Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

CONTRACTOR GENERAL CONSULTANT

Name: YUANDA ROYAL CONSORTIUM Transmittal Ref No.: ESTE1-GCC-SUB-000487-R01 NAME: MR. RONALD JAMES MICKELL MAPLE Consortium

Contract No: MM3-CBS-ESTE1 Date of Submission: 18.05.2024


Customer Director: NIL

Contractor's Representative: Mr. Gautam Banerjee

We Submitted; Stage of Submission:


Plans Specifications Seperated via……….. Design
Work Plan & Methodology B.O.Q. Items (to specify)……… Execution
Design Criteria, Studies Report Tests
Calculations Print Other (to specify)……… Agency Details Others
Drawings Samples

SUBJECT: ESTE1 requesting for free space for temporary storage in UGC 07 stations building
Sr. No.

Document Date No. of Copies Document Reference Revision


1 18.05.2024 6 ESTE1-GCC-DOC-000563 R01

These are Transmitted are checked below:


For your Information Resubmission with corrections for Notice of No Objection
First Submission for Notice of No Objection Other (to specify)

ISSUING ENTITY : YUANDA ROYAL


Remarks CONSORTIUM
Submission Name: Mr. Gautam Banerjee
Signature:

Date: 18.05.2024

COPY TO: ACKNOWLEDGEMENT OF RECIEPT:

1. Mr. Praphull Wagh- General Manager (Elect), MMRC

2. Mr. Sandeep Madan- Chief L&E Engineer, MAPLE

3. Mr. Ashutosh Kulkarni- Chief Interface Engineer, MAPLE

4. Mr. NS Shekhawat- DPM (System), MAPLE

You might also like