V TEÓRICO
f (m) H (m) (m3) V + DESP (m3) V DÍA (m3) V REAL (m3)
1.3 2.26 2.44 VALE 3 42.64
1.3 2.26 2.44 VALE 4 25.45
1.2 1.92 2.08 6.95 8 VALE 5 7.65
0.95 1.62 1.74 VALE 6 9.30
1.54 2.62 2.83 VALE 2 ESTR 12.22
0.79 1.34 1.44 VALE 3 ESTR 8.12
1.33 2.26 2.44 VALE 5 ESTR 30.40
1.2 1.92 2.08 10.53 11
1.30 2.26 2.44
1.30 2.39 2.58 5.02 5.00
1.30 2.26 2.44
1.30 2.26 2.44 4.87 6.00
1.3 2.26 2.44
1.3 2.26 2.44
1.3 2.26 2.44 7.3 9
1.3 2.12 2.55
1.3 2.26 2.71
1.3 2.26 2.71 7.96 8.00
1.4 2.62 3.14 19.00
1.35 3.44 4.12 7.26 7.50
1.2 3.05 3.66 12.50
1.2 1.92 2.31 5.97 6.00
1.2 7.46 8.96
1.2 2.71 3.26 12.21 12.5
1.3 2.26 2.71
1.6 4.12 4.95 7.65 8
1.3 1.59 1.91
1.2 1.92 2.31
1.2 2.38 2.85
1.3 1.86 2.23 9.30 10
1.6 2.12 2.55
1.6 2.12 2.55
1.75 1.98 2.38
1.65 1.87 2.24
1.85 2.09 2.51 12.22
1.7 1.7 2.26 2.71
1.2 1.9 2.15 2.58
1.7 1.7 2.26 2.71 7.99
1.3 1.7 2.26 2.71
1.3 1.7 2.26 2.71
1.3 1.7 2.26 2.71
1.3 1.7 2.26 2.71
1.3 1.7 2.26 2.71 13.54
1.1 1.8 1.71 2.05 16.86
1.2 1.8 2.04 2.44
1.3 4.8 6.37 7.65
1.2 1.6 1.81 2.17
1.3 1.6 2.12 2.55
1.3 1.8 2.39 2.87 2.87
TENOR: 41.3
EXCAVACION SOLADO CONCRETO ACERO OBRA VACIADOS
EJECUTADO EJECUTADOS FALTANTES FECHA V TEÓRICO
TIPO A B AREA L m3 EJECUTADO FALTANTE A L m2 EJECUTADO FALTANTE A B AREA L m3 (m3) FALTANTE Kg EJECUTADO FALTANTE VIGAS L (m) AREA (m) (m3) V + DESP (m3) V DÍA (m3) V REAL (m3)
VF A(3-13) 0.50 0.80 0.40 70.26 28.10 29.34 -1.24 0.50 70.26 35.13 26.23 8.91 0.50 0.60 0.30 70.26 21.08 33.55 -12.47 2901.738 1866.76 1034.978 -59% 159% (3-4)(D´-C), (B-C) 35.34 0.30 10.60 11.45
VF B(3-16) 0.50 0.80 0.40 82.00 32.80 18.38 14.42 0.50 82.00 41.00 19.50 21.50 0.50 0.60 0.30 82.00 24.60 11.27 13.33 3386.6 1546.685 1839.915 54% 46% D´(3-5), D(3-4), VESC 15.95 0.30 4.78 5.17 17
VF C(1-16) 0.50 0.80 0.40 94.68 37.87 21.12 16.75 0.50 94.68 47.34 22.95 24.39 0.50 0.60 0.30 94.68 28.40 11.33 17.08 3910.284 1530.165 2380.119 60% 40% 16.62
VF D(1-11) 0.50 0.80 0.40 94.10 37.64 21.16 16.48 0.50 94.10 47.05 23.00 24.05 0.50 0.60 0.30 94.10 28.23 11.31 16.92 3886.33 1552.88 2333.45 40% 60% 7-May 4(D-B), C(4-5) 4.50 0.30 1.35 1.46
11
