Product Declaration Planning Next Declaration Lots Declared and still to be shipped
Balance C/F 13460.48 Lot No. Lot 15
MTD Dry Conc. Produced 1860.33 Lot 16 %Ta2O5 28.78
Downtimes 3.50
Downtime (Hrs) Descipline Reason
3.5 Shutdown Plant shutdown
ction Day 29
MTD
Actual Var
1070.79 -747.06
30.00 5.00
10.89 -14.11
604.83 29.13
5.66 -0.34
105.53 -29.47
1860.33 -1444.86
0.13 0.03
0.09 0.06
26.16 1.16
MTD
Actual Var
0.46 0.02
0.07 0.01
0.53 0.03
59.06 19.06
.50
ason
hutdown
Stock Management
5 25
5 25
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
26
27
28
29
Daily Prod Profile
155 155 155 155 155 155 155 155 155 155 155 155 155 155 155 155
104.710
95 97.020 95 95 95
Conc. (kgs)
93.160
84.110 82.520
80.060 78.400 79.600
77.490 76.310
72.830 72.89073.300 74.080 74.140
71.010
57.01057.620 57.700
53.410
50 50 50.960 50 50 50 50 50 50 50
48.440
45.870 44.200 43.050
40.490
36.620
19.990
13.340
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Production Day
Planned Targets
Available Planned Cum. Planned Target Feed Target Daily Cum Target
Prod Day Day Date hours Running hrs Running hrs Rate (tph) Tons Daily Tons
1 Sat 1-Feb-20 22 20.9 20.9 2.4 50.0 50.0
2 Sun 2-Feb-20 22 20.9 41.8 2.4 50.0 99.9
3 Mon 3-Feb-20 22 20.9 62.7 6.9 143.2 243.1
4 Tue 4-Feb-20 22 20.9 83.6 6.9 143.2 386.2
5 Wed 5-Feb-20 22 20.9 104.5 6.9 143.2 529.4
6 Thurs 6-Feb-20 22 20.9 125.4 6.9 143.2 672.6
7 Fri 7-Feb-20 14 13.3 138.7 6.9 91.1 763.7
8 Sat 8-Feb-20 22 20.9 159.6 2.4 50.0 813.6
9 Sun 9-Feb-20 22 20.9 180.5 2.4 50.0 863.6
10 Mon 10-Feb-20 22 20.9 201.4 6.9 143.2 1,006.7
11 Tue 11-Feb-20 22 20.9 222.3 6.9 143.2 1,149.9
12 Wed 12-Feb-20 22 20.9 243.2 6.9 143.2 1,293.1
13 Thurs 13-Feb-20 22 20.9 264.1 6.9 143.2 1,436.2
14 Fri 14-Feb-20 14 13.3 277.4 6.9 91.1 1,527.3
15 Sat 15-Feb-20 22 20.9 298.3 2.4 50.0 1,577.3
16 Sun 16-Feb-20 22 20.9 319.2 2.4 50.0 1,627.2
17 Mon 17-Feb-20 22 20.9 340.1 6.9 143.2 1,770.4
18 Tue 18-Feb-20 22 20.9 361.0 6.9 143.2 1,913.6
19 Wed 19-Feb-20 22 20.9 381.9 6.9 143.2 2,056.7
20 Thurs 20-Feb-20 22 20.9 402.8 6.9 143.2 2,199.9
21 Fri 21-Feb-20 14 13.3 416.1 6.9 91.1 2,291.0
22 Sat 22-Feb-20 22 20.9 437.0 2.4 50.0 2,341.0
23 Sun 23-Feb-20 22 20.9 457.9 2.4 50.0 2,390.9
24 Mon 24-Feb-20 22 20.9 478.8 6.9 143.2 2,534.1
25 Tue 25-Feb-20 22 20.9 499.7 6.9 143.2 2,677.2
26 Wed 26-Feb-20 22 20.9 520.6 6.9 143.2 2,820.4
27 Thurs 27-Feb-20 22 20.9 541.5 6.9 143.2 2,963.6
28 Fri 28-Feb-20 14 13.3 554.8 6.9 91.1 3,054.7
29 Sat 29-Feb-20 22 20.9 575.7 2.4 50.0 3,104.6
Total 606 576 576 3,105 3,105
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Mon
