Load Calculation for ABHAY COOL CHAIN

Location:

Bharatpur, Kandi, Murshidabad, 742301

Proprietor:

JHARNA SAHA

1. Cold Storage Size and Structure:

Total Area: 500 square meters

Volume: 1500 cubic meters (assuming an average height of 3 meters)

Number of Chambers: 2

Insulation: Polyurethane Foam (PUF) with 100mm thickness

2. Temperature Requirements:

Desired Internal Temperature: -18°C

External Average Temperature: 30°C (peak summer conditions)

3. Refrigeration Equipment:

Refrigeration System: Centralized refrigeration with multiple compressors

Refrigeration Unit Power Rating: 75 kW (total for the entire facility)

Efficiency (COP): 2.5

4. Lighting:

Type of Lights: LED

Number of Lights: 50

Wattage per Light: 20W

Average Daily Usage: 12 hours/day

5. Other Electrical Equipment:

Fans: 15 fans at 100W each, 24 hours/day

Heaters (for defrosting): 6 kW total, 2 hours/day


Motors (for conveyors): 5 motors at 3 kW each, 8 hours/day

6. Operational Details:

Operating Hours: 24 hours/day

Operating Days: 365 days/year

7. Load Variation:

Peak Load Times: During loading/unloading, typically morning and evening

Seasonal Variation: Higher load during summer due to increased ambient temperature

8. Energy Management Systems:

Energy Saving Devices: Variable Frequency Drives (VFD) on compressors

Renewable Energy Sources: None

9. Safety and Redundancy:

Backup Power System: Diesel Generator

Generator Power Requirement: 100 kVA (for redundancy and safety)

10. Historical Data:

Previous Consumption Data: Assume 200,000 kWh/year based on similar facilities

Calculation of Electrical Load:

Refrigeration Load:

Refrigeration Load (kW)=75 kW 2.5 (COP) = 30 kW

Refrigeration Load (kW)= 2.5 (COP) 75 kW =30 kW

Lighting Load:

Lighting Load (kW)=50 lights × 20 W/light =1 kW

Lighting Load (kW)=50 lights×20 W/light=1 kW

Fan Load: Fan Load (kW)=15 fans × 0.1 KW/fan = 1.5 kW

Fan Load (kW)=15 fans×0.1 kW/fan=1.5 kW


Heater Load: Heater Load (kW) =6 kW

Heater Load (kW)=6 kW

Motor Load:

Motor Load (kW) = 5 motors ×3 kW/motor =15 kW

Motor Load (kW)=5 motors×3 kW/motor=15 kW

Total Load Calculation:

Total Load (kW) =30(refrigeration)+1(lighting)+1.5(fans)+6(heaters)+15(motors)=53.5 kW

Total Load (kW)=30 (refrigeration)+1 (lighting)+1.5 (fans)+6 (heaters)+15 (motors)=53.5 kW

Considering Peak Load and Safety Factor:

Assume a safety factor of 1.2 to cover peak loads and startup currents:

Required Transformer Capacity (kW)=53.5kW×1.2=64.2kW

Required Transformer Capacity (kW)=53.5 kW×1.2=64.2 kW

Rounding up, a 75 kW transformer is suitable for this load, providing additional capacity for future
expansion and safety.

Transformer Specification:

Capacity: 75 kW (approx. 83 kVA assuming a power factor of 0.9)

Voltage Rating: 11 kV/0.433 kV

Cooling Type: ONAN (Oil Natural Air Natural)

Impedance: Standard as per IS 2026

Detailed Breakdown of Load:

Refrigeration System:

Power: 75 kW total

Efficiency: COP of 2.5

Load: 30 Kw
Lighting:

Number of Lights: 50

Power per Light: 20W

Total Load: 1 kW

Fans:

Number of Fans: 15

Power per Fan: 100W

Total Load: 1.5 kW

Heaters:

Power: 6 kW

Total Load: 6 kW

Motors:

Number of Motors: 5

Power per Motor: 3 kW

Total Load: 15 kW