PEMERINTAH KABUPATEN KUTAI BARAT

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


BIDANG BINA MARGA
Alamat : Jln. Sendawar III Pusat Perkantoran Kabupaten Kutai Barat Telp. (0545) 4043794

GAMBAR RENCANA
SUB KEGIATAN :
REKONTRUKSI JALAN

PEKERJAAN :
REKONSTRUKSI JALAN POROS - PENINGGIR
LOKASI :
KECAMATAN MUARA LAWA

KONTRAKTOR PERENCANA
PEMERINTAH KABUPATEN KUTAI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG BINA MARGA
Alamat : Jln. Sendawar III Pusat Perkantoran Kabupaten Kutai Barat Telp. (0545) 4043794

LEMBAR PENGESAHAN

SUB KEGIATAN :
REKONTRUKSI JALAN

PEKERJAAN :
REKONTRUKSI JALAN POROS - PENINGGIR

LOKASI :
KECAMATAN MUARA LAWA

MENGETAHUI: DIBUAT OLEH:


(PPK) KONSULTAN PERENCANA
PEJABAT PEMBUAT KOMITMEN CV. SURYA ANUGRHA

YOHANIS SAU' PALAYUKAN, ST.M.Si NUNUK NUGROHO, ST


NIP. 19810611 201101 1 006 DIREKTUR
LAY OUT PEKERJAAN
LOKASI PEKERJAAN
PANJANG : 1,260 M

STA 1 + 700
AWAL PEKERJAAN
Koordinat:
E: 381191.199
N: 9936795.399

Jalan Poros Trans Kalimantan


STA 2 + 960
AKHIR PEKERJAAN
Koordinat:
E: 381528.723
N: 9935878.988

LOKASI PEKERJAAN
PANJANG : 1,260 M

STA 1 + 700
AWAL PEKERJAAN
Koordinat:
E: 381191.199
N: 9936795.399
LONG SECTION
Segmen
Jalan

132

128

124

120

116

112

HIGH POINT ELEV = 95.931


108 HIGH POINT ELEV = 94.915 HIGH POINT STA = 1+956.838
LOW POINT ELEV = 94.431
HIGH POINT STA = 1+838.006 PVI STA = 1+949.951 PVI STA = 1+957.333
LOW POINT STA = 1+874.583 PVI STA = 1+925
LOW POINT ELEV = 92.843 PVI STA = 1+825 PVI STA = 1+837.500 PVI STA = 1+900 PVI ELEV = 95.929 PVI ELEV = 95.931
PVI STA = 1+875 PVI ELEV = 95.370
104 PVI STA = 1+725 PVI STA = 1+750
LOW POINT STA = 1+772.716
PVI STA = 1+775
PVI STA = 1+800 PVI ELEV = 94.714
A.D. = -2.975
PVI ELEV = 94.933
A.D. = -2.907
PVI ELEV = 94.409
PVI ELEV = 94.940
A.D. = -0.403
A.D. = 0.522
A.D. = -2.213
K = 2.259
A.D. = -5.980
K = 0.167
PVI ELEV = 93.534 A.D. = 3.640 K = 9.584
PVI ELEV = 93.082 PVI ELEV = 92.871 PVI ELEV = 92.840 K = 1.720 K = 12.396
A.D. = 1.947 K = 1.681 K = 1.374
A.D. = 2.184 A.D. = 0.719 A.D. = 2.901

