PODOLIG ADRIAN F.

SAN PABLO BUSINESS CENTER


LOT 6 BLOCK 107 BLK MAHARLIKA
BELLAVITA SAN PABLO SAN BARTOLOME SAN PABLO CITY
SAN PABLO CITY LAGUNA TIN 000-101-528-000-VAT
Billing Statement No.: 4314024311292
Meter No.: 122BAC045246
Route Seq.: 4310 05 0002 Print Seq.: 324898 Page 1 of 2

Your electric bill Customer Account Number (CAN) Due Date


Billing Period Bill Date 2083529227 22 Feb 2024
12 Jan 2024 to 11 Feb 2024 11 Feb 2024
Date of Meter Reading Electric Meter Number
11 Feb 2024 122BAC045246 Please Pay
Date of Next Meter Reading Current Reading
11 Mar 2024
Customer Type -
0
Previous Reading
� 53. 66

Residential 0 See the back of bill as you have other unpaid bills with earlier due dates that may cause disconnection.

=
Actual Consumption Bill Computation Summary
Your rate this month 0 kWh Remaining Balance from previous bill 29.59
� 0.00 per kWh (see other bills due for payment under What Remains Unpaid;
See formula in Addtl Bill Information does not include bills under review and installment)
Charges for this billing period 24.07
Please see the back page of your bill for more details about your Generation 0.00
meter reading and consumption. Transmission 0.00
System Loss 0.00
Distribution (Meralco) 21.38
Subsidies 0.00
Your monthly consumption 26.4ºC Government Taxes
Universal Charges
2.69
0.00
Ave. temp this month 1.1 FiT-All (Renewable) 0.00
kWh deg lower than prev.

Total Amount Due � 53.66

kWh - - - - - - - - - - - -

- - - - - - - - - - - -

Your typical consumption


0 kWh 0.0 kWh � 0.78
Ave. monthly Ave. daily Ave. daily
consumption consumption cost this bill
(last 12 this bill period
months) period
Environmental Impact
Be energy efficient. Save and help take care of our environment
0 kWh 0 tCO *
2 0 tree/s**
Electricity Used Equiv. GHG Emissions To Offset Emissions
*Using DOE’s 2015-2017 National Emission Grid Factor of 0.0007122 tCO /kWh 2
Please be informed that MERALCO may conduct a routine maintenance/inspection of our
**Per Arbor Day Foundation, 1 mature tree can absorb 48 pounds (0.0218 tonnes) of CO /year 2 customer metering facilities within your area this quarter.

Payment Instruction
jcbZ:uXjcbZ Please pay at any Meralco Business Center or through any Customer Account No. (CAN) Please Pay
ZlXZsrXZlXZ accredited payment partner before the due date.
cazSXSRcbcP
1wN9wdG2zqX
cS3RuiB2GrX
2083529227 � 53.66
Zs:ZF2HBfER
ucSZsDH1n1P Bfu:equBevZdeFEu;EUJbwBfUw
Payment made after 11 Feb 2024 will be reflected
QR code contains on your next bill.
your CAN. BIR Permit No.: 0305-116-00036-BA/AR dtd: March 21, 2005

16211
Bill Reference No.: 24026229953 Local Application No.: 867821519 Billing Period: 12 Jan 2024 to 11 Feb 2024 Print Seq. 324898 Page 2 of 2

What you've paid


Shows recent payments already applied to this service excluding any overpayment
Continued
Billing Period Posting Date Payment Channels Amount Paid Rate Components Base Price Amount
12 Oct-11 Nov 2023 21 Nov 2023 Meralco Online � 5.64 FiT-All (Renewable) 0.00
12 Sep-11 Oct 2023 21 Nov 2023 Meralco Online � 5.64
Energy Bill Amount
12 Aug-11 Sep 2023 21 Nov 2023 Meralco Online � 5.64
12 Jul-11 Aug 2023 21 Nov 2023 Meralco Online � 5.64 Base VAT
12 Jun-11 Jul 2023 21 Nov 2023 Meralco Online � 5.64 VAT Sales 21.49 2.58
12 May-11 Jun 2023 21 Nov 2023 Meralco Online � 5.64 VAT Zero Rated 0.00
Other bills paid on 21 Nov 2023 amount to � 5.64 Non-VAT 0.00
Total Energy Amount 24.07
What remains unpaid Charges for this billing period � 24.07
Billing Period Due Date Remarks Unpaid Amount
12 Nov-11 Dec 2023 22 Dec 2023 Please pay immediately � 5.64 Additional Bill Information
12 Dec-11 Jan 2024 23 Jan 2024 Please pay immediately � 23.95
Voltage Level Class : Secondary

