CONTRACTOR GENERAL CONSULTANT

Name: YUANDA ROYAL CONSORTIUM Transmittal Ref No.: ESTE1-GCC-SUB-000490-R00 NAME: MR. RONALD JAMES MICKELL MAPLE Consortium

Contract No: MM3-CBS-ESTE1 Date of Submission: 18.05.2024


Customer Director: NIL

Contractor's Representative: Mr. Gautam Banerjee

We Submitted; Stage of Submission:


Plans Specifications Seperated via……….. Design
Work Plan & Methodology B.O.Q. Items (to specify)……… Execution
Design Criteria, Studies Report Tests
Calculations Print Other (to specify)……… Agency Details Others
Drawings Samples

ESTE1 requesting for free space from human interference material in UGC 07
SUBJECT:
Sr. No. stations

Document Date No. of Copies Document Reference Revision


1 18.05.2024 6 ESTE1-GCC-DOC-000567 R00

These are Transmitted are checked below:


For your Information Resubmission with corrections for Notice of No Objection
First Submission for Notice of No Objection Other (to specify)

ISSUING ENTITY : YUANDA ROYAL


Remarks CONSORTIUM
Submission Name: Mr. Gautam Banerjee
Signature:

Date: 18.05.2024

COPY TO: ACKNOWLEDGEMENT OF RECIEPT:

1. Mr. Praphull Wagh- General Manager (Elect), MMRC

2. Mr. Sandeep Madan- Chief L&E Engineer, MAPLE

3. Mr. Ashutosh Kulkarni- Chief Interface Engineer, MAPLE

4. Mr. NS Shekhawat- DPM (System), MAPLE