INNOVATING

ENERGY
ARENA’S
INVESTMENT
PLAN
2022
INNOVATING ENERGY - ARENA’S INVESTMENT PLAN 2022

CONTENTS

INVESTING IN AUSTRALIA’S
NET ZERO FUTURE 3

ABOUT ARENA 4

OUR INVESTMENT APPROACH 5


How we make our funding decisions 5
Our funding programs and related funding sources 6

OUR STRATEGIC PRIORITIES 7


Optimise the transition to renewable electricity 8
Commercialise renewable hydrogen 9
Support the transition to low emissions metals 10

BEFORE APPLYING FOR


ARENA FUNDING 13

2
INNOVATING ENERGY - ARENA’S INVESTMENT PLAN 2022

INVESTING IN AUSTRALIA’S
NET ZERO FUTURE
Australia’s energy transition is underway, with consumers,
governments and industry increasingly recognising the value
of renewable energy.

Australia’s electricity system is rapidly of final energy use in Australia. A key You can also read about our:
evolving. Solar photovoltaics (PV) and challenge for industry is the need
> purpose, operating context,
wind are now the cheapest sources for high-temperature heat, with the
key activities and performance
of new electricity supply, and more required technologies still some way
measures for the next four years
Australian consumers and businesses from commercialisation.
in our Corporate Plan.
are installing distributed energy
technologies1. As the penetration of renewable
>  rincipal objectives for the
p
energy increases, the challenges provision of financial assistance,
Clean hydrogen is emerging as a become more complex. including our strategic priorities, in
solution for energy uses that are not
ARENA’s expertise, deep our General Funding Strategy.
well suited to electrification. We are at
the start of what will be a multi-year understanding of the energy sector >  chievements and outcomes to
a
journey to clean hydrogen becoming and willingness to fund innovative date in our latest Annual Report.
commercially viable. While there are and ground-breaking projects
deployments of hydrogen produced means we provide a pathway to
from renewable energy in Australia, commercialisation for many new
further support is needed to realise technologies and businesses that
the opportunities. might otherwise struggle to get off
the ground or be potentially lost to
On the demand-side, fuel switching overseas markets.
in industry and transport has lagged
supply-side progress in shifting Our Investment Plan sets out our
to renewables, with these sectors approach, our strategic priorities
accounting for approximately 80% and how to apply for ARENA funding.

1
GenCost 2021-22 Report, CSIRO, July 2022, p58

3
INNOVATING ENERGY - ARENA’S INVESTMENT PLAN 2022

ABOUT ARENA
The Australian Renewable Energy Our vision is to support the global The impact of our work is significant.
Agency (ARENA) was established by transition to net zero emissions Since 2012, we have been instrumental
the Australian Government in July by accelerating the pace of in building the foundation of the
2012 under the Australian Renewable precommercial innovation, to the renewable energy ecosystem in
Energy Act 2011. benefit of Australian consumers, Australia. In our first ten years,
businesses and workers. To achieve ARENA has invested $1.86 billion in
this vision, our work is focused on 628 renewable energy projects, with
delivering ARENA’s purpose: to support a total project value of $8.05 billion.
improvements in the competitiveness This means that for every dollar of
and supply of renewable energy Commonwealth funding third parties
technologies by providing financial have invested $3.32.
assistance and sharing knowledge,
to accelerate innovation that benefits
all Australians.

FIGURE 1 ARENA AT A GLANCE - FUNDING COMMITMENTS TO PROJECTS 2012-2022

AUSTRALIAN RENEWABLE ENERGY AGENCY


KEY STATISTICS 2012-2022

INVESTED PROJECTS VALUE INVESTMENT LEVERAGE

$1.86B
INVESTMENT BY TECHNOLOGY
628 $8.05B $1:$3.32
GRID STORAGE –
BIOENERGY GEOTHERMAL INTEGRATION HYBRID HYDROGEN OCEAN SOLAR PV SOLAR THERMAL BATTERIES/PHES

$131M $42M $348M $112M $88M $44M $732M $177M $188M


INVESTMENT BY STATE INVESTMENT LEVERAGE ALONG
QLD 65
PROJECTS
THE INNOVATION CHAIN
INVESTED

$259M
NT 8
PROJECTS
VALUE STUDY
$2.02B
INVESTED

$40M $1:$1.71
NSW 251
PROJECTS
VALUE

$82M INVESTED

$871M * R&D
VALUE

$2.62B
$1:$1.64
WA 42
PROJECTS

ACT 71
PROJECTS
INVESTED

$205M INVESTED DEMONSTRATION


VALUE
$71M
$1.88B VALUE

$195M $1:$1.86
VIC 115
PROJECTS

SA 55 TAS 21
PROJECTS PROJECTS

INVESTED
INVESTED INVESTED DEPLOYMENT
$146M $40M $230M
$1:$6.24
30 JUNE 2022

VALUE
VALUE VALUE

$606M $99M $549M


* Includes $567 million contributed to
projects inherited by ARENA in 2012.