BVCS: 1+956.833
EVCS: 1+952.451

EVCS: 1+957.833
K = 2.568

BVCS: 1+947.451
EVCS: 1+927.500

EVCE: 95.930

BVCE: 95.931
100

BVCE: 95.873

EVCE: 95.901
BVCS: 1+922.500
K = 2.289 K = 6.951 K = 1.723
PVI ELEV = 94.788

EVCS: 1+902.500
PVI STA = 1+850

BVCS: 1+897.500

EVCE: 95.426
BVCE: 95.327
EVCS: 1+827.500
BVCS: 1+822.500

EVCS: 1+877.500
BVCS: 1+872.500

EVCE: 94.983
BVCE: 94.889

EVCE: 94.904

BVCE: 94.887
EVCS: 1+840
EVCE: 94.758

BVCS: 1+835
BVCE: 94.596

BVCE: 94.447

EVCE: 94.462
EVCS: 1+802.500
BVCS: 1+797.500
BVCS: 1+722.500

EVCE: 93.652
EVCS: 1+727.500

BVCE: 93.464
BVCS: 1+747.500

EVCS: 1+777.500
EVCS: 1+752.500

BVCS: 1+772.500
BVCE: 93.158

EVCE: 93.061

EVCE: 92.909
BVCE: 92.892

EVCE: 92.868

BVCE: 92.843

96 1.748% -1.159% 1.720%


2.242% 0.029%
-5.951%
-1.516% 2.123%
4.723%
-3.029%
-0.845% -0.125% 2.776%

92

88

84

80
V: 2.5 m

76

H: 25 m
72
Datum Elivasi : 60
Elivasi
93.839 93.639

93.096 92.882

92.977 92.752

92.855 92.643

93.187 92.837

93.546 93.334

94.915 94.733

94.788 94.588

94.598 94.352

94.674 94.456

95.155 94.956

95.650 95.462

95.916 95.729
94.432 94.209
92.858 92.640

94.937 94.740

95.624 95.490
95.373 95.170
92.875 92.671

94.124 93.891

94.696 94.514
93.461 93.116

Existing
Elivasi
Rencana
STA 1+700 1+725 1+750 1+775 1+800 1+825 1+850 1+875 1+900 1+925 1+950
Segmen
Jalan

132

128

124

120

116

112

108
= 1+975

104V==-1.315
94.880
PVI STA = 2+000
HIGH POINT ELEV = 91.770
HIGH POINT STA = 2+176.321
3.803 PVI ELEV = 93.063 LOW POINT ELEV = 89.907
PVI STA = 2+025 PVI STA = 2+175 PVI STA = 2+187.500 PVI STA = 2+200
A.D. = 0.712 LOW POINT STA = 2+099.071 PVI STA = 2+150.013 PVI STA = 2+212.500
PVI ELEV = 91.425 PVI STA = 2+050 PVI ELEV = 91.784 PVI ELEV = 91.695 PVI ELEV = 91.426 PVI STA = 2+225
PVI STA = 2+125 PVI ELEV = 91.209
100 K = 7.019
A.D. = 2.351
PVI STA = 2+075 PVI STA = 2+100 A.D. = -3.012 A.D. = -1.439
PVI ELEV = 91.108
PVI ELEV = 90.594
EVCS: 1+977.500

