MATERIAL PROCUREMENT AND CONTROL PROCEDURE
Table of content
2.0 REFERENCES
3.0 RESPONSIBILITY
4.0 PROCEDURE
4.1 Planning
4.2 Receiving Inspection
1.0 SCOPE
This procedure pertains to the material procurement and control quality management
either material supplied by the Client, procured by SHROMB GEOTECHNICAL LTD or
furnished by Subcontractors for incorporation in a specific project.
This procedure establishes the minimum quality control criteria to be applied to the
management of site materials. The Project Manager may extend the outlined here
below quality control activities in accordance with the specific needs and contractual
obligations.
2.0 REFERENCES
3.0 RESPONSIBILITY
3.1 The Project Manager or Construction Manager shall be responsible for the
implementation of this procedure.
3.2 The Procurement Coordinator shall be responsible for planning the materials
delivery to the site.
3.3 The Material Coordinator shall be responsible for coordinating all material
management activities on site and for issuing material inspection reports,
maintenance/preservation reports, non-conformity reports, as applicable, and
for updating of the materials, inventory system.
MATERIAL PROCUREMENT AND CONTROL PROCEDURE
3.4 The Material Controllers shall be responsible for carrying out quantity and
quality inspection of the materials received on site.
3.6 The Discipline Engineer(s) (or Field Engineer) shall be responsible for updating
the A.F.C. drawings with as-built information and, when required, shall assist
material controllers in the materials inspection activities.
4.0 PROCEDURE
4.1 Planning
On the basis of the project materials delivery plan to the site, receiving
inspection details shall be planned in advance by the Material Coordinator.
All project materials and equipment received on site, whether provided by the
Client, procured by the company or furnished by Subcontractors, shall be
subject to quantity and quality inspection.
Materials shall also be checked for their identification and marking against the
relevant supporting documentation: packing lists, material certificates, etc.
MATERIAL PROCUREMENT AND CONTROL PROCEDURE
At the same time, a quality check shall be carried out on the materials regarding
compliance to the respective Release Notes and availability of the required
certification.
All materials (and equipment) found acceptable shall be logged into the
project materials inventory system, adequately stored and made available
for issue to production.
The disposition shall be agreed between the involved project function (i.e.
Procurement, Engineering, Planning, Q.C.), and approved by the P.M.
Once the approved disposition has been implemented the materials shall
be reinspected and if found acceptable, logged into the project materials
inventory system.