MRS, 1st BI-ANNUAL-2024 (01.01.2024 to 30.06.

2024) DISTRICT CHAKWAL

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite
4 Carriage of 1000 Nos. bricks 10"x5"x3" (250x125x75 mm) ditto Reduce the rate by 33% in case of
or 1000 Nos. tiles 12"x6"x2" (300x150x50 mm) by truck or carriage of 1000 Nos. tiles size
any other means owned by the contractor :- 12"x6"x1¼" (300 x 150 x 30 mm).
1st chain (1st 30 m) Chain 335.75 30 M 335.75
2nd chain (2nd 30 m) " 61.55 30 M 61.55
3rd to 10th chain (60 to 300 m) " 38.40 30 M 38.40
1000 to 3000 ft. (300 to 900 m) 1000 Ft 377.20 300 M 377.20
1st Km Km 345.90
2nd Km Km 165.75
3rd Km Km 130.85
4th Km
1st mile Mile 556.65 Km 93.85
5th
2ndKm
mile 149.50 Km 87.80
6th Km
3rd mile 137.40 Km 86.40
7th
4th Km
mile 126.75 Km 80.80
8th mile
5th Km 118.15 Km 79.95
9th
6th Km
mile 111.40 Km 75.30
10th Kmand subsequent miles
7th mile 79.45 Km 70.75
11th & subsequent Kms Km 62.00
5 Carriage of 100 cft. (2.83 cu.m) of all material like stone, 16.1 Material trolly to be supplied by the
aggregate, spawl, kankar lime(unslaked), surkhi, etc. or Government and maintained and run
150 cft. (4.25 cu.m) of timber, by means of material trolly. by the contractor.
1st chain (1st 30 m) Chain 335.75 30 M 335.75
2nd chain to 10th chain (2nd 30 m to 300 m) " 61.55 30 M 61.55
1000 to 3000 ft. (300 to 900 m) 1000 Ft. 377.20 300 M 377.20
1st Km Km 283.70
2nd Km Km 220.60
3rd Km Km 123.15
4th mile
1st Km Mile 456.55 Km 98.65
5th
2ndKm
mile 179.40 Km 87.60
6th
3rd Km
mile 155.20 Km 84.30
7th Km Km 71.65
8th Km Km 70.90
9th
6th Km
mile 111.40 Km 66.80
10th Km and subsequent miles
7th mile 79.45 Km 62.75
11th Kms to 200Kms Km 56.80
201 Kms to 250 Kms Km 3.30
251 Kms & susequent Kms Km 2.10
6 Carriage of 5 tons of all material like coal, stone lime 16.1 Material trolly to be supplied by the
(unslaked), etc. B.G. Rail fastening, points and crossing, Government and maintained and run
Bridge girders, pipes, sheets, Rail, M.S. bars, etc. etc. by by the contractor.
means of material trolly.
1st chain (1st 30 m) Chain 335.75 30 M 335.75
2nd chain (2nd 30 m) " 61.55 30 M 61.55
1000 to 3000 ft. (300 to 900 m) 0/00 Ft. 377.20 300 M 377.20

Chap-1 (Carriage) Page 5