PVI ELEV = 90.374 PVI ELEV = 90.254 A.D. = -1.513 A.D. = -0.398
PVI ELEV = 90.060 A.D. = -1.565
EVCE: 94.698

K = 2.127 PVI ELEV = 89.896 K = 1.660 K = 1.390 A.D. = -1.456


A.D. = 2.945 A.D. = 2.380 K = 3.305 K = 5.028
A.D. = 0.600 K = 1.278
BVCS: 1+997.500

A.D. = 2.092
EVCS: 2+002.500

K = 1.374
BVCE: 93.245

K = 1.698 K = 2.101
EVCE: 92.899

K = 8.330 K = 2.390

EVCS: 2+177.500
BVCS: 2+172.500

BVCS: 2+186.500
BVCS: 2+022.500

EVCS: 2+188.500
EVCS: 2+027.500

96

EVCS: 2+152.513

EVCE: 91.766
BVCE: 91.726

BVCE: 91.702

EVCE: 91.673

BVCS: 2+211.500

EVCS: 2+213.500
BVCS: 2+147.513
BVCE: 91.589

BVCE: 91.448
BVCS: 2+199

EVCS: 2+201

EVCE: 91.401
EVCE: 91.320

EVCE: 91.266
BVCS: 2+047.500

BVCE: 91.133

EVCE: 91.067
BVCE: 91.113
EVCS: 2+052.500

EVCS: 2+127.500
BVCS: 2+122.500
BVCS: 2+072.500

EVCS: 2+077.500

BVCE: 90.635
BVCS: 2+224
BVCS: 2+097.500
BVCE: 90.479

EVCE: 90.538
EVCS: 2+102.500

EVCS: 2+226
EVCE: 90.350
EVCE: 90.343

BVCE: 90.218
BVCE: 90.091

EVCE: 90.043

EVCE: 89.931
BVCE: 89.912

-7.266%

-6.553%
92 -4.203%
2.302% -0.710% -2.150% -2.547%
-4.112%
3.815%
-1.257% -0.657% 1.435% -5.568%

88

84

80
V: 2.5 m

76

H: 25 m
72
Datum Elivasi : 60
Elivasi
90.269 90.054

91.104 90.908
94.871 94.680

93.971 93.787

93.068 92.863

90.900 90.533

90.064 89.860

89.978 89.687

89.909 89.696

90.075 89.868

90.731 90.526

90.590 90.394

89.898 89.748
92.244 92.015

90.393 90.174

90.217 90.017

91.199 91.008
91.440 91.225

91.496 91.423

91.765 91.584

91.691 91.495

91.425 91.226
Existing
Elivasi
Rencana
STA +975 2+000 2+025 2+050 2+075 2+100 2+125 2+150 2+175 2+200 2+225
V: 2.5 m

