Professional Documents
Culture Documents
LIFL1-GCC-DOC-000390-R00
LIFL1-GCC-DOC-000390-R00
Prepared By Approved By
QUARTER 3
CRANEX IFE
Introduction...........................................................................................03
Executive Summary................................................................................06
