PEKERJAAN BORRING TEST

Proyek : REKONDUKTORING SUTT 150Kv RASUN Sect 3


Lokasi : T.117
Tanggal : 6/16/2024

Kedalaman (m N1/15 N2/15 N3/15 Nm/45 Keterangan


2 4 6 6 12 spt 16/06/2024
4 5 6 6 12 spt 16/06/2024
6 4 7 10 17 spt 18/06/2024
8 8 11 18 29 spt 18/06/2024
10 11 17 22 39 spt 18/06/2024
12 10 16 19 35 spt 19/06/2024
14 12 20 24 44 spt 19/06/2024
16 35 60/10 60/10 spt 20/06/2024
18 60/11 60/11 spt 20/06/2024
20 60/14 60/14 spt 20/06/2024
PEKERJAAN BORRING TEST

Proyek : REKONDUKTORING SUTT 150Kv RASUN Sect 3


Lokasi : T.119
Tanggal 6/16/2024

Kedalaman (m N1/15 N2/15 N3/15 Nm/45 Keterangan


2 5 5 7 12 spt 16/06/2024
4 5 9 12 21 spt 16/06/2024
6 10 13 16 29 spt 16/06/2024
8 8 9 8 17 spt 18/06/2024
10 7 13 22 35 spt 18/06/2024
12 12 16 24 40 spt 18/06/2024
14 20 23 28 51 spt 19/06/2024
16 23 26 27 53 spt 19/06/2024
18 23 60 60 spt 19/06/2024
20 35 60/10 60/10 spt 20/06/2024
PEKERJAAN BORRING TEST

Proyek : REKONDUKTORING SUTT 150Kv RASUN Sect 3


Lokasi : T.120
Tanggal :

Kedalaman (m N1/15 N2/15 N3/15 Nm/45 Keterangan


2 2 2 3 5 spt 24/06/2024
4 7 8 10 18 spt 24/06/2024
6 5 7 13 20 spt 24/06/2024
8 13 18 23 41 spt 25/06/2024
10 11 16 22 38 spt 25/06/2024
12 16 33 (27/10) 60 spt 25/06/2024
14 22 33 (30/11) 60 spt 25/06/2024
16 19 40 (20/5) 60 spt 25/06/2024
18 0
20 0
PEKERJAAN BORRING TEST

Proyek : REKONDUKTORING SUTT 150Kv RASUN Sect 3


Lokasi : T.118
Tanggal ; 6/24/2024

Kedalaman (m N1/15 N2/15 N3/15 Nm/45 Keterangan


2 2 4 5 9 spt 24/06/2024
4 8 13 11 24 spt 24/06/2024
6 9 8 12 20 spt 24/06/2024
8 11 20 24 44 spt 24/06/2024
10 7 12 13 25 spt 24/06/2024
12 10 11 14 25 spt 24/06/2024
14 7 13 16 29 spt 25/06/2024
16 15 20 26 46 spt 25/06/2024
18 20 27 32 59 spt 25/06/2024
20 30 (60/10) (60/10) spt 25/06/2024
PEKERJAAN BORRING TEST

Proyek : REKONDUKTORING SUTT 150Kv RASUN Sect 3


Lokasi : T.116
Tanggal ; 6/24/2024

Kedalaman (m N1/15 N2/15 N3/15 Nm/45 Keterangan


2 4 5 7 12 spt 28/06/2024
4 5 8 10 18 spt 28/06/2024
6 7 10 12 22 spt 28/06/2024
8 8 16 23 39 spt 29/06/2024
10 11 18 28 46 spt 29/06/2024
12 10 17 25 42 spt 30/06/2024
14 12 18 27 45 spt 30/06/2024
16 7 21 34 55 spt 01/07/2024
18 12 23 30 53 spt 01/07/2024
20 34 60 60 spt 01/07/2024
PEKERJAAN BORRING TEST

Proyek : REKONDUKTORING SUTT 150Kv RASUN Sect 3


Lokasi : T.121
Tanggal ; 6/24/2024

Kedalaman (m N1/15 N2/15 N3/15 Nm/45 Keterangan


2 4 5 6 11 spt 28/06/2024
4 6 8 10 18 spt 28/06/2024
6 4 4 7 11 spt 28/06/2024
8 7 10 12 22 sp 29/06/2024
10 6 9 13 22 sp 29/06/2024
12 5 7 9 16 spt 30/06/2024
14 7 11 16 27 spt 30/06/2024
16 9 14 15 29 spt 01/07/2024
18 12 18 20 38 spt 01/07/2024
20 15 30 30/13 60 spt 01/07/2024
PEKERJAAN BORRING TEST

Proyek : REKONDUKTORING SUTT 150Kv RASUN Sect 3


Lokasi : T.122
Tanggal ; 7/6/2024

Kedalaman (m N1/15 N2/15 N3/15 Nm/45 Keterangan


2 5 5 7 12 spt 06/07/2024
4 8 9 17 26 spt 06/07/2024
6 9 14 15 29 spt 06/07/2024
8 11 14 17 31 spt 06/07/2024
10 14 25 35 60 spt 07/07/2024
12 18 35 25 60 spt 07/07/2024
14 19 60/13 60 spt 07/07/2024
16 0
18 0
20
PEKERJAAN BORRING TEST

Proyek : REKONDUKTORING SUTT 150Kv RASUN Sect 3


Lokasi : T.124
Tanggal ; 7/6/2024

Kedalaman (m N1/15 N2/15 N3/15 Nm/45 Keterangan


2 3 5 8 13 spt 06/07/2024
4 8 10 14 24 spt 06/07/2024
6 12 16 23 39 spt 07/07/2024
8 13 25 29 54 spt 07/07/2024
10 9 12 20 32 spt 07/07/2024
12 15 23 31 54 spt 07/07/2024
14 23 60/13 60 spt 08/07/2024
16 32 60/11 60 spt 08/07/2024
18 25 60/10 60 spt 08/07/2024
20
PEKERJAAN BORRING TEST

Proyek : REKONDUKTORING SUTT 150Kv RASUN Sect 3

Lokasi :

Tanggal :

Kedalaman (m) N1/15 N2/15 N3/15 Nm/45 Tanggal Keterangan

10

12

14

16

18

20