso 7539-2 corrosion of metals and alloys-stress corrosion testing-part
2: preparation and use of bent-beam specimens
NACE MRO175/ Petroleum, Petrochemical, And Natural Gas Industries —
Materials for Use In H:S-Containing Environments In Oil
ISO 15156 And Gas Production
Standard Test Method - Laboratory Testing of Metals for
NACE TM0177 Resistance to Sulfide Stress Cracking and Stress
3.0 ABBREVIATIONS
Corrosion Cracking in H»S Environments
ID Inside Diameter
MPQ Manufacture Process Qualification
NDT Non-destructive Testing
NPS. Nominal Pipe Size
oD Outside Diameter
PREN Pitting Resistance Equivalent Number
uT Ultrasonic TestingBASIC DESIGN DOC. NO.: GEN-PPL-SPC-0026 REV. A PAGE 6 OF 14
4.0
4a
42
43
45
5.0
MATERIAL AND MANUFACTURE
General Requirements
Any clauses and contents not covered by this specification for pipes shall meet the
Tequirements in API Spec 5LC.
‘Sour service designation marking according to NACE MRO175/ISO15156-3 and Annex
C of API Spec SLC shall be applied.
‘Any non-conformance of this specification with API Spec SLC shall be implemented as
per more stringent regulations.
‘Substantive deviation to this specification and API Spec SLC by Vendor is not allowed,
except getting the permission of Company.
Except as otherwise agreed between the Vendor and the Company, all inspections and
tests required for qualification and pipe acceptance shall be performed at the factory
All pipes shall be with one longitudinal weld seam with filler metal ER-NiCrMo3 and
formed from a single length having no circumferential weld.
All pipes that are not bright annealed must be subjected to final pickling and passivation
as per ASTM A380.
Material
Material: UNS NO8825 (LC30-2242)
Heat Treatment
The pipe shall be solution annealed
Traceability
The manufacturer shall establish and follow procedures for maintaining heat andior lot
identity until all required heat and/or jot tests are performed and conformance with
specification requirements has been shown.
Non-metallic inclusions.
Non-metallic inclusions with Class A, B, C or D in steel pipe shall not be above Class 1.0
respectively and the total shall not be higher than Class 3.5. The measurement of non-
‘metallic inclusion shall be performed according to ASTM E 45.
CHEMICAL COMPOSITION
Chemical composition of pipe shall comply with the requirements of Table 5.0-1, as
follows.BASIC DESIGN DOC. NO.: GEN-PPL-SPC-0026 REV. A PAGE 7 OF 14
6.0
64
62
63
64
64.1
Table 5.0-1 Chemical composition
Grade steel Content (wt%)" pReW
c Mn P Ss Si
UNS Nose25 0.05 1.0 0.03 50.03 0.5
Ni cr Mo Cu Ti 231
seas | 195-235 | 25-35 | 15-3 | os12
NOTES:
a. Maximum, unless a range or minimum is indicated
b. PREN = %Cr + 3.3x%Mo# 16x%N
PROPERTIES AND TEST REQUIREMENTS
Tensile Test
Tensile test conform to the tensile properties prescribed in Table 6.1-1.
Table 6.1-1 Tensile Tost Requirements
Yield Strength Tensile Strength Elongation
Pipe Grade | Ro, (MPa), Min, | Ra(MPa),Min, | Ar(%).Min,
UNS Nose25 207 551 30
Guided-Bend Test
‘The guided-bend test and acceptance criteria shall be performed in accordance API
Spec SLC.
Hardness Test
Hardness testing on pipe shall be performed using the Vickers test in accordance with
the requirements of ASTM E92, and the individual maximum hardness at any position
shall be not higher than 265HV10.
The hardness of the HAZ after welding shall not exceed the maximum hardness allowed
for the base metal and the hardness of the weld metal shall not exceed the maximum
hardness limit of the respective alloy used for the welding consumable.
Corrosion Test
Pitting Corrosion Resistance Test
The pitting corrosion test procedure shall be carried out according to the method A
defined in ASTM G48 for each heat number.