VF 1(C-D) 0.50 0.80 0.40 9.60 3.84 3.84 0.50 9.60 4.80 4.80 0.50 0.60 0.30 9.60 2.88 2.88 396.48 396.48 0% 100% (4-3)(B-A), 3-4(4-A´) 30.55 0.30 9.17 9.90 11.36
VF 2(C-D) 0.50 0.80 0.40 9.00 3.60 3.60 0.50 9.00 4.50 4.50 0.50 0.60 0.30 9.00 2.70 2.70 371.7 371.7 0% 100% 5(DC, CB, BA) 11.65 0.30 3.49 3.77
9-May
VF 3 a 11(C-D) 0.50 0.80 0.40 81.00 32.40 32.30 0.10 0.50 81.00 40.50 40.38 0.13 0.50 0.60 0.30 81.00 24.30 16.13 8.18 3345.3 2215.745 1129.555 66% 34% C(4-5)(5-6), B(4-5)(5-6) 11.20 0.30 3.36 3.63 7.40
VF 12(C-D) 0.50 0.80 0.40 10.90 4.36 4.36 0.50 10.90 5.45 5.45 0.50 0.60 0.30 10.90 3.27 3.27 450.17 450.17 0% 100% A(4-5), A´(4-5) 15 0.30 4.50 4.86
13-May 11
VF 14(C-D) 0.50 0.80 0.40 9.00 3.60 3.60 0.50 9.00 4.50 4.50 0.50 0.60 0.30 9.00 2.70 2.70 371.7 371.7 0% 100% 5(AB), 5(BC) 14.7 0.30 4.41 4.76 9.62
VF 15(C-D) 0.50 0.80 0.40 6.94 2.78 2.78 0.50 6.94 3.47 3.47 0.50 0.60 0.30 6.94 2.08 2.08 286.622 286.622 0% 100% D´(4-5), D(4-5), ABCA´(5-6) 46.5 0.30 13.95 15.07
15-May 21
VF 3 a 12(C-B) 0.50 0.80 0.40 70.00 28.00 25.08 2.92 0.50 70.00 35.00 34.85 0.15 0.50 0.60 0.30 70.00 21.00 12.48 8.52 2891 1720.145 1170.855 59% 41% 6(A´C) 19 0.30 5.70 6.16 21.22
VF 14(C-B) 0.50 0.80 0.40 7.60 3.04 3.04 0.50 7.60 3.80 3.80 0.50 0.60 0.30 7.60 2.28 2.28 313.88 313.88 0% 100% D´(5-6), D(5-6), CB(6-7) 27.4 0.30 8.22 8.88
16-May
VF 15(B-C) 0.50 0.80 0.40 4.80 1.92 1.92 0.50 4.80 2.40 2.40 0.50 0.60 0.30 4.80 1.44 1.44 198.24 198.24 0% 100% 6(DC), 7(DC)(CB) 22.85 0.30 6.86 7.40 16.28 17
VF 16(B-C) 0.50 0.80 0.40 4.55 1.82 1.82 0.50 4.55 2.28 2.28 0.50 0.60 0.30 4.55 1.37 1.37 187.915 187.915 0% 100% B(7-8), A(6-7), D(6-7) 20.3 0.30 6.09 6.58
20-May
VF 3 a 12(A-B) 0.50 0.80 0.40 90.00 36.00 39.38 -3.38 0.50 90.00 45.00 48.22 -3.22 0.50 0.60 0.30 90.00 27.00 24.13 2.87 3717 2919.585 797.415 89% 11% 7(A-B), 7(C-D) 13.4 0.30 4.02 4.34 10.92 10.5
VF 13(A-B) 0.50 0.80 0.40 7.20 2.88 2.88 0.50 7.20 3.60 3.60 0.50 0.60 0.30 7.20 2.16 2.16 297.36 297.36 0% 100% 21-May D(7-8) 3 0.30 0.90 0.97 1 1
VF 3-4-5-6-9(A-A´) 0.50 0.80 0.40 9.25 3.70 2.22 1.48 0.50 9.25 4.63 2.22 2.41 0.50 0.60 0.30 9.25 2.78 2.22 0.55 382.025 297.36 84.665 80% 20% A(7-8), B(7-8) 8.8 0.30 2.64 2.85
22-May
