FOR 107 METER PERIMETER 27x27METER AREA

NEED TO ORDER 17,440.00


16,180.00 48,540.00 31,100.00 12,440.00 3,000.00 2,000.00
QUNATITY DESCRIPTION PRICE AMOUNT LABOR COST HAULING HAWAN
45 PRECAST POST 4"x5"X8ft 440 19,800.00
4 BARBEB WIRE 25KLS (150METERS) 1860 7,440.00
1 GRAVEL 1400 1,400.00
1 SAND 700 700.00
8 CEMENT 220 1,760.00

50,822.00 32,730.00 13,092.00 3,000.00 2,000.00


QUNATITY DESCRIPTION PRICE AMOUNT LABOR COST HAULING HAWAN
50 PRECAST POST 4"x5"X8ft 440 22,000.00 25,000.00
4 BARBEB WIRE 25KLS (150METERS) 1860 7,440.00
1 GRAVEL 1400 1,400.00
0.5 SAND 700 350.00 642
7 CEMENT 220 1,540.00 6 4.28

600 15400
32000 4 16800
12800 300 800
15750 333.33 22500 4800
100.00 57500 24750
100.00 24750 20250 4800
533.33 500
8FT 600 19,800.00
4x5 6 20,400.00

31,500.00 2.439024 METERS TO 3.658537 METERS


25,050.00 35.66667
22,500.00 2FT EXCAVATION
24,750.00 0.024 VOLUME IN CONCRETE