The test specimens shall be cut such that surfaces representative of the full thickness of
the product are exposed. Specimens may only be pickled and passivated prior to testingBASIC DESIGN DOC. NO.: GEN-PPL-SPC-0026 REV. A PAGE 8 OF 14
6.4.2
6.4.3
if this will also be part of the final product manufacturing specification. Test specimen
shall be prepared according to ASTM G48.
Test solution: ASTM G48 ferric chloride test solution (about 6% FeCls by mass).
1m Test temperature: 2521°C.
The acceptance criteria, as follows:
No pitting on the test face surface, under visual examination with a magnification of 20x.
Weight loss shall be recorded and no more than 4.0g/m2.
Intergranular Corrosion Resistance Test
Intergranular corrosion test for NO8825 according to ASTM A262 method C shall be
performed during production stage, and the average corrosion rate in 5 boiling periods of
each 48h shall be less than 0.72mmiyear.
Requirements for sensitization of samples shall be as specified in ASTM A262.
Intergranular corrosion test for NO8825 according to ASTM A262 method E shall be
performed during MPQ stage to assure proper manufacturing procedures, which
fequited in API Spec SLC section 8.2.
Stress Corrosion Cracking Test
Four-point bending test specimen shall be adopted as per ASTM G39 and test be
carried out according to NACE TMO177. Test medium shall be under the simulating
actual working condition of HS, CO, partial pressure, temperature, gas water condition.
Loading the corresponding parent metal shall be 100% AYS, then observing the sample
under 10 x microscope after 720 hours. The test shall ensure no SCC surface crack and
craze on the tension surface, and satisfy the rules of the standard of NACE TMO177.
The simulated environmental conditions are shown in table 6.4-1
Table 6.4-1 Test Requirements of Simulation Environment,
Bese | Be" Te | roe
prggsure | tomrerature | ba) | Po
‘Solution components
Na’:67257mg/l; Ca”*:9200mgil;
Mg"":2430mag\|; K*:2081ma/t;
4MPa 100 100 | 200 100%AYS — | Sr’*:1140.5mg/l; CI:129575mall;
S0,*:320mgil; HCO; 427mg;
pH:6.8;
70
TA
INSPECTION REQUIREMENTS
Visual Inspection
All finished pipe shall be visually examined and shall be free of defects as defined in
12.5 of API Spec 5LC. Repair of defects see 12.6 of API Spec SLC.BASIC DESIGN DOC. NO.: GEN-PPL-SPC-0026 REV. A PAGE 9 OF 14
72
73
8.0
84
82
83
Hydrostatic Test
Hydrostatic test shall be carried out in factory to all pipes before NDT. Each pipe shall be
hydrostatic tested according to API Spec 5LC. Pressure shall be held for not less than
10s, during which leakage shall not occurred to the pipe. The water used for hydrostatic
test shall contain less than 25ppm chlorides. Records made by automatic hydrostatic
recorder shall be available.
Non-destructive Test (NDT)
Each pipe shall be examined with a non-destructive test. The weld seam shall be tested
by radiological method. The specified requirements shall be according to section 11 of
API Spec 5LC.
‘Such pipes shall be rejected if the test signal was produced by imperfections that cannot
be identified or was produced by cracks or crack-like imperfections. Any repaired pipe by
welding shall be not accepted.
All bevel face shall carry out liquid penetrant testing, and the pipe bevel face shall be
free of laminations and inclusions.
The pipe face shall be free of laminations and inclusions.
Blind area without inspection is not allowed for each pipe.
Vendor shall produce the non-destructive test procedures (automatic and manual)
intended to use, including the equipment capabilities, the reference standards for
calibration of sensitivity, and the acceptance criteria. These procedures shall be
submitted at bid stage and shall be subject to qualification tests prior to production start
DIMENSION AND WEIGHT REQUIREMENTS
Diameter and Wall Thickness Tolerance
The permissible variations in diameter and wall thickness tolerance shall not exceed
those prescribed in API Spec SLC.