VF 3-4-5-6(D-D´) 0.50 0.80 0.40 7.40 2.96 2.22 0.74 0.50 7.40 3.70 2.22 1.48 0.50 0.60 0.30 7.40 2.22 2.22 0.00 305.62 144.55 161.07 100% 0% 8(A-B) 10.6 0.30 3.18 3.43 6.29 7
VF 7(A-A´) 0.50 0.80 0.40 3.00 1.20 1.20 0.50 3.00 1.50 1.50 0.50 0.60 0.30 3.00 0.90 0.90 123.9 123.9 0% 100% C(7-8), D(7-8) 6.4 0.33 2.11 2.28
VF MURO A´(3-7) 0.50 0.80 0.40 28.00 11.20 11.00 0.20 0.50 28.00 14.00 12.50 1.50 0.50 0.60 0.30 28.00 8.40 8.25 0.15 1156.4 960.225 196.175 98% 2% 23-May 8(C-B), 8(C-D) 9.7 0.33 3.20 3.46 5.74 6
VF MURO A´(9-10) 0.50 0.80 0.40 6.46 2.58 2.58 0.50 6.46 3.23 3.23 0.50 0.60 0.30 6.46 1.94 1.94 266.798 266.798 0% 100% MURO A´(4-5) 8 0.652 5.216 5.63 5.63
VF MURO D´(3-6) 0.50 0.80 0.40 20.50 8.20 8.00 0.20 0.50 20.50 10.25 8.75 1.50 0.50 0.60 0.30 20.50 6.15 6.15 0.00 846.65 826 20.65 100% 0% A(9-11) 9.7 0.3 2.91 3.14
11-Jun
VF MURO D´(8-9) 0.50 0.80 0.40 8.80 3.52 3.52 0.50 8.80 4.40 4.40 0.50 0.60 0.30 8.80 2.64 2.64 363.44 363.44 0% 100% 10(AB) 8 0.3 2.40 2.59 5.73 6.00
VIGA ESCALA D(3-4) 0.50 0.80 0.40 3.50 1.40 1.40 0.00 0.50 3.50 1.75 1.75 0.00 0.50 0.60 0.30 3.50 1.05 1.05 0.00 144.55 144.55 0 100% 0% (8-9)(ABCD) 27.2 0.36 9.79 10.58
20-Jun
VS2 P1 (BC)(9-10)1 0.30 0.60 0.18 7.50 1.35 1.35 0.00 0.30 7.50 2.25 2.25 0.00 0.30 0.60 0.18 7.50 1.35 1.35 309.75 0% 100% 9(AB), 11(AB) 14.9 0.3 4.47 4.83 15.40 16
VS2 P1 (CD)(9-10)1 0.30 0.60 0.18 9.50 1.71 1.71 0.00 0.30 9.50 2.85 2.85 0.00 0.30 0.60 0.18 9.50 1.71 1.71 392.35 0% 100% 3-Aug MURO 9(A-A´) 4.4 0.42 1.85 2.00 2.00 3
VS2 P1 (DD´)(9-10)1 0.30 0.60 0.18 1.75 0.32 0.32 0.00 0.30 1.75 0.53 0.53 0.00 0.30 0.60 0.18 1.75 0.32 0.32 72.275 0% 100% 6-Aug B(11-12), 12(AB) 11.5 0.42 4.83 5.22 5.22
VS2 P1 (BC)(9-10)2 0.30 0.60 0.18 7.50 1.35 1.35 0.00 0.30 7.50 2.25 2.25 0.00 0.30 0.60 0.18 7.50 1.35 1.35 309.75 0% 100% 14-Aug B(12-15), C(11-15) 28.5 0.33 9.41 10.16
VS2 P1 (CD)(9-10)2 0.30 0.60 0.18 9.50 1.71 1.71 0.00 0.30 9.50 2.85 2.85 0.00 0.30 0.60 0.18 9.50 1.71 1.71 392.35 0% 100% 14(BC), 15(BC), 12(BC) 27.2 0.33 8.98 9.69 19.85
VS2 P1 (DD´)(9-10)2 0.30 0.60 0.18 1.75 0.32 0.32 0.00 0.30 1.75 0.53 0.53 0.00 0.30 0.60 0.18 1.75 0.32 0.32 72.275 0% 100% 17-Aug 13(AB), 16(CD), 14(D) 25.5 0.33 8.42 9.09 14.40
