Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Assam Power Distribution Company Limited

NAME OF ELECTRICAL SUB-DIVISION / IRCA : NALBARI1


CIN: U40109AS2003SGC007242
GSTIN: 18AABCL1354J1ZJ
ELECTRICITY BILL

Website: www.apdcl.org Centralized Customer Care Number: 1912

Consumer Name: Bibhuti Bhusan Sarma Consumer Number: 065010097711 Bill Amount: 405.0
Address: .,gopal bazar,nalbari,781335 Old Consumer Number: NSC - 100008181 Due Date: 27-Apr-2024
DTR Number: A12V Bill Number:902381305
Pole Number :0 Bill Period: 03-Mar-2024 To 01-Apr-2024
Connected Load in KW: 1.0 Bill Date : 12-Apr-2024
Contact Number : 9085958874 Contracted Demand in KVA: 1.0 Number of Days: 30
Email : Load Security:885.0 Meter Status: RUNNING
Tariff Category: LT II DOMESTIC A Meter Number: AS846608 Billing Status: NORMAL
Supply Voltage Level: LT

065010097711
Meter Reading Details
Reading Type Meter Number MF Previous Reading Previous Export in Current Reading Current Export in Difference Difference Export
in KWh KWh in KWh KWh Reading in KWh in KWh
KWH ( Normal ) AS846608 1.0 737.0 0.0 797.0 0.0 60.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0

Units Consumed PF Penalty/Rebate LT Metering Penalty @ 3% DTR Penalty @ 10% HT Rebate @ 3% Billable Units in KWh
60.0 0.0 60.0
0.0 0.0 0.0
Recorded Demand (in KVA) 0.0 Maximum Demand (in KVA) 0.0 Billing 1.0 Average 85.0
Demand (in Power
KVA) Factor
Power on Hours 0.0 Freeze Amount 0.0 Availability Percentage

FPPPA Details
Slab-1 (Unit | Rate | Charge) Slab-2 (Unit | Rate | Charge) Slab-3 (Unit | Rate | Charge) Slab-4 (Unit | Rate | Charge) Slab-5 (Unit | Rate | Charge)
60.00 | 0.30 | 18.00 0.00 | 0.30 | 0.00 0.00 | 0.30 | 0.00 0.00 | 0.50 | 0.00 0.00 | 1.29 | 0.00

Billing Details
Current Demand Outstanding Amount Adjustment Amount Government Subsidy Solar Rebate Net Bill Amount
Rs. 404.59 Rs. 0.00 Rs. 0.00 Rs. 45.0 0.0 Rs. 405.0
In Words: Rupees Four Hundred Five
Only
PLEASE PAY YOUR BILL ON TIME AND HELP US TO SERVE YOU BETTER Charges Breakup
Details Units Rate Amount
Energy Charge 60.0 5.7 342.00
0.0 7.0 0.00
Energy Consumption (Last Month's Bill)
0.0 7.9 0.00
Total Energy Charge 342.00
250 Energy Charge Re- 0.00
Estimated
Energy Consumed

200 Demand/Fixed Charge 1.0 70.0 69.04


FPPPA Charge 0.30 18.0
150
Electricity Duty 5.0 20.55
Govt. Subsidy 0.75 45.0
100
Meter Rent 0.0 0.0
50 Transformer M D Charge
Overdrawal Penalty 0.0
0
Adjustment Amount 0.0
Month1 Month2 Month3 Month4 Month5 Month6 Charges for dishonoured 0.0
cheque
Months Arrear Principal 0.0
Arrear Surcharge 0.0
Current Surcharge 0.0
Miscl. Arrear 0.0
Rebate if paid before due date 0.0
Payable amount before due date 405.0
Payable amount after due date 405.0

Checked by E&OE: Prepared by: 40011566 Signature with seal

Page 1

You might also like