Professional Documents
Culture Documents
SOAR Report_DXB1841_U900
SOAR Report_DXB1841_U900
SITE DXB1841
Approved Received
……………………….. …………………………..
Table of Contents
1.1 AREA AND SITE OVERVIEW..................................................................................................3
1.2 SITE INFORMATION DATA.....................................................................................................4
1.3 CELL INFORMATION DATA....................................................................................................4
1.4 TEST PROCEDURES...............................................................................................................5
3.1 ACCESSIBILITY...................................................................................................................11
3.2 HANDOVER TEST................................................................................................................13
3.3 THROUGHPUT PERFORMANCE..........................................................................................14
3.3.1 HSUPA & HSDPA Throughput performance – sector 1...........................................14
3.3.2 HSUPA & HSDPA Throughput performance – sector 2...........................................14
3.3.3 HSUPA & HSDPA Throughput performance – Sector 3..........................................14
3.3.4 HSUPA & HSDPA Throughput performance – Sector 4..........................................14
3.4 INITIAL TUNING SUMMARY SHEET......................................................................................16
3.5 OPTIMIZATION COMMENTS................................................................................................16
4 ACCEPTANCE........................................................................................................................17
Introduction
A drive test was performed to verify and validate the new site integration for DXB1841.
The drive was done within the circle area as shown in the map below.
Longitud Infra
Site ID RNC Latitude Area Class Site Type
e type
DUBAI_ZAABEEL FIRST Site Share -
DXB1841 234 55.30703 25.22433
(ZAABEEL FIRST) Palm Tree
Number of Carrier 2 2 2
Radio Design Performance Check Drive Test to be done using UE and Scanner. (MS in
Dedicated Mode). UE is locked on 3G Only.
Coverage and quality 1. Coverage performance of each sector (Best Server
performance check RSCP)
2. Quality performance of each sector(Best Server
EcNo)
Handover Performance Check Handover performance to be verified by driving in
clock wise and anti clock wise around the Site, for all
three sectors. Then perform handover test towards its
surrounding neighbors (at least 3 neighbors)
Acceptance Criteria: If no special note is for a cell, the related CPICH RSCP should
larger than –75dBm within 100m from the Node B.
Acceptance Criteria:
If no special note is for a cell, the related CPICH Ec/Io should larger than –10dB within
Chart- AS Count
Site acceptance performance test should be performed in static mode and in good RF conditions,
3.1 Accessibility
Sector – 1
Sector – 2
Sector – 3
Sector – 4
CSSR (%) / / / /
Acceptance Criteria:
The SHO between the sectors of same site should be successful
The SHO between the sites should be successful.
NA NA NA NA NA NA
Acceptance Criteria:
Using HSDPA bearer, average FTP throughput should not be less
than 3Mbps (Without transmission limitation).
Test method: The data transfer will be from a test FTP server. The file
format should be a txt or data file.
1.
2.
3.
3.
1.
2.
3.
4.
4 Acceptance
Acceptance
Remarks
Signed by (Huawei)
Signed by (du)
Date of acceptance