0.18
VS2 P1 (BC)(10-11)1 0.30 0.60 7.50 1.35 1.35 0.00 0.30 7.50 2.25 2.25 0.00 0.30 0.60 0.18 7.50 1.35 1.35 309.75 0% 100% B(15-16), C(15-16), D(14-16) 14.9 0.33 4.92 5.31
Σ 829.54 311.80 227.98 83.82 829.54 396.57 269.87 237.94 140.08 97.86 34260.00 15724.65 14777.05
ACTIVIDAD CANT
20-Apr VALE 1 EXCAVACIÓN 15.28
SOLADO 23.50
ACTIVIDAD CANT
ACERO CONCRETO
M1 0.00 0.00 0
113.4 449.06 7378.12 89.81
4898.88
VALE 5 ACERO 2062.49
MURO (m2) 125.53
27-Jun
0.00 #DIV/0!
16-Jul
0.00 #DIV/0!
19-Jul
0.00 #DIV/0!
24-Jul
P1 3-Jul-19
0.2 0.6 4.05 2.03 10-Jul-19
0.2 0.6 4.13 2.07 30-Jul-19
0.0 0.6 4.13 2.07 17-Aug-19
0.0 0.6 4.13 2.07 21-Aug-19
0.2 0.6 3.89 1.95 24-Aug-19
0.2 0.6 3.89 1.95 2-Sep-19
0.0 0.6 3.69 1.85 6-Sep-19
0.0 0.6 3.77 1.89
0.2 0.6 3.52 1.76
0.2 0.6 3.60 1.80
0.0 0.6 3.40 1.70
0.0 0.6 3.40 1.70
0.2 0.6 3.52 1.76
0.2 0.6 3.52 1.76
0.2 0.6 3.52 1.76
0.2 0.6 3.52 1.76
0.2 0.6 3.52 1.41
0.2 0.6 3.52 1.76
0.2 0.6 3.52 1.76
0.2 0.6 3.52 1.76
0.2 0.6 3.52 1.76
0.2 0.6 3.52 1.76
0.2 0.6 3.52 1.76
0.2 0.6 3.52 1.76
0.2 0.6 3.52 1.76
45.33 S2
P1 12-Aug-19
0.2 0.6 3.90 1.56 13-Aug-19
0.2 0.6 3.90 1.56
0.2 0.6 3.90 1.56 3-Sep-19
0.2 0.6 3.90 1.56
- 0.6 3.53 1.76
- 0.6 3.53 1.76
- 0.6 3.53 1.41
- 0.6 3.53 1.41
- 0.6 3.17 1.27
- 0.6 3.17 1.27
- 0.6 3.17 1.27
- 0.6 3.17 1.27
- 0.6 2.81 1.12
- 0.6 2.81 1.12
- 0.6 3.17 1.27
- 0.6 3.17 1.27
0.18 0.6 3.40 1.36
0.18 0.6 3.40 1.36
0.18 0.6 3.57 1.43
0.18 0.6 3.57 1.43
0.18 0.6 3.40 1.36
0.18 0.6 3.40 1.36
0.18 0.6 3.21 1.28
0.18 0.6 3.21 1.28
0.18 0.6 3.40 1.36
0.18 0.6 3.40 1.36
0.18 0.6 3.58 1.43
0.18 0.6 3.58 1.43
0.18 0.6 3.40 1.36
0.18 0.6 3.40 1.36
0.18 0.6 3.40 1.36
0.18 0.6 3.40 1.36
0.18 0.6 3.40 1.36
0.18 0.6 3.40 1.36
0.18 0.6 3.40 1.36
0.18 0.6 3.40 1.36
0.18 0.6 3.40 1.36
0.18 0.6 3.40 1.36
52.50 P1
CANTIDAD
m3
CONCRETO ACERO UN
3.96 VALE 5 21.56 7980
5.47 VALE 6 13.40 4667.25
12.13 VALE 2 ESTR 25.23 9334.5
3.99 VALE 3 ESTR 8.77 3333.75
9.41 9.88575 VALE 5 ESTR 29.78 10668 16 29.85
4.65 VALE 4 ESTR 11.43 5334 8
3.03 VALE 6 ESTR 25.59 9334.5 14
10.71 6 VALE 7 ESTR 17.87 6000.75 9
6.80 4
11.26 6
12.53 7
3.58 2
5.73