Tue
Wed
10 11 12 13 14 15 16 17
Actual Total Spiral Spirals Feed Planned Head Target Target Prod Wt
R/Time MTD R/Time Feed (t) Rate (tph) Grade (ppm) Recovery (%) (kgs) Cum Target
24 24 162.00 6.75 700.0 25% 50 50
23 47 151.20 6.53 1,000.0 27% 50 100
24 71 156.60 6.66 1,000.0 27% 155 255
23 94 78.95 3.46 1,000.0 27% 155 409
22 115 85.10 3.90 1,000.0 27% 155 564
23 139 151.20 6.53 1,000.0 27% 155 718
12 151 81.00 6.57 700.0 25% 95 814
24 174 156.60 6.64 700.0 25% 50 864
22 197 151.20 6.77 1,000.0 27% 50 914
21 217 140.40 6.79 1,000.0 27% 155 1,068
23 240 75.17 3.32 1,000.0 27% 155 1,223
22 262 116 5.26 1,000.0 27% 155 1,378
22 284 140 6.29 1,000.0 27% 155 1,532
15 299 97 6.48 700.0 25% 95 1,628
23 323 157 6.74 700.0 25% 50 1,678
22 345 151 6.74 1,000.0 27% 50 1,728
21 367 146 6.81 1,000.0 27% 155 1,882
21 387 135 6.53 1,000.0 27% 155 2,037
22 409 146 6.53 1,000.0 27% 155 2,191
12 421 10 0.81 1,000.0 27% 155 2,346
24 445 84 3.55 700.0 25% 95 2,441
24 469 162 6.75 700.0 25% 50 2,491
17 486 113 6.57 1,000.0 27% 50 2,541
24 510 157 6.64 1,000.0 27% 155 2,696
23 533 157 6.69 1,000.0 27% 155 2,851
21 554 140 6.77 1,000.0 27% 155 3,005
16 570 97 6.20 1,000.0 27% 155 3,160
15 584 11 0.73 700.0 25% 95 3,255
21 605 16 0.76 700.0 25% 50 3,305
605 3,423 5.66 3,305 3,305
18 19 20 21 22 23 24
113
138
131
142
27
35
71
145
58
90
951
25 26 27 28 29 30 31 32
0.266 30
0.263 36
0.265 35
0.310 44
0.323 9
0.297 10
0.270 19
0.253 37
0.224 13
0.243 22
0.268 255
27
26
27
31
32
30
27
25
22
24
33 34 35 36 37 38 39 40
Radiation Measures
Theoretical YTD
%U %Th Tot(U+Th) Bq/g
Recovery (%) Theoretical YTD Actual
Recovery(%) Recovery(%) VSI (I)
0.58 0.07 0.64 74 17.7 18 16 107
0.52 0.07 0.59 67 25.1 21 15 105
0.46 0.06 0.53 60 16 21 11 106
0.34 0.06 0.40 44 40 40 8 104
0.44 0.06 0.50 57 37 38 9 113
0.64 0.07 0.71 81 33 35 10 107
0.59 0.07 0.66 75 40 40 14 106
0.67 0.06 0.73 85 17 29 16 107
0.44 0.07 0.51 57 15 16 16 108
0.68 0.06 0.74 86 37 37 10 106
0.41 0.07 0.47 53 36 36 11 104
0.42 0.05 0.47 54 37 37 10 103
0.58 0.06 0.64 73 10 10 11 104
0.62 0.09 0.70 79 50 30 11 106
0.57 0.07 0.65 73 32 41 11 104
0.60 0.07 0.67 77 14 14 14 103
0.33 0.07 0.40 43 50 32 10 107
0.33 0.08 0.41 44 24 37 12 106
0.31 0.08 0.38 41 21 21 14 103
0.20 0.06 0.26 27 36 29 26
0.35 0.07 0.42 46 32 34 28 103
0.45 0.06 0.52 58 48 48 10 106
0.41 0.07 0.48 53 31 39 9 102
0.50 0.08 0.57 64 17 24 12 104
0.55 0.06 0.62 71 47 32 12 105
0.47 0.07 0.55 61 23 35 12 108
0.42 0.07 0.50 55 13 18 13 107
0.25 0.08 0.33 34 20 20 67
0.15 0.07 0.22 21 55 37 63
0.46 0.07 0.53 59.06 106
41 42 43 44 45 46 47 48 49