Segmen

STA
H: 25 m

Elivasi
Elivasi
Jalan

Existing

Rencana
Datum Elivasi : 60
100
112
116
124
128
132

72
76
84
88
92
96

80
104
108
120
89.189 89.002

2.467
= -2.027
EVCS: 2+252.500

= 2+250
V = 89.202
EVCE: 89.012

+250
88.252 88.022

-7.595%
PVI STA = 2+275

87.303 87.103 PVI ELEV = 87.303

2+275
-7.528%
86.362 86.109

BVCS: 2+297.500

BVCE: 85.609

K = 1.703
85.439 85.221

A.D. = 2.935
EVCS: 2+302.500

PVI STA = 2+300


PVI ELEV = 85.421
EVCE: 85.306

2+300
-4.593%
84.847 84.513

BVCS: 2+322.500

BVCE: 84.388

K = 3.725
84.281 84.073

A.D. = 1.342
EVCS: 2+327.500

PVI STA = 2+325


PVI ELEV = 84.273
EVCE: 84.192

2+325
-3.251%
83.866 83.665

BVCS: 2+347.500

BVCE: 83.541

83.462 83.260

K = 18.930
A.D. = 0.264
EVCS: 2+352.500

PVI STA = 2+350


PVI ELEV = 83.460
EVCE: 83.385

2+350
-2.987%
83.087 82.815

BVCS: 2+372.500

BVCE: 82.788

K = 4.367
82.721 82.513

A.D. = 1.145
EVCS: 2+377.500

PVI STA = 2+375


PVI ELEV = 82.713
EVCE: 82.667

2+375
82.483 82.285

-1.842%
PVI STA = 2+400

82.253 82.053 PVI ELEV = 82.253

2+400
-1.673%
82.044 81.834

PVI STA = 2+425

81.835 81.635 PVI ELEV = 81.835

2+425
-1.344%

81.667 81.444

BVCS: 2+447.500

BVCE: 81.532
K = 8.410

81.502 81.299
A.D. = 0.595

EVCS: 2+452.500
PVI STA = 2+450
PVI ELEV = 81.499

EVCE: 81.480

2+450
-0.750%

81.405 81.231

BVCS: 2+472.500

BVCE: 81.330

81.313 81.111
K = 15.213
A.D. = 0.329

EVCS: 2+477.500
PVI STA = 2+475
PVI ELEV = 81.311

EVCE: 81.301
2+475
-0.421%

81.258 81.068

BVCS: 2+497.500

BVCE: 81.216
K = 2.153

81.220 81.006
A.D. = 2.323

EVCS: 2+502.500
PVI STA = 2+500
PVI ELEV = 81.206

EVCE: 81.253
LOW POINT ELEV = 81.214
LOW POINT STA = 2+498.407

2+500
1.902%

BVCS: 2+511.500

BVCE: 81.424
EVCS: 2+513.500
K = 0.399

81.431 81.244
A.D. = -5.015

EVCE: 81.412
PVI ELEV = 81.444
PVI STA = 2+512.500
HIGH POINT ELEV = 81.432
HIGH POINT STA = 2+512.258
STA
2+800
Segmen
Jalan

132

128

124

120

116

112

108

104
HIGH POINT ELEV = 89.697
LOW POINT ELEV = 89.342
HIGH POINT STA = 2+712.956
LOW POINT STA = 2+749.855
100 PVI STA = 2+700
PVI STA = 2+712.500 PVI STA = 2+725 PVI STA = 2+750 PVI STA = 2+775
PVI ELEV = 89.708 PVI ELEV = 89.514 PVI ELEV = 89.332 PVI ELEV = 89.537
PVI STA = 2+675 PVI ELEV = 89.189
A.D. = -5.700 A.D. = 0.820 A.D. = 1.551 A.D. = 1.584
PVI ELEV = 87.950 A.D. = -0.809
K = 0.351 K = 2.440 K = 3.157
A.D. = -3.677 K = 6.183 K = 3.225
96 PVI STA = 2+650
PVI ELEV = 85.791 K = 1.360

EVCS: 2+713.500

EVCS: 2+777.500
BVCS: 2+711.500

BVCS: 2+772.500
BVCS: 2+747.500

EVCS: 2+752.500
EVCS: 2+702.500
A.D. = -1.291

EVCE: 89.693
BVCS: 2+697.500

BVCE: 89.667

EVCE: 89.597
BVCE: 89.530

EVCE: 89.507
BVCS: 2+724

BVCE: 89.516
EVCS: 2+726

BVCE: 89.350

EVCE: 89.352
EVCE: 89.293
PVI STA = 2+625
BVCE: 89.066
K = 3.873
EVCS: 2+677.500

LOW POINT ELEV = 80.672


BVCS: 2+672.500

PVI ELEV = 83.309


EVCE: 88.074

92A = 2+525
BVCE: 87.734

LOW POINT STA = 2+550.570 PVI STA = 2+600 A.D. = 3.097


PVI STA = 2+575
EVCS: 2+652.500

PVI STA = 2+550 PVI ELEV = 81.602 K = 1.615


BVCS: 2+647.500

EVCE: 86.007

V = 81.054 PVI ELEV = 80.907


BVCE: 85.543

PVI ELEV = 80.657 A.D. = 4.051 -1.550% 2.404%


= 1.524 4.150% -0.730% 0.820%
A.D. = 2.589 A.D. = 1.780 K = 1.234 4.959%
EVCS: 2+627.500

= 1.312
BVCS: 2+622.500

K = 2.809
88
EVCE: 83.557

K = 1.931
BVCE: 83.138

8.636%
EVCS: 2+602.500
BVCS: 2+597.500

EVCE: 81.772
EVCS: 2+577.500
BVCS: 2+572.500

BVCE: 81.532
BVCS: 2+547.500

EVCS: 2+552.500
BVCE: 81.085

EVCE: 81.038
EVCS: 2+526

EVCE: 80.976
BVCE: 80.882
BVCE: 80.697

EVCE: 80.682

9.927%
84
6.830%
2.779%
-1.590% 0.999%
80
V: 2.5 m

76

H: 25 m
72
Datum Elivasi : 60
Elivasi
86.870 86.956

89.184 88.989

89.547 89.337

89.837 89.683
80.918 80.707
81.058 80.854

80.856 80.635

80.673 80.457

80.782 80.559

81.254 80.945

82.455 82.055

84.550 84.306

87.927 87.750

88.570 88.406

89.694 89.508
81.627 81.402

83.328 83.109

85.783 85.591

89.517 89.314

89.342 89.132

89.434 89.174
89.423 89.113
Existing
Elivasi
Rencana
STA +525 2+550 2+575 2+600 2+625 2+650 2+675 2+700 2+725 2+750 2+775
STA
2+960
Segmen
Jalan