11.83
8.77
10.56 5
8.45 5
RESIDENTECM:
1.76 SE DEMOLIÓ Y SE VOLVIO
1.76 1 A VACIAR 6-SEP
1.76 1
8.25
3.18
2.25 2
RESIDENTECM:
SE DEMOLIÓ Y SE VOLVIO
A VACIAR 6-SEP
CUADRO RESUMEN LOSAS
AREA VOL VOL POR VALOR
TENOR AREA VOLUMEN
VACIADA VACIADO VACIAR TOTAL
S2 0.21 0.00 0 0.00 0.00 $ -
S1 0.21 0.00 0 0.00 0.00 $ -
P1 0.21 0.00 719.23 151.04 -151.04 $ -
CBTA 0.21 0.00 719.23 151.04 -151.04 $ -
0.21 0.00 -175 -36.75 36.75 $ -
TOTALES 0.00 1263.46 265.3266 -265.33 $ -
CANTIDADES LOSA P1
ELEM LARGO ANCHO ALTURA ÁREA VOLUMEN ACERO IND.
VP-5 a 14.23 0.40 0.50 5.69 2.846
VP-5 b 10.82 0.40 0.60 4.33 2.597
VP-5 c 3.15 0.40 0.50 1.26 0.630
VP-5A 7.00 0.25 0.40 1.75 0.700
VP-5B 2.67 0.20 0.40 0.53 0.214
VP-6A 44.22 0.25 0.40 11.06 4.422
VP-6 a 48.46 0.40 0.50 19.38 9.692
VP-6 b 19.10 0.50 0.60 9.55 5.730
VP-6 c 2.75 0.45 0.50 1.24 0.619
VP-6B 43.77 0.25 0.40 10.94 4.377
VP-7 a 39.50 0.50 0.50 19.75 9.875
VP-7 b 26.71 0.50 0.60 13.36 8.013
VP-7A 42.77 0.25 0.40 10.69 4.277
VP-8 a 38.50 0.50 0.50 19.25 9.625
VP-8 b 26.70 0.50 0.60 13.35 8.010
VP-A1 9.96 0.30 0.40 2.99 1.195
VP-B 9.60 0.50 0.50 4.80 2.400
VP-C 9.60 0.50 0.50 4.80 2.400
VP-D 9.60 0.50 0.50 4.80 2.400
VP-E 9.60 0.50 0.50 4.80 2.400
VP-F 9.60 0.50 0.50 4.80 2.400
VP-G1 9.60 0.50 0.50 4.80 2.400
VP-G2 4.20 0.30 0.50 1.26 0.630
VP-I 14.20 0.50 0.50 7.10 3.550
VP-J 13.65 0.25 0.40 3.41 1.365
VP-JK 4.26 0.50 0.50 2.13 1.065
VP-L 14.10 0.25 0.40 3.53 1.410
VP-L1 10.35 0.25 0.40 2.59 1.035
VP-M 14.10 0.50 0.50 7.05 3.525
VP-N 10.34 0.25 0.40 2.59 1.034
VP-N1 14.30 0.25 0.40 3.57 1.430
VP-N2 14.30 0.25 0.40 3.58 1.430
VP-N3 14.30 0.25 0.40 3.58 1.430
VP-O 14.19 0.50 0.50 7.10 3.548
VP-O1 3.92 0.30 0.40 1.18 0.470
LOSA 0.10 651.57 65.157
TOTALES 874.13 171.45
S
VALOR VALOR POR HIERRO EN
HIERRO
PAGADO PAGAR KG
$ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - 0.00 $ -
P3-P4 20.93 490 6756.25 P4 540.50 113.51 350 12431.50 1108.02 13539.53 134.44 20295.78
P4-P5 20.93 420 6807.50 P5 544.60 114.37 350 12525.80 1116.43 13642.23 135.30 20449.73
P5-P6 20.93 420 6756.25 P6 540.50 113.51 350 12431.50 1108.02 13539.53 134.44 20295.78