Out-of-roundness
For pipe larger than 20° and for a distance of 101.6 mm from the ends of the pipe, the
maximum outside diameter shall not be more than 1% larger than specified, and the
minimum outside diameter shall not be more than 1 % smaller than specified, measured
with a bar gauge, calliper, or other device capable of measuring the actual minimum and
maximum diameters.
Wall Thickness Tolerance
‘The average wall permissible variations in walll thickness shall be (+10%, -10%) under
the nominal wall thickness specified.BASIC DESIGN DOC. NO.: GEN-PPL-SPC-0026 REV. A PAGE 10 OF 14
84
85
87
Length of Supply
The length of pipe for straight pipe shall be 11.5m + 0.5m. It is not allowed to adopt
circumferential weld to connect pipes. all pipe lengths shall be recorded.
St
ightness
The finished pipe shall be reasonably straight and free of bends or kinks. All pipes shall
be randomly checked for straight line shall not exceed 0.2% the length
Pipe Ends
The end face of pipe shall be bevelled for welding. To measure as the benchmark of
vertical line of axis of steel pipes, for the equal wall thickness welding steel joint, the
angle of the bevel shall be 30°. The width of root face is 1.6mm + 0.8mm.
When inner surface is fabricating or bumishing, the angle of the taper measured from
the longitudinal axis shall be no more than 7°
Delivered Weight
Pipes shall be delivered according to theoretical weight, and the deviation between
practical weight and theoretical weight must be controlled within (+10%, -3.5%)
INSPECTION FREQUENCY
Inspection frequency shall comply with the following Table 9.0-1 first, other requirements
of inspection frequency shall be in accordance with API Spec SLC.
Table 9.0-1 Inspection Frequency
Type of Inspection Frequency of Inspection Remarks
Heat analysis Each heat on the purchaser order
Hardness test the same with tensile test frequency
specified in API Spec SLC
Intergranular corrosion test
(ASIAN ADED method E) | Only for MPO stage
‘Non-metallic inclusions. ‘lot shall be of the same
‘nominal diameter and wall
Piting corrosion test thickness, produced from
(ASTM G48) the same heat of steel and
annealed in a continuous
each ot furnace at the same
Intergranular corosion test temperature, time at
(ASTM A262 method C) temperature, and furnace
speed. When final heat
a batch-typeBASIC DESIGN DOC. NO.: GEN-PPL-SPC-0026 REV. A PAGE 11 OF 14
10.0
11.0
12.0
‘Type of Inspection Frequency of Inspection Remarks
fumace, a lot shall include
only those pipes of the
same size and the same
heat which is heat treated in
the same fumace charge.
each of the first 3 heat steels and
SCC test every 10 heats latter with the same
heat treatment process:
Visual inspection Each pipe
NOT Each pipe
Hydrostatic test Each pipe
PICKLING AND PASSIVATION
All pipes that are not bright annealed must be subjected to final pickling and passivation
as per ASTM A380.
The pickled liquid should be chosen according to ASTM A380. The final solution,
exposure time and temperature, etc. for pickling and passivation shall be included in the
picking and passivation procedure. The detailed requirements and more information
about pickling and passivation shall comply with ASTM A380 and ASTM A967.
For final rinsing, only fresh water with a chloride ion concentration of less than 25 ppm
shall be used
POSITIVE MATERIAL IDENTIFICATION (PMI)
PMI shall be conducted on finished pipes on each lot before dispatch. A minimum of 5%
of pipes in each heat must be tested
PMI should include the weld for pipes welded with addition of filler metal.
MANUFACTURING AND SUPERVISION
During the period of pipe manufacturing, purchaser is entitled to assign
Representative/inspector to the plant for pipe inspection and acceptance, and is entitled
to reject pipe which fails to meet requirements.
If necessary, Representative/Inspector assigned by purchaser shall perform spot-check
for production to guarantee consistency with standard and this agreement.