Metal Actual
Flocc Used Metal Content in Content in Tailings
recovery
Younfloc(kg) Senfloc (kgs) (kgs) Cons (g/ton) Feed Concentrate
- 3.00 3.00 18.52 13,770 2,098 15.24 11,340 17.6%
- 3.00 3.00 19.84 15,120 2,052 13.57 11,340 25.0%
- 3.00 3.00 19.16 25,578 1,811 7.08 21,402 16.3%
- 3.00 3.00 38.00 10,000 774 7.74 6,053 39.5%
- 3.00 3.00 35.25 10,780 1,018 9.44 6,808 36.8%
- 3.00 3.00 19.84 24,948 2,481 9.94 16,632 33.3%
- 2.00 2.00 24.69 10,125 1,353 13.37 6,075 40.0%
- 3.00 3.00 19.16 15,138 2,694 17.79 12,528 17.2%
- 3.00 3.00 19.84 19,656 2,428 12.35 16,632 15.4%
- 3.00 3.00 21.37 29,484 2,096 7.11 18,720 36.5%
- 3.00 3.00 39.91 9,020 1,143 12.67 5,763 36.1%
- 3.00 3.00 25.91 13,507 783 5.80 8,490 37.1%
- 3.00 3.00 21.37 14,040 1,454 10.35 12,636 10.0%
- 2.00 2.00 20.58 14,580 1,623 11.13 7,290 50.0%
- 3.00 3.00 19.16 21,402 2,088 9.76 14,616 31.7%
- 3.00 3.00 19.84 15,876 2,031 12.79 13,608 14.3%
- 3.00 3.00 20.58 27,702 1,690 6.10 13,851 50.0%
- 3.00 3.00 22.22 13,050 2,116 16.21 9,900 24.1%
- 3.00 3.00 20.58 14,094 1,867 13.24 11,178 20.7%
- 2.00 2.00 210.44 1,045 352 33.65 665 36.4%
- 3.00 3.00 35.66 9,815 1,624 16.55 6,731 31.4%
- 3.00 3.00 18.52 20,520 1,851 9.02 10,800 47.4%
- 3.00 3.00 26.46 14,742 1,185 8.04 10,206 30.8%
- 3.00 3.00 19.16 14,094 1,983 14.07 11,745 16.7%
- 3.00 3.00 19.16 36,018 2,942 8.17 19,314 46.4%
- 3.00 3.00 21.37 14,508 2,076 14.31 11,232 22.6%
- 3.00 3.00 30.86 15,552 1,512 9.72 13,608 12.5%
- 2.00 2.00 185.19 1,080 639 59.16 864 20.0%
- 3.00 3.00 192.77 1,712 909 53.09 778 54.5%
- 83 446,957 48,672 10.89 310,805 30%
10.89 30.00
50 51 52 53
116 117 118 119
Calende
Start End r Mine Off Working
Production Month 2018 date date days Days days
Jan 1 1-Jan-18 31-Jan-18 31 0 31
Feb 2 1-Feb-18 28-Feb-18 28 1 27
Mar 3 1-Mar-18 31-Mar-18 31 0 31
Apr 4 1-Apr-18 30-Apr-18 30 0 30
May 5 1-May-18 31-May-18 31 0 31
Jun 6 1-Jun-18 30-Jun-18 30 0 30
Jul 7 1-Jul-18 31-Jul-18 31 0 31
Aug 8 1-Aug-18 31-Aug-18 31 2 29
Sep 9 1-Sep-18 30-Sep-18 30 0 30
Oct 10 1-Oct-18 31-Oct-18 31 0 31
Nov 11 1-Nov-18 30-Nov-18 30 0 30
Dec 12 1-Dec-18 31-Dec-18 31 7 24
365 10 355
Planning Basis
Normal Feed Opto
Plant Availability target 87% %
OPU target 83% %
Plant Feed rate 6.00 1 tph
Head Grade (ppm) 1000.0 700 ppm
Recovery 25.00% 25.00% %
Daily Target Conc 215 Kg
Tails Grade
Formuae/Definitions
Plant Availability target (CT-PMT)/CT*100
OPU (CT-All Downtimes)/CT
All Downtimes PMT + Breakdowns
CT Calendar Time
OPU Overla Plant Utilisation
Recovery
Mthly Mthly Mthly Tot Operating
Manned Maint Downtimes hours Headfeed Prod Conc.