P6-P7 20.93 420 6807.50 P7 544.60 114.37 350 12525.80 1116.43 13642.23 135.30 20449.73
P7-P8 20.93 420 6756.25 P8 540.50 113.51 350 12431.50 1108.02 13539.53 134.44 20295.78
P8-P9 20.93 420 6807.50 P9 544.60 114.37 350 12525.80 1116.43 13642.23 135.30 20449.73
P9-P10 20.93 350 6756.25 P10 540.50 113.51 350 12431.50 1108.02 13539.53 134.44 20295.78
P10-P11 20.93 350 6807.50 P11 544.60 114.37 350 12525.80 1116.43 13642.23 135.30 20449.73
P11-P12 20.93 350 6756.25 P12 540.50 113.51 350 12431.50 1108.02 13539.53 134.44 20295.78
P12-P13 20.93 350 6807.50 P13 544.60 114.37 350 12525.80 1116.43 13642.23 135.30 20449.73
P13-P14 20.93 280 6756.25 P14 540.50 113.51 350 12431.50 1108.02 13539.53 134.44 20295.78
P14-P15 20.93 280 6807.50 P15 544.60 114.37 350 12525.80 1116.43 13642.23 135.30 20449.73
P15-P16 20.93 280 6756.25 P16 540.50 113.51 350 12431.50 1108.02 13539.53 134.44 20295.78
P16-P17 20.93 280 7385.00 P17 590.80 147.70 350 13588.40 1211.14 14799.54 168.63 22184.54
CUARTO
P17 CUBIERTA 9.19 280 1222.50 97.80 24.45 350 2249.40 200.49 2449.89 33.64 3672.39
MAQUINAS
TOTAL 0.0 302.2 96,746.3 7,739.7 1,652.9 178,013.1 15,866.4 193,879.5 1,955.1 290,625.7
TENOR ACERO TOTAL 37.55
D´(3-6) 20.00 497.54 24.9 P4 540.50 113.51 350 12431.50 1108.02 13539.53 113.51 13564.40
A´(3-7) 27.50 729.27 26.5 P5 544.60 114.37 350 12525.80 1116.43 13642.23 114.37 13668.75
3 (A´-D´) 32.70 1905.75 58.3 P6 540.50 113.51 350 12431.50 1108.02 13539.53 113.51 13597.80
4 (A´- D´) 32.70 1703.01 52.1 P7 544.60 114.37 350 12525.80 1116.43 13642.23 114.37 13694.31
5 (A´- D´) 32.70 1586.60 48.5 P8 540.50 113.51 350 12431.50 1108.02 13539.53 113.51 13588.04
6 (A´- D´) 32.70 1516.27 46.4 P9 544.60 114.37 350 12525.80 1116.43 13642.23 114.37 13688.60
7 (A´-D) 30.80 1612.12 52.3 P10 540.50 113.51 350 12431.50 1108.02 13539.53 113.51 13591.87
8 (A-D) 29.00 1920.82 66.2 P11 544.60 114.37 350 12525.80 1116.43 13642.23 114.37 13708.47
P12 540.50 113.51 350 12431.50 1108.02 13539.53 113.51 13539.53
P13 544.60 114.37 350 12525.80 1116.43 13642.23 114.37 13642.23
P14 540.50 113.51 350 12431.50 1108.02 13539.53 113.51 13539.53
P15 544.60 114.37 350 12525.80 1116.43 13642.23 114.37 13642.23