How your bill was computed Your rate this month (price per kWh) is computed as Total Energy Amount
divided by the Actual Consumption (in kWh)
Service ID Number: 477097410101 Note: The average temperature for the month represents the reading from
the PAG-ASA weather station in Quezon City, Metro Manila.
Contract Holder: PODOLIG ADRIAN F.
Service Address: LOT 6 BLOCK 107 BLK , BELLAVITA SAN PABLO,
SAN BARTOLOME, SAN PAB
Metering Information
Previous Current
Meter Number Reading Reading Multi Registered
122BAC045246 0 0 1 0 kWh
Rate Components Base Price Amount
Generation 0.00% 0.00
Generation Charge (PhP/kWh) 0.00
Power Act Reduction 0.00
Transmission 0.00% 0.00
Transmission Charge(PhP/kWh) 0.00
System Loss 0.00% 0.00
System Loss Charge (PhP/kWh) 0.00
Distribution (Meralco) 88.82% 21.38
Distribution Charge (PhP/kWh) 0.00
METERING CHARGE
Fixed Metering Charge (PhP/mo) 1.00 mo 5.0000 5.00
Metering Charge per kWh 0.00
SUPPLY CHARGE
Fixed Supply Charge (PhP/mo) 1.00 mo 16.3800 16.38
Supply Charge per kWh 0.00
Government Taxes 11.18% 2.69
Local Franchise Tax 21.38 0.5000% 0.11
VALUE ADDED TAX
Generation Charge 0.00
Power Act Reduction 0.00
Transmission Charge 0.00
System Loss Charge 0.00
Distribution Charge 21.38 12.0000% 2.57
Subsidies and Others 0.11 12.0000% 0.01
Universal Charges 0.00% 0.00
Missionary Elec for NPC-SPUG 0.00
Missionary Elec for REDCI 0.00
Environmental Fund 0.00
NPC Stranded Contract Costs 0.00
NPC Stranded Debts 0.00
DU Stranded Contract Costs 0.00
Equalization Taxes & Royalties 0.00
FiT-All (Renewable) 0.00% 0.00

Reminders when paying Automatic Debit Arrangement (ADA)


Authorize your bank to debit the bill amount from your account on the bill's due date and remit the
All payments made via banks, e-wallets, and other authorized payment partners will be applied to payment to Meralco. Visit your bank to enroll in this option. Meralco bill payments are accepted through
your oldest unpaid bill/s under your Meralco account. Please pay on or before the due date to avoid these accredited ADA partners.
any inconvenience.
Asia United Bank Rizal Commercial Banking Corporation (RCBC)
Check payment should be payable to “Meralco” or “Manila Electric Company”. At the back of Banco de Oro (BDO) Robinsons Bank
check, write your Customer Account Number (CAN), Contact Person Name and Contact Number. Chinabank Security Bank
Philippine National Bank Union Bank of the Philippines
Learn about Meralco’s authorized payment partners, energy savings, and safety. Visit our jcbZM7HWha9IPjcbZ
ZlXZbJLcHrxdPZlXZ All disputes which cannot be settled by the distribution utility to the satisfaction of the customer can be
website or any of our social media channels. ccbSSRuySTvxuaaaP
fvZMG78rncSJLTrfP
bDFRbJmSBL;fzJz58
elevated to the Energy Regulatory Commission (ERC). To contact the ERC, you may get in touch with ERC’s
ey0qDiTrsyBQl69U2
ffjSPySe;1pVwABI0 Consumer Affairs Service (CAS) through:
j6VMSKtrRJgz4YGFP
Sc3bZfeSJN;Qjbj9X
Zs:ZO7vnW5BAxqkR8
ucSZnXQFYT4k6uMi0
www.erc.gov.ph consumer@erc.ph 8687-5577 / 8689-5397 to 98
consumer@erc.gov.ph (Office hours, Mon-Fri except holidays)

You might also like