Required equipment: ST Link
3. Steps
1. Connect all 5 pins from Mucar to ST Link and plug into USB
2. Open ST Link Utility
3. Click connect and after half second unplug RESET (5) pin
4. Clear option bytes
5. Program flash
6. Done!
After a successful write, the Mucar firmware can be assembled. Next, you need to download the EOBD brand in the
Diagzone PRO application, version V2.00.006 or later, the device will be configured during the verification, it is very
important not to turn off the power of the device during the verification.