132

128

124

120

116

112

108

104 HIGH POINT ELEV = 90.867


HIGH POINT STA = 2+871.866
PVI STA = 2+850 PVI STA =PVI
2+872.705
STA = 2+875
PVI STA = 2+825
100V ==2+800
90.138 PVI ELEV = 90.350
PVI ELEV = 90.714 PVI ELEV
PVI=ELEV
90.873
A.D. = A.D.
-8.687
= 90.690
A.D. = 0.605 A.D. = -0.755 = -2.508
= -1.554 PVI STA = 2+900
K = 6.626 K = 0.230
K = 0.399
3.218 K = 8.270 PVI ELEV = 88.066
A.D. = -1.705
96
BVCS: 2+871.705

BVCS: 2+874.500
EVCS: 2+873.705
BVCS: 2+847.500

EVCS: 2+852.500

2+875.500

K = 2.932 PVI STA = 2+925


BVCS: 2+822.500

EVCS: 2+827.500

BVCE: 90.866

LOW POINT ELEV = 83.165


EVCS: 2+802.500

BVCE: 90.730
90.793
EVCE: 90.732
BVCE: 90.678

EVCE: 90.637
EVCE: 90.387
BVCE: 90.329
EVCE: 90.159

PVI ELEV = 85.016 PVI STA = 2+937.500 LOW POINT STA = 2+999.159
A.D. = 4.181 PVI STA = 2+950
PVI STA = 2+975
BVCS: 2+897.500

PVI ELEV = 84.014 PVI STA = 3+000


EVCE:

PVI ELEV = 83.641


EVCS: 2+902.500
BVCE: 88.328

K = 1.196 A.D. = 5.039 PVI ELEV = 83.248 PVI ELEV = 83.162


92
EVCE: 87.761
EVCS:

A.D. = 1.406
K = 0.397 A.D. = 1.228 A.D. = 4.349
0.700% -7.987% K = 1.423
1.455% K = 1.628
BVCS: 2+922.500

0.850% K = 0.460
EVCS: 2+927.500
BVCE: 85.321

-10.494%
EVCE: 84.816

BVCS: 2+936.500

EVCS: 2+938.500
BVCE: 84.094

EVCE: 83.984

BVCE: 83.671

EVCE: 83.626
BVCS: 2+949

88
EVCS: 2+951

BVCE: 83.264

EVCE: 83.245
BVCS: 2+974

EVCE: 83.202
EVCS: 2+976

BVCE: 83.165
EVCS: 3+001
BVCS: 2+999
-12.200%

-8.018%
84 -2.980%
-1.574% -0.346%
4.003%

80
V: 2.5 m

76

H: 25 m
72
Datum Elivasi : 60
Elivasi
90.128 89.938

89.378 89.295

88.055 87.866

83.172 82.962

83.662 83.336

84.162 83.962
90.687 90.490
90.802 90.669

83.251 83.048
90.532 90.241

90.709 90.514

83.645 83.441
85.042 84.816

84.026 83.814

83.445 83.175

83.205 82.912
90.244 90.105

90.354 90.150

86.541 86.115

Existing
Elivasi
Rencana
STA +800 2+825 2+850 2+875 2+900 2+925 2+950 2+975 3+000 3+025
CROSS SECTION
1+775 1+875