hrs hrs hrs tons kgs
744 97 126 618 3,705 3,705
648 96 110 534 3,203 3,203
744 97 126 618 3,705 3,705
720 94 122 598 3,586 3,586
744 97 126 618 3,705 3,705
720 94 122 598 3,586 0
744 97 126 618 3,705 3,705
696 90 118 578 3,466 3,466
720 94 122 598 3,586 3,586
744 97 126 618 3,705 3,705
720 94 122 598 3,586 3,586
576 75 98 478 2,868 2,868
(Based on Availibility)
(Based on Util) 42,406
Ta2O5 Daily Target Daily Target
(lbs) Conc(kg) Ta2O05(Lb)
1,684 120 65.7
1,456 119 65.3
1,684 120 65.7
1,630 120 65.7
1,684 120 65.7
0 0 0.0
1,684 120 65.7
1,575 120 65.7
1,630 120 65.7
1,684 120 65.7
1,630 120 65.7
1,304 120 65.7
1131996 1131996
1253282 1253282
1131996 1131996
1288433 1288433
977431.56 977431.56
1377290 1377290
1145065 1145065
916051.85 916051.85
1183234 1183234
901460.2 901460.2
963629.87 963629.87
932545 932545
Shift Details Front End
SCT Total HF
(Recycl Dry Banked Comp Conc. Tails
SFT e) Conc. Act Wt. Var. Wt. Var (%) (%) (%) %U
3.30 1.82 23.84 22.99 -0.85 22.99 0 0.08 38.83 0.07 0.59
4.09 2.42 25.34 23.63 -1.71 23.62 -0.01 0.09 24.49 0.07 0.58
5.07 1.82 25.61 24.39 -1.22 24.38 -0.01 25.33 0.56
3.20 1.88 31.59 30.48 -1.11 30.48 0 0.12 20.47 0.07 0.53
3.78 2.10 23.20 20.77 -2.43 20.77 0 0.08 27.54 0.08 0.49
4.31 2.31 27.59 26.24 -1.35 26.24 0 31.44 0.54
3.59 2.19 22.12 20.71 -1.41 20.71 0 0.15 24.20 0.11 0.52
4.05 1.67 33.70 32.25 -1.45 32.26 0.01 0.14 20.54 0.14 0.44
3.00 1.62 28.22 27.1 -1.12 27.1 0 0.20 23.13 0.16 0.43
3.73 2.33 20.64 19.13 -1.51 19.14 0.01 0.09 25.99 0.07 0.61
2.91 1.64 16.50 15.48 -1.02 15.48 0 0.14 21.23 0.09 0.30
1.95 1.07 7.10 5.88 -1.22 5.88 0 0.15 10.16 0.07 0.10
2.13 1.33 8.03 6.67 -1.36 6.67 0 0.17 15.29 0.14 0.11
1.61 0.85 9.89 8.76 -1.13 8.76 0 0.08 22.95 0.04 0.48
3.05 1.72 31.71 30.44 -1.26 30.44 0 0.13 28.34 0.06 0.74
3.65 2.20 21.17 20.19 -0.98 20.19 0 29.12 0.63
4.09 1.79 31.87 30.49 -1.38 30.49 0 0.11 26.21 0.06 0.58
3.67 1.51 33.65 33.43 -0.22 33.44 0.01 0.22 33.15 0.16 0.70
0.00 0.00 0.00 0.00 0
1.94 1.50 22.98 22.37 -0.61 22.37 0 0.15 26.55 0.08 0.57
3.01 1.71 30.15 28.59 -1.56 28.59 0 0.10 26.57 0.07 0.61
2.50 1.33 30.44 29 -1.44 29 0 0.07 26.76 0.06 0.66
4.37 2.48 37.10 35.91 -1.19 35.91 0 0.12 30.76 0.09 0.70
4.27 2.68 33.46 32.11 -1.35 32.12 0.01 0.10 25.77 0.09 0.64
2.69 1.82 32.61 31.38 -1.23 31.38 0 27.61 0.68
5.10 2.54 33.53 31.91 -1.62 31.92 0.01 0.13 21.54 0.11 0.57
