Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Male' Water & Sewerage Company Pvt. Ltd.

Internal Projects Department

Project: Erection of Overhead Prefabricated Structure at MWSC Site, Hull Consultant: [Name]
Client: Male' Water and Sewerage Company Contractor: Hongkong Winfly Engineering Company Limited

MATERIAL APPROVAL SUBMITTAL

I Date: f 09/06/ 2024 Mas No: I

Proposed Material: SAMHWA SPIROLLTAN YELLOW and SPIPOXY FD PRIMER GRAY


Material to be Used: SAMHWA SPIROLLTAN YELLOW and SPIPOXY FD PRIMER GRAY

Specified Manufacturers: Origin Supplier Proposed Manufacturer Origin Supplier


SAMHWA KOREA MAZIYA

Attachments: ITick as appropriate]


nCatalogue nSamples riTest Certificate
WE CONFIRM THAT MATERIALS SUBMITTED HEREWITH HAVE BEEN REVIIEWED AND ARE IN STRICT CONFORMANCE WITH THE CONTRACT
DRAWINGS AND SPECIFICATIONS EXCEPT OTHERWISE STATED
Contractor Representative Signature: Received By: Date & Time:
a

Resident Engineer to Fill


Approved Approved as Noted Rejected
Remarks

Distribution Issued By: (Resident Engineer )


Original Copy Abdulla Saaid, ACE, IP
Resident Engineer: Signature: Date: 13.06.24
Contractor: Time:

Received by the Contractors Representative Issued By: [Resident Engineer)


Name: [Name] Signature: Date:
Time: ITimel

- -
MWSC C1 F-22 RevOO
Page 1 of 1 Effective Date: 01/05/23

You might also like