P16 540.50 113.51 350 12431.50 1108.02 13539.53 113.51 13539.53
P17 590.80 147.70 350 13588.40 1211.14 14799.54 147.70 14799.54
CUARTO
97.80 24.45 350 2249.40 200.49 2449.89 24.45 2449.89
MAQUINAS
TOTAL 413.3 0.0 17,063.0 41.3 7,739.7 1,652.9 178,013.1 15,866.4 193,879.5 1,652.9 193,920.8
TENOR ACERO TOTAL 25.055334
S2-S1 280 35417.00 S1 1662.77 382.44 280 29098.48 4343.65 33442.13 382.44 68859.13
S1-P1 280 82914.51 P1 3892.70 895.32 280 68122.25 10168.90 78291.15 895.32 161205.66
P1-CBTA 280 30088.38 P2 1412.60 324.90 280 24720.50 3690.13 28410.63 324.90 58499.01
TOTAL 0.0 0.0 148,419.9 6,968.1 1,602.7 121,941.2 18,202.7 140,143.9 1,602.7 288,563.8
TENOR ACERO TOTAL 41.4122987
TENORES
CONCRETO LOSA 0.23 DESCRIPCION UNIDAD CANTIDAD TENOR/m2
CONCRETO COLUMNAS 0.00 COLUMNAS m3 0.0 0.00
ACERO LOSA (incluye malla) 20.11 LOSAS m3 1,602.7 0.23
ACERO COLUMNAS 21.30 TOTAL 0.23
TENOR TENOR ACERO AREA VOL VOLUMEN X AREA X ACERO ACERO ACERO X
AREA VOLUMEN
CONCRETO LOSAS VACIADA VACIADO VACIAR VACIAR LOSAS PAGADO PAGAR
S1 0.23 17.50 1662.77 382.44 0.00 382.44 1662.77 29098.48 0.00 29098.48
P1 0.23 17.50 3892.70 895.32 0.00 895.32 3892.70 68122.25 0.00 68122.25
P2 0.23 17.50 1412.60 324.90 0.00 324.90 1412.60 24720.50 0.00 24720.50
TOTALES 6,968.1 1,602.7 0.0 0.0 1,602.7 5,555.5 121,941.2 0.0 121,941.2
COLUMNAS
TENOR DE TENOR DE
UBICACIÓN PISO Kg CERO KG MALLA m2 LOSA ACERO MALLA
S1 15866 7106 1023.91 15.50 6.94
2 15559 6395 872.30 17.84 7.33
PLATAFORMA 3 20950 10502 1590.86 13.17 6.60
4 20950 10502 1590.86 13.17 6.60
5 0 0 0.00 0.00 0
6 8853 1069 528.39 16.75 2.02
7 8853 1069 528.39 16.75 2.02
8 8853 1069 528.39 16.75 2.02
9 8853 1069 528.39 16.75 2.02
10 8853 1069 528.39 16.75 2.02
TIPICAS 11 8853 1069 528.39 16.75 2.02
12 8853 1069 528.39 16.75 2.02
13 8853 1069 528.39 16.75 2.02
14 8853 1069 528.39 16.75 2.02
15 8853 1069 528.39 16.75 2.02
16 8853 1069 540.35 16.38 1.98
RESUMEN DE TENORES
TENOR DE TENOR DE
UBICACIÓN KG ACERO KG MALLA m2 LOSA ACERO MALLA
PISO 2 (V1) 15559 6395 872.30 17.84 7.33 25.17
PLATAFORMA
PISO 3 (V2) 20950 9443 1590.86 13.17 5.94 19.10
TIPICAS PISO 6 8853 1069 528.39 16.75 1.60 18.35
TENOR DE TENOR DE