96 96

94 94

94 94

94.432
94.21
92 92

92.858
92.64
92 92
-8 -6 -4 -2 0 2 4 6 8
90 90
-8 -6 -4 -2 0 2 4 6 8

1+850
1+750
96 96
94 94

94 94
92.875
92.67

92 92

94.788
94.59
-8 -6 -4 -2 0 2 4 6 8 92 92
-8 -6 -4 -2 0 2 4 6 8

1+725
1+825

96 96
94 94

94 94
93.096
92.88

92 92

94.696
94.51
-8 -6 -4 -2 0 2 4 6 8 92 92
-8 -6 -4 -2 0 2 4 6 8

1+700 1+800

94 94 94 94
93.839

92 92
93.64

92 92

93.546
93.33
-8 -6 -4 -2 0 2 4 6 8 90 90
-8 -6 -4 -2 0 2 4 6 8
1+975 2+075

96 96 92 92

94 94 90 90

94.871

90.064
94.68

89.86
92 92 88 88
-8 -6 -4 -2 0 2 4 6 8 -8 -6 -4 -2 0 2 4 6 8

1+950
2+050

96 96 92 92

95.916

90 90
95.73

94 94

90.393
90.17
-8 -6 -4 -2 0 2 4 6 8 88 88
-8 -6 -4 -2 0 2 4 6 8

1+925
2+025

96 96

92 92
95.373
95.17

94 94

91.440
91.22
90 90
-8 -6 -4 -2 0 2 4 6 8

-8 -6 -4 -2 0 2 4 6 8

1+900
2+000

96 96
94 94

94 94
94.937

92 92
94.74

93.068
92.86
92 92
-8 -6 -4 -2 0 2 4 6 8 90 90
-8 -6 -4 -2 0 2 4 6 8
2+175 2+275

92 92 88 88

87.303
91.765

87.10
86 86

91.58
90 90

-8 -6 -4 -2 0 2 4 6 8 -8 -6 -4 -2 0 2 4 6 8

2+250
2+150

90 90
92 92

88 88
91.199

89.189
90 90
91.01

89.00
86 86
-8 -6 -4 -2 0 2 4 6 8
-8 -6 -4 -2 0 2 4 6 8

2+125 2+225
92 92
92 92

90 90
90 90
90.269
90.05

90.590
90.39
88 88
88 88
-8 -6 -4 -2 0 2 4 6 8
-8 -6 -4 -2 0 2 4 6 8

2+100
2+200
92 92

92 92
90 90

91.425
89.909

91.23
90 90
89.70

88 88

-8 -6 -4 -2 0 2 4 6 8
-8 -6 -4 -2 0 2 4 6 8
2+375 2+475

84 84

82 82

82 82

82.721

81.313
82.51
80 80

81.11
80 80
-8 -6 -4 -2 0 2 4 6 8 -8 -6 -4 -2 0 2 4 6 8

2+350 2+450

84 83.462 84 82 82

81.502
83.26

81.30
82 82 80 80

-8 -6 -4 -2 0 2 4 6 8 -8 -6 -4 -2 0 2 4 6 8

2+325 2+425

86 86

82 82

84 84

81.835
84.281
84.07

81.63
80 80

82 82
-8 -6 -4 -2 0 2 4 6 8 -8 -6 -4 -2 0 2 4 6 8

2+300 2+400

84 84

86 86

82 82
85.439

82.253
82.05
85.22

84 84

80 80
-8 -6 -4
-2 0 2 4 6 8 -8 -6 -4 -2 0 2 4 6 8
2+675
2+575

82 82
88 88

80 80

87.927
87.75
86 86

80.918
80.71
78 78 -8 -6
-4 -2 0 2 4 6 8
-8 -6
-4 -2 0 2 4 6 8

2+550 2+650

82 82

86 86

80 80
80.673

85.783
80.46

85.59
84 84

78 78
-8 -6 -4 -2 0 2 4 6 8 -8 -6
-4 -2 0 2 4 6 8

2+525 2+625

82 82 84 84

83.328
81.058
80.85

80 80 82 82

83.11