Vendor of pipe shall allow Representativelinspector assigned by purchaser to perform
inspection and spot-check to test record and test specimen during the period of pipe
‘manufacturing.BASIC DESIGN DOC. NO.: GEN-PPL-SPC-0026 REV. A PAGE 12 OF 14
13.0 TEMPORARY PROTECTIVE MEASURES
The outside surface of pipe is without any coating and lubricating. Pipe end shall be
equipped with pipe end protector. Pipe size shall be identified piece by piece according
to practical dimension. In addition, the pipe end shall add support to avoid the
deformation of pipe end.
14.0 STORAGE AND TRANSPORATION
During manufacture, storage, and transportation, the pipe shall not contact with loose
carbon steel (e.g. swarf, filing etc.). Nylon sling or rubber-coated hooks/support etc.
shall be used for all handing operation.
The pipe shall be segregated from other materials during storage and supported during
stacking to avoid deformation.
Vendor shall be responsible for the protection of pipe during storage. Vendor shall be
subject to regulation of pipe storage specified by purchaser during bidding.
The pipe packaging and loading for shipment shall be performed according to the
procedures of Practices ASTM A700, and all pipes shall not travel as deck cargo.
15.0 DOCUMENTATION
The Vendor shall provide the Company at the bid stage with a technical specification
giving full details of all the characteristics of the proposed steel, the steel-making
process, the billet manufacturing process and the inspection procedures.
The Vendor's specification shall include the following minimum information:
™ The manufacturer's latest 5 years supply application shall be supplied for the similar
size, it s better to supply the service condition at the same time:
Pipe manufacture process:
‘Special treatments for controlling residual elements and segregations;
Nominal weight of each heat;
Heat treatment process of pipe (including temperature, soaking time and cooling
medium, etc.);
‘Aimed chemical analysis, together with minimum and maximum working limits (ladle
and check) selected for the order;
™ Visual inspection;
m= NDT procedures;
= Dimensional inspections with frequencies of execution.
Unless otherwise specified by Company, the following information shall also be included
in Vendor's specification:BASIC DESIGN DOC. NO.: GEN-PPL-SPC-0026 REV. A PAGE 13 OF 14
Name of pipe manufacturer and Mill;
Unit length of pipes offered, if different from that stated;
Location of paint stenciling (on inside or outside of pipe);
Pipe supply track record as well as histograms of chemical and mechanical test
results from previous orders of the same pipe grade;
At Vendor's option, any other technical information related to the proposed pipe
‘supply;
Description of the proposed pipe end protectors (if any);
m= The Vendor's deviations/qualifications to present specifications. Where no
deviations are stated in the bid, the potential Vendor shall be considered as fully
accepting the requirements of present specification.
Vendor shall submit the final documents (2 electronic copies, 10 hard copies) when
delivery, including:
™ Production analysis report;
Tensile test report;
Guide-bend test report;
Hardness test report;
Pitting corrosion resistance test;
Intergranular corrosion resistance test report;
SCC test report;
NDT report;
Factory hydrostatic test report;
= Product quality certificate;
The report shall be approved and signed by the Purchaser's Representative/Inspector
who attended the tests.
16.0 MARKING
For pipe up to 16°, paint stencil on the outside surface starting at a point between
450mm and 750mm from the end of the pipe, and in the sequence shown below, except
when agreed between the purchaser and the manufacturer some or all of the markings
‘may be placed on the inside surface in a sequence convenient to the manufacturer.
For pipe 16" OD and Larger, paint stencil on the inside surface starting at a point no less
than 150mm from the end of the pipe in a sequence convenient to the manufacturer,
unless othenvise specified by the purchaser.
‘Sequence of Markings shall be in accordance with section 13.3 of API Spec SLC.BASIC DESIGN DOC. NO.: GEN-PPL-SPC-0026 REV. A PAGE 14 OF 14
17.0 OTHERS
The manufacturer shall provide pipe samples in advance to the purchaser for weld
process performance test.
For all UNS NO8826 line pipes, Material certificate BS EN10204 Type 3.1 shall be
provided