The Government made the energy efficiency and electrification Technologies) Regulations 2022 which
Australian Renewable Energy Agency technologies that can reduce were introduced by the previous
Amendment (Powering Australia) Australia’s greenhouse gas emissions. Government in April.
Regulations 2022 in July. The new
The latest regulations replace To stay up to date on ARENA,
regulations expand ARENA’s mandate
the Australian Renewable Energy visit arena.gov.au.
to allow the agency to support
Agency Amendment (Clean Energy

4
INNOVATING ENERGY - ARENA’S INVESTMENT PLAN 2022

OUR INVESTMENT APPROACH


ARENA is committed to achieving maximum impact and value from
the projects we fund.

We invest in projects across the innovation chain, from research through to pre-commercial deployment. Our funding is
focused on finding and demonstrating technology solutions that reduce technical and commercial risks and improve Australia’s
knowledge and expertise.

FIGURE 2 COLLABORATION ACROSS THE INNOVATION CHAIN

RESEARCH DEVELOPMENT DEMONSTRATION DEPLOYMENT MARKET DIFFUSION


ACCUMULATION

EARLY-STAGE PUBLICLY
FUNDING BODIES AND SOURCES

FUNDED RESEARCH

ARENA (INCLUDING BUDGET MEASURES)

CLEAN ENERGY INNOVATION FUND


(CEFC AND ARENA)

CLEAN ENERGY FINANCE


CORPORATION (CEFC)

CLIMATE SOLUTIONS FUND


(CLEAN ENERGY REGULATOR)
POLICY MECHANISMS

GOVERNMENT PROGRAMS (INCLUDING THE POWERING AUSTRALIA PLAN)

RENEWABLE ENERGY TARGET

EE DISCLOSURES & STANDARDS

UNIVERSITIES
DELIVERY PARTNERS

STATE AND TERRITORY PROGRAMS & AGENCIES

CSIRO

COMPANIES - INNOVATORS AND ESTABLISHED INDUSTRY

INDUSTRY BODIES & ASSOCIATIONS (INCLUDING AEMO, AER, AEMC, ESB)

When making funding decisions, we consider:

> Is the project technically or > Is there a pathway to


commercially innovative? commercialisation?
> Will it advance knowledge >  ill the project help unlock
W
in the market? future investment? 5
INNOVATING ENERGY - ARENA’S INVESTMENT PLAN 2022

OUR FUNDING PROGRAMS AND INSTRUMENTS


ARENA’s baseline funding is provided We also actively engage with the form of debt and equity for up to $50
through a number of programs: marketplace, seeking specific projects million. This decision expands the
through targeted funding rounds for types of funding that ARENA is able
>  he Advancing Renewables
T
projects not eligible for funding under to provide beyond grants. We intend
Program (ARP) funds renewable
the ARP. to use these instruments alongside,
energy projects at various
or in addition to, grants to provide the
stages of development and In addition to committing our baseline
most appropriate type of funding to
is continuously open for funding to eligible projects, we will
innovative projects.
applications. administer additional targeted programs
that support the Government’s See ‘Before applying for ARENA
>  esearch support is available
R
Powering Australia plan. funding’ (page 11) for more details.
periodically through specific
We also encourage you to go
research and development In the lead up to the 2021-22 Federal
to arena.gov.au/funding to
programs and strategic research Budget, the Government also
stay informed about funding
initiatives. announced that ARENA will be able
announcements.
to provide financial assistance in the

CLEAN ENERGY INNOVATION FUND


ARENA works collaboratively with the The Innovation Fund is a $200 million More information on the Innovation
Clean Energy Finance Corporation program that provides both debt and Fund is available at: cefc.com.au/
(CEFC) to administer the Clean Energy equity finance for innovative clean innovationfund.
Innovation Fund (Innovation Fund). energy projects and businesses that
support renewables, energy efficiency
and low emission technologies.
Investments from the Innovation
Fund help eligible projects and
businesses get to the next stage of
commercialisation. The Innovation
Fund does not provide grants.