2.66 1.67 30.99 29.87 -1.12 29.87 0 26.12 0.66
3.20 1.95 23.71 22.97 -0.74 22.98 0.01 0.19 27.43 0.11 0.65
3.59 2.01 30.87 29.73 -1.14 29.73 0 0.21 27.82 0.08 0.69
2.95 1.73 21.57 20.13 -1.44 20.13 0 0.23 31.07 0.21 0.69
3.22 1.94 27.29 25.65 -1.64 25.65 0 0.21 28.03 0.11 0.70
1.97 1.16 14.62 13.41 -1.21 13.41 0 0.09 22.10 0.08 0.35
4.44 2.44 11.25 9.38 -1.87 9.38 0 0.06 20.66 0.04 0.17
2.36 1.34 18.40 17.24 -1.16 17.23 -0.01 0.11 21.57 0.07 0.44
2.53 1.79 18.67 17.53 -1.14 17.54 0.01 0.11 21.50 0.06 0.55
1.88 1.31 11.40 9.43 -1.97 9.41 -0.02 0.13 10.06 0.09 0.28
3.33 1.89 23.21 21.86 -1.35 21.86 0 27.33 0.58
2.89 1.52 21.35 19.89 -1.46 19.89 0 0.10 18.00 0.09 0.49
3.85 2.64 17.03 15.26 -1.77 15.26 0 31.17 0.66
0.00 0.00 0.00 0.00 0
2.86 1.79 32.52 31.34 -1.18 31.34 0 0.10 19.92 0.06 0.46
3.66 1.96 27.84 26.28 -1.56 26.28 0 0.20 36.43 0.09 0.77
3.85 1.77 26.67 25.32 -1.35 25.32 0 0.20 30.55 0.11 0.65
3.97 2.02 27.49 25.76 -1.73 25.76 0 0.12 27.68 0.09 0.62
3.02 1.81 29.02 27.32 -1.70 27.32 0 0.09 21.67 0.08 0.45
2.80 2.04 21.96 20.57 -1.39 20.57 0 0.10 29.62 0.09 0.63
3.70 1.91 28.02 26.53 -1.49 26.53 0 0.11 29.99 0.09 0.61
4.68 2.30 27.77 25.79 -1.98 25.79 0 23.99 0.56
2.98 1.82 25.25 23.8 -1.45 23.8 0 16.24 0.32
3.54 2.10 26.03 24.25 -1.78 24.25 0 0.18 16.49 0.13 0.27
3.48 1.58 26.74 25.25 -1.49 25.25 0 0.20 36.43 0.06 0.40
3.43 2.00 35.02 34.04 -0.98 34.04 0 0.10 27.00 0.09 0.35
3.15 1.84 28.11 26.51 -1.60 26.51 0 0.11 28.98 0.08 0.34
3.97 1.68 20.46 19.05 -1.41 19.06 0.01 0.08 23.76 0.05 0.31
3.89 1.91 28.76 27.8 -0.96 27.79 -0.01 0.07 24.56 0.05 0.31
3.38 1.76 26.20 24.29 -1.91 24.28 -0.01 0.10 18.27 0.09 0.24
5.05 2.13 23.28 21.99 -1.29 21.98 -0.01 0.12 32.76 0.09 0.37
0.00 0.00 0.00 0.00 0
1.95 1.13 7.04 6.32 -0.72 6.33 0.01 0.16 26.43 0.11 0.22
2.79 1.07 8.42 7.02 -1.40 7.02 0 0.06 26.32 0.03 0.17
1.79 1.03 12.21 11.06 -1.15 11.06 0 0.10 28.97 0.07 0.19
3.43 1.72 19.53 18.43 -1.10 18.43 0 0.07 26.90 0.06 0.31
2.62 1.86 25.21 23.92 -1.29 23.91 -0.01 0.18 35.35 0.11 0.54
3.42 1.84 28.49 27.2 -1.29 27.2 0 0.13 21.41 0.05 0.43
4.01 2.53 30.00 27.99 -2.01 27.99 0 0.07 22.10 0.06 0.40
4.61 1.97 29.04 27.33 -1.71 27.31 -0.02 0.18 23.80 0.09 0.53
1.84 0.92 11.23 10.42 -0.81 10.4 -0.02 30.67 0.62
1.40 0.94 10.35 9.38 -0.97 9.39 0.01 25.62 0.10