-8 -6 -4 -2 0 2 4 6 8 -8 -6
-4 -2 0 2 4 6 8

2+500 2+600

82 82 82 82
81.220

81.627
81.40
80 80 80 80
81.01

-8 -6 -4 -2 0 2 4 6 8 -8 -6
-4 -2 0 2 4 6 8
2+775 2+875

92 92
90 90

90 90

89.547

90.687
89.34
88 88

90.49
88 88
-8 -6 -4 -2 0 2 4 6 8 -8 -6 -4 -2 0 2 4 6 8

2+750 2+850

92 92

90 90

90 90

90.709
89.342

90.51
89.13

88 88

88 88
-8 -6 -4 -2 0 2 4 6 8 -8 -6 -4 -2 0 2 4 6 8

2+725 2+825

92 92

90 90

90 90

90.354
89.517

90.15
89.31

88 88

88 88
-8 -6 -4 -2 0 2 4 6 8 -8 -6 -4 -2 0 2 4 6 8

2+700 2+800

92 92

90 90

90 90

90.128
89.184
88.99

89.94
88 88

88 88
-8 -6
-4 -2 0 2 4 6 8 -8 -6 -4 -2 0 2 4 6 8
2+960

84 84

83.251
83.05
82 82

-8 -6 -4 -2 0 2 4 6 8

2+950

86 86

84 84
83.645
83.44

82 82
-8 -6 -4 -2 0 2 4 6 8

2+925

86 86
85.042
84.82

84 84

-8 -6 -4 -2 0 2 4 6 8

2+900

90 90

88 88
88.055
87.87

86 86

-8 -6 -4 -2 0 2 4 6 8
DETAIL PEKERJAAN
Dimensi (cm)
Sketsa Panjang
No. Diameter Keterangan
Gambar Perbatang
a b c

1. 0.10 0.125 0.10 0.325 Ø 12 (Polos) Bangku


Tulang
2. 2.40 2.40 Ø 12 (Polos)
Melintang
3. 0.45 0.45 Ø 19 (Polos) Dowel
Pipa PVC 3/4" - 30
45
4. 0.70 0.70 d 16 (Ulir) Tie Bar cm
30

Detail Pembesian Dowel


Skala 1:100

Dowel Ø19 - 30 cm
Tulangan 4 Ø 12

Bangku Ø12-30 cm

Dowel Dipasang per 4 m Dowel Dipasang per 4 m Dowel Dipasang per 4 m


4.00 m 4.00 m

Tie Bar D16 - 75 cm Tie Bar D16 - 75 cm Detail D Tie Bar D16 - 75 cm Tie Bar D16 - 75 cm

Potongan A-A
Skala 1:50

5.00
0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30

0.70

Potongan B-B
Skala 1:30
4.00 4.00

A A

5.00

Tie Bar D16 - 75 cm Tie Bar D16 - 75 cm

Dowel di pasang jarak 4 m Dowel di pasang jarak 4 m

Pipa Pvc 3/4" - 30


Beton f'c 21 Mpa tebal 20 cm
Pipa PVC 3/4" - 30 Dowel Ø 19 - 30 cm
Dowel Ø 19 - 30 cm Joint sealent
0.30

Tulangan 4 Ø 12 Tulangan 4 Ø 12
Bangku Ø12 - 30 cm
Bangku Ø 12 - 30 cm 0.45
0.30

Joint Saelent 0.125 0.05 0.125

0.20
0.10
0,30
0.30

DETAIL D
Skala 1:25

DETAIL C
Skala 1:25
TYPICAL CROSSTION
STA 1+700 - STA 2+960

Lajur lalu Lintas Lajur lalu Lintas

Badan Jalan
2-3 % 2-3 %

2.50 2.50
5.00
Beton Mutu f'c 21 mpa tebal 20 cm

Catatan:
#. Existing Jalan Tanah
#. Rencana Beton f'c 21 Mpa Tebal 20 Cm