6
INNOVATING ENERGY - ARENA’S INVESTMENT PLAN 2022

OUR STRATEGIC PRIORITIES


Our focus is now on the next >  e will support research,
W targeted programs to support
phase of technology research, development and deployment the Government’s Powering
development, deployment and of technologies that drive the Australia plan.
commercialisation: commercialisation of clean
These priorities reflect an
hydrogen for both domestic and
>  e will support the transition to
W overarching vision to reduce
export applications
an electricity system powered by emissions by growing the share
renewables through investment >  e will support the transition
W of renewables in the electricity
in technologies that enable ultra to low emissions metals focusing mix, electrifying where possible,
low-cost generation, support on the steel and aluminium becoming more flexible about when
flexible demand, improve the value chains we use electricity, and developing
economics of energy storage and solutions for hard-to-abate sectors
>  e will use our expertise in grant
W
optimise large-scale integration of where electrification is expensive or
funding to deliver additional
renewable energy currently not feasible.

FIGURE 3 ARENA’S CORPORATE PLAN

To support the global transition to net zero emissions by accelerating


OUR VISION the pace of pre-commercial innovation, to the
benefit of Australian consumers, businesses and workers

OUR KEY Provide financial assistance for projects that align


ACTIVITIES with our strategic priorities

Optimise the Commercialise Support the Decarbonise


transition to clean hydrogen transition to low land transport2
renewable • S
 upport a viable emissions metals • A
 ccelerate the
electricity clean hydrogen • A
 ccelerate the decarbonisation
• E
 nable ultra low- industry across the transition to a low of urban and
cost generation full value chain emissions steel long-distance
value chain land transport
• Improve the
economics of • A
 ccelerate the
energy storage transition to a low
• Optimise large-scale emissions aluminium
integration value chain
• Support flexible
demand

Deliver additional targeted programs

Maximise the value of ongoing projects through effective project


delivery, knowledge sharing and by supporting collaboration

DELIVERING ON OUR Deliver on our purpose through our capabilities


PURPOSE and cooperation, performance and risk management

7
2
ARENA continues to support innovation in land transport. Focus areas and activities within this strategic
priority will be updated in early 2023.
INNOVATING ENERGY - ARENA’S INVESTMENT PLAN 2022

OPTIMISE THE TRANSITION


TO RENEWABLE ELECTRICITY
Australia’s electricity system is rapidly driving the transition, including increased use transport and heavy industry, as well as the
evolving. Solar and wind are now the of grid-scale batteries. development of an industry for renewable
cheapest sources of new bulk electricity energy export, in particular for hydrogen.
supply, and significant numbers of Australian Demand for renewable energy generated
households and businesses are installing electricity is expected to increase significantly Further technical and commercial innovation,
rooftop solar and other distributed energy as Australia moves towards a net zero as well as market reforms, will be critical to
technologies. Grid-scale innovations are also economy. Key drivers of this demand will ensure the electricity system can transition
be greater electrification of sectors such as efficiently and cost-effectively.

OUR ROLE
ARENA will play an integral role in this >  nable the ultra low-cost renewable
e > improve the economics of energy
next phase of Australia’s electricity generation required for the viability storage to allow for low-cost firming
transition. We can help Australia move of future industries such as clean of electricity supply
towards a lower-cost, largely renewable hydrogen and low emissions metals >  ddress the integration challenges of
a
electricity system, both on and off the > s upport flexible demand to reduce new grid-scale supply and demand to
grid, that is able to meet significantly system balancing costs and help ensure secure and reliable operation
higher domestic and export demand. To to optimise the transition to a at high levels of instantaneous
do so, we will commit funds to support renewable energy-based grid renewables penetration.
innovation that will help to:

OUR FOCUS
Within each of these focus areas, we will > Demonstrate the technical and >  rovide specific technical
P
provide funding to support the following commercial viability of a range improvements, such as faster
high-impact innovations: of novel flexible demand options, ramping and improved support for
including managed charging of inertia and system strength
ENABLE ULTRA LOW-COST
electric vehicles, flexible operation
RENEWABLE GENERATION of hydrogen electrolysers, and other >  upport projects and knowledge
S
> I ncrease solar module efficiency load shifting technologies in industrial, sharing that will inform rule makers,
by considering the four key elements commercial and residential settings regulators and system operators
of solar cell design: materials > Effectively integrate and about the value that storage assets
abundance, low toxicity, stability in orchestrate novel sources of can provide, thereby enhancing the
the field and efficiency. Increased flexible demand and supporting revenue streams and underlying
module efficiency would reduce infrastructure and services, such economics of these technologies.
balance of system (BoS) costs for the as demand management systems, Our past investments in storage
same output, which would further dynamic operating envelopes and
technologies highlight the role ARENA
reduce total installed costs virtual power plants
can play in supporting technologies as
> Support projects and knowledge
>  educe solar PV BoS costs, through
R they progress toward commercialisation.
sharing that will inform the
improved module design, solar farm regulatory framework on flexible OPTIMISE INTEGRATION OF
architecture, the use of automation demand, such as how it can best LARGE-SCALE RENEWABLE ENERGY
to reduce labour costs in the field support two-sided markets. INTO THE ELECTRICITY SYSTEM
and other innovations. We expect to support demonstration
> Provide low-cost, reliable system
Although our focus is on ultra low-cost projects across the commercial, industrial
and residential segments to help make a strength services and lower grid
solar PV, we may consider support for
broader range of flexible demand services connection risks. This can be
other renewable energy technologies
available to the electricity system. achieved through new technical
where they provide a different or
solutions, such as advanced
complementary generation profile at IMPROVE THE ECONOMICS OF inverters, to ensure the stability of
lower cost than current methods. ENERGY STORAGE the grid as traditional generators
SUPPORT FLEXIBLE DEMAND > Deliver electricity storage retire or run less frequently
solutions at a lower cost and
> Demonstrate the potential value of with lower emissions compared to > Inform regulatory reform processes
flexible demand to the electricity alternative dispatchable energy to accelerate investment in new
system, including through the options through pilot projects, generation capacity. For example, by
avoidance of additional network and commercial demonstration and improving grid connection processes
storage build costs deployment projects and reducing transmission constraints.

8
INNOVATING ENERGY - ARENA’S INVESTMENT PLAN 2022

COMMERCIALISE
CLEAN HYDROGEN
Clean hydrogen is emerging as a Global demand for clean hydrogen is While there are deployments of hydrogen
decarbonisation solution for energy uses expected to grow significantly over the produced from renewable energy in
that are not well suited to electrification. decades ahead. Australia is well positioned Australia, support is required to secure a
Hydrogen, and its derivatives such as to meet this opportunity, given our competitive delivered cost and prove the
ammonia, can be combusted to produce heat, abundance of renewable energy resources, technical feasibility and commercial viability
used as a chemical feedstock, stored for long land availability, good export capabilities of hydrogen use cases.
periods and transported long distances. and infrastructure, and strong trading
relationships.

OUR ROLE
We will support industry to find innovative solutions that can help Australia establish a viable clean hydrogen industry and realise our
potential as a significant exporter of clean energy. This will require innovation across the full hydrogen value chain including cheap,
firmed renewable electricity, a step change in electrolyser technology, as well as rapid proving and scaling of hydrogen use cases.

OUR FOCUS
Our long-term aspiration is to scale low- > Prove the technical feasibility and
cost production of renewable hydrogen. commercial viability of hydrogen
We will look at projects that prove the use cases through innovations and
technical feasibility and commercial activities that replace traditional
viability of technologies along the entire fuels with hydrogen. Projects we
hydrogen value chain. We are also open fund should help to increase the
to clean hydrogen sources for projects diversity and volume of hydrogen
downstream from hydrogen production use cases in Australia, such as:
- in storage, compression, transport and
demand use-cases. > industrial deployments -
supporting the transition
Under this investment priority, ARENA of domestic ammonia
will provide funding to support the manufacturing, natural gas uses
following high-impact innovations: and other existing industrial
hydrogen uses, to clean hydrogen
>  educe the cost of hydrogen
R
produced from renewable > transport - demonstrating the
energy through technologies viability of hydrogen trucks and
and commercial innovations that other modes of transport suitable
materially lower electrolyser costs, for conversion to hydrogen fuel
balance of plant (BoP) costs and cells, including technologies that
reduce the cost of capital. This mitigate switching costs
includes projects that help to unlock > r emote area power systems -
the next wave of atscale renewable scaling the deployment of clean
hydrogen production, moving from hydrogen to provide power in
the ~10 MW scale to the ~100 MW remote areas, for example projects
scale, and enabling a reduction of proving the security of energy
electrolyser capital expenditure supply
(CapEx). > e
 xport - developing overseas
>  esearch and development to
R markets, understanding
demonstrate technologies that key supply chain issues and
address technical challenges along validating the scale of potential
the rest of the hydrogen value chain, overseas buyers.
including storage, compression
and transport (including for
hydrogen carriers).