2.58 1.56 24.40 23.25 -1.15 23.24 -0.01 0.13 26.28 0.09 0.50
3.20 2.47 29.69 28.21 -1.48 28.22 0.01 0.10 21.40 0.09 0.44
2.69 1.84 27.86 26.66 -1.20 26.66 0 0.08 24.99 0.06 0.46
3.40 1.64 22.91 21.44 -1.47 21.45 0.01 31.57 0.59
3.97 2.35 33.38 31.94 -1.44 31.94 0 0.17 31.62 0.12 0.64
4.22 2.33 39.42 38.51 -0.91 38.52 0.01 0.25 24.51 0.13 0.48
3.57 2.18 35.42 34.26 -1.16 34.27 0.01 0.27 28.17 0.12 0.54
1.42 0.95 17.58 16.83 -0.75 16.84 0.01 0.09 27.43 0.07 0.52
3.60 1.82 32.49 31.12 -1.37 31.12 0 0.11 28.11 0.08 0.45
3.36 1.83 27.46 26.19 -1.26 26.19 0 0.11 28.45 0.09 0.45
3.01 1.80 32.04 31.03 -1.01 31.03 0 0.12 27.30 0.11 0.39
0.68 0.38 7.67 7.36 -0.31 7.36 0 0.20 20.39 0.17 0.36
2.75 1.71 20.66 19.31 -1.35 19.32 0.01 30.91 0.52
0.00 0.00 0.00 0.00 0
2.30 1.32 9.32 8.29 -1.03 8.27 -0.02 0.10 39.00 0.08 0.33
2.16 1.38 13.23 11.7 -1.53 11.7 0 24.93 0.17
5.08 2.59 21.95 20.06 -1.89 20.06 0 30.04 0.16
2.24 1.34 11.37 10.18 -1.19 10.18 0 0.14 20.05 0.05 0.13
1.11 0.68 7.09 6.38 -0.71 6.38 0 0.08 24.37 0.05 0.16
ays Flocculant Downtime Hours
D/Time #4
(hrs) Total D/Time #1 D/Time #2 D/Time #3 D/Time #4
0
0
0
0
0.5 Operational
0.33 Zesa
0.25 Maintenance
0
0.25 Zesa
0.5 Maintenance
0.42 Zesa Shutdown
0.25 Zesa
0
2.08 Mechanical Shutdown
0.08 Zesa
0.5 Zesa
0.33 Zesa
0
8 Maintenance
3.5 Maintenance
0.17 Zesa
0
0.42 Zesa Zesa
0
0.17 Zesa
0.5 Operational
1 Mechanical Zesa
2 Mechanical
0
1.33 Operational Zesa Electrical
0
0.84 Shutdown Operational
0.5 Zesa
0.25 Shutdown
0.25 Zesa
1.5 Operational
0.17 Zesa
0.5 Zesa Zesa
1 Electrical Zesa
8 Maintenance
1 Maintenance
0
0.75 Zesa Zesa Zesa
0
0
1.25 Electrical
0
0.33 Zesa
1 Zesa Mechanical Zesa
0.75 Mechanical
0.83 Electrical Zesa
0
1.17 Zesa Zesa
2.17 Mechanical
0.75 Zesa Zesa
0.67 Zesa
0.25 Zesa
8 Maintenance
4.33 Maintenance Mechanical
0
0
0.33 Shutdown
0
0
0
0
0.17 2.92 Mechanical Operational Operational Mechanical
3.83 Mechanical
0
0
0.17 Zesa
0.25 Zesa
0
0.33 Maintenance
0.25 Zesa
2.42 Zesa Mechanical Zesa
0.84 Zesa Zesa
0
0.66 Zesa Operational
5.66 Zesa Electrical Zesa
2 Operational Zesa
8 Maintenance
1.17 Maintenance Zesa
0
0
0
3.5 Shutdown
D/Time #1
Plumbers replacing worn out valve on Scrubber elbow spray water pipiline
Zesa load shedding
Zesa load shedding
Zesa load shedding
Weekly maintenance
Weekly maintenance
Zesa load shedding
Err:509
Plant shutdown
Reasons
D/Time #2
Err:509