Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

CONTRACTOR GENERAL CONSULTANT

Name: JOINT VENTURE OF CRANEX AND IFE Transmittal Ref No.: LIFL1-GCC-SUB-000331-R00 NAME: Mr. Ronald James Mickel MAPLE Consortium

Contract No: MM3-CBS-LIF-L1 Date of Submission: 13-Jun-24

Customer Director: NIL

Contractor's Representative: Mr. Chaitanya Agrawal

We Submitted; Stage of Submission:


Plans Specifications Seperated via……….. Design
Work Plan & Methodology B.O.Q. Items (to specify)……… Execution
Design Criteria, Studies √ Report Tests
Calculations Print Other (to specify)……… Agency Details √ Others
Drawings Samples CV

SUBMISSION OF 3rd QUARTERLY AUDIT


SUBJECT:
REPORT FOR THE MONTH OF MARCH,APRIL,MAY-2024
Sr. No.
Document Date No. of Copies Document Reference Revision
1 13-Jun-24 1 LIFL1-GCC-DOC-000390-R00 R00

These are Transmitted are checked below:

√ For your Information Resubmission with corrections for Notice of No Objection

First Submission for Notice of No Objection Other (to specify)

Remarks
ISSUING ENTITY : JOINT VENTURE OF CRANEX AND IFE

Name: MR. Chaitanya Agrawal


Signature:

Date: 13-Jun-24

COPY TO: ACKNOWLEDGEMENT OF RECIEPT:

1. Mr. Praphull Wagh- General Manager (Electrical)

2. Mr. Vlad Mitroi, DPM (Systems), MAPLE Consortium

3. Mr. Sandeep Madan (Chief L&E Engineer)

You might also like