9
INNOVATING ENERGY - ARENA’S INVESTMENT PLAN 2022

SUPPORT THE TRANSITION


TO LOW EMISSIONS METALS
Australia is a major global player in the steel With increasing global demand for low
and aluminium value chains, with the iron emissions materials and end products,
ore and bauxite mining industries forming a Australia faces both a challenge and an
significant part of our economy. These value opportunity to meet that demand. We
chains are, however, emissions intensive. can lower emissions by decarbonising the
steel and aluminium value chains through
technological innovation.

OUR ROLE
We will help Australian industry to reduce > s teel – iron ore mining and The transition to low emissions metals
emissions by investing in innovative processing, iron making and steel is closely linked to our other strategic
and replicable technologies, processes making priorities. It will require the use of clean
and commercial models that have hydrogen in a number of hard-to-abate
the potential to lower emissions. In > aluminium – alumina refining and industrial processes. Low emissions metals
particular, we will fund innovation that aluminium production. will also rely on the integration of low-cost
demonstrates options to lower emissions renewable energy and have the potential
in the following Australian value chains: to provide load flexibility to support the
transition in the electricity system.

OUR FOCUS
We are looking for projects that ACCELERATE THE TRANSITION We are also interested in innovation
evaluate and demonstrate the TO A LOW EMISSIONS ALUMINIUM across different metals value chains and
technical and commercial viability of VALUE CHAIN in the mining and metals processing
technologies, processes and pathways >  ecarbonise alumina refining
D sectors, especially where technologies
that will support low emissions metals. through electrification and fuel may be replicable or applicable to the
We will therefore provide funding to switching to clean hydrogen steel and aluminium value chains.
support the following high-impact through demonstrations and
innovations: scale-ups
ACCELERATE THE TRANSITION >  educe barriers to the use
R
TO A LOW EMISSIONS STEEL of renewable energy in the
VALUE CHAIN aluminium smelting process,
>  valuate and demonstrate the
E including through innovations that
potential emissions reduction enable smelting to be a form of
impact of upgrading Australian industrial load flexibility
iron ore using renewable energy >  emonstrate the use of other
D
and novel low emissions iron technologies to electrify and
and steel making processes and decarbonise aluminium smelting,
technologies using renewable such as inert anodes.
electricity or fuels, including clean
hydrogen
>  educe barriers to the use of
R
renewable energy and clean
hydrogen in Australian iron
and steel production, including
innovative technologies and
commercial models.

10
INNOVATING ENERGY - ARENA’S INVESTMENT PLAN 2022

BEFORE APPLYING
FOR ARENA FUNDING
Our funding is usually provided as a grant. Where a proposal has the
potential for significant commercial success, ARENA funding may
include recoupment rights contingent upon future outcomes. We will
provide further guidance to applicants on which type of funding is
appropriate to your project.

TO FIND OUT MORE ABOUT THE FUNDING OPTIONS AVAILABLE:


Check whether your project aligns with the funding program announcements on our website and review the current
program guidelines at arena.gov.au/funding

Complete the Eligibility and Alignment Tool at arena.gov.au/eligibility-alignment to check whether your project is eligible.

BEFORE APPLYING, APPLICANTS SHOULD:


Develop a plan to demonstrate that your project contributes to one of our strategic priorities

Consider the potential knowledge value of your project, either to fill knowledge gaps or progress innovation in Australia

Assess where your project fits in the innovation chain to see if ARENA is the right place for you to seek funding.

If you’ve worked through these steps, and want to apply for ARENA funding, get in touch via our website arena.gov.au or
reach out to our business development team at proposals@arena.gov.au.

11
Australian Renewable Energy Agency
Postal Address
GPO Box 643
Canberra ACT 2601
Location
2 Phillip Law Street
New Acton ACT 2601
Further information is available
at arena.gov.au

Engage with us

This work is copyright, the copyright being owned


by the Australian Renewable Energy Agency (ARENA).
With the exception of the Commonwealth Coat
of Arms, the logo of ARENA and other third-party
material protected by intellectual property law, this
copyright work is licensed under the Creative Commons
Attribution 3.0 Australia Licence.

Wherever a third party holds copyright in material


presented in this work, the copyright remains with
that party. Their permission may be required to use
the material.

With the exception of the Commonwealth Coat of Arms,


ARENA has made all reasonable efforts to:

> c learly label material where the copyright is owned


by a third party; and

>  nsure that the copyright owner has consented to


e
this material being presented in this work.

Under this licence you are free to copy, communicate and


adapt the work, so long as you attribute the work to the
Australian Renewable Energy Agency and abide by the
other licence terms. A copy of the licence is available at
https://creativecommons.org/licenses/by/3.0/au/.

Requests and enquiries concerning rights


should submitted through ARENA’s website at
www.arena.gov.au.

You might also like