2. What are written on the cement bag and what are meaning of them? Initial and final setting time 3. What are written on the re-bar and what are meaning of them? 4. Rectangular column tie, circular column tie, spirally column tie 5. Special and Intermediate beam detailing 6. Corner and side column design methodology 7. Which column is better (uniform size or reduced size) and why? 8. Retaining wall design and rebar detailing 9. Beam design, why minimum rebar is used (reason) 10. Slump test and detail procedure 11. Cylinder test and detail procedure 12. Ductility class 13. Ready Mix concrete (slump value at plant and site) 14. Compressive strength of concrete and required strength 15. SDC 16. Pile design 17. As the new code is more conservative, what should do for buildings designed by previous code?