UBICACIÓN PISO Kg CERO KG MALLA m2 LOSA ACERO MALLA
S1 15866 7106 1023.91 15.50 6.94
2 15559 6395 872.30 17.84 7.33
PLATAFORMA 3 20950 10502 1590.86 13.17 6.60
4 20950 10502 1590.86 13.17 6.60
5 0 0 0.00 0.00 0
6 8853 1069 528.39 16.75 2.02
7 8853 1069 528.39 16.75 2.02
8 8853 1069 528.39 16.75 2.02
9 8853 1069 528.39 16.75 2.02
10 8853 1069 528.39 16.75 2.02
TIPICAS 11 8853 1069 528.39 16.75 2.02
12 8853 1069 528.39 16.75 2.02
13 8853 1069 528.39 16.75 2.02
14 8853 1069 528.39 16.75 2.02
15 8853 1069 528.39 16.75 2.02
16 8853 1069 540.35 16.38 1.98
RESUMEN DE TENORES
TENOR DE TENOR DE
UBICACIÓN KG ACERO KG MALLA m2 LOSA ACERO MALLA
PISO 2 (V1) 15559 6395 872.30 17.84 7.33 25.17
PLATAFORMA
PISO 3 (V2) 20950 9443 1590.86 13.17 5.94 19.10
TIPICAS PISO 6 8853 1069 528.39 16.75 1.60 18.35
AREA LOSAS ED 3
TENOR MALLA
LOSA AREA (m2) AREA MALLAS PESO (Kg) (Kg/m2)
S1 1,662.77 276.4 4,343.7
P1 3,892.7 5,293.4 10,168.9
P2 1,412.6 2,070.7 3,690.1
TOTAL 6,968.1 7,640.5 18,202.7 2.61
MALLAS EDIFICIO 3
TOTAL TOTAL
AREA
MALLAS CANT MALLA PESO (kg) MALLAS MALLAS DIF
MALLA
TEORICAS REAL
INFERIOR
D-50 511.0 46.2 527.25 46 -46.17 0
D - 63 522.8 47.2 659.2 47 -47.23 0
D - 106 231.4 20.9 492.2 21 -20.90 0
D - 158 2,085.5 188.4 6,614.3 188 -188.39 0
D - 188 3,348.0 302.4 8,938.2 302 -302.44 0
SUPERIOR
D-50 941.7 85.1 971.6 85 -85.07 0
D - 63 0.0 0.0 0
D - 106 0.0 0.0 0 0 0
D - 158 0.0 0.0 0 0 0
D - 188 0.0 0.0 0 0 0
6,698.8 0
941.7
TOTAL (KG) TENOR (Kg/m2)
TOTAL MALLAS 7,640.5 690 0 18,203 2.61
TOTAL
TOTAL
MALLAS DIFERENCIA PESO (kg)
MALLAS
D-50 131 131.23 1,498.8
D - 63 47 47.23 659.2
D - 106 21 20.90 492.2
D - 158 188 188.39 6,614.3
D - 188 302 302.44 8,938.2
NUMERO DE TRABAJADORES
POR ADMON POR MEDIDA VALOR LIQUIDADO
$0
RECIBI
NUMERO 1
3-Jun-19 15-Jun-19
CONTRATO 12870203
Nit. o C.C. No. 900.532.471.-3
ACUMULADO ANTERIOR
PRESTAMO Y ABONO RETENCIÓN % RETENCIÓN ISS
$0 $0
0.0
VIGAS 480.192 8,067,225.6
VIGAS 85.4 1,434,720.0
SOPORTES
200
SOPANDAS 1,000,000.0
CORTES (0.1) 595.36 714,432.0
CORTES (0.04) 268.4 322,080.0
CORTES (15) 124.44 149,328.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
SUMATORIAS 565.592 988.2 200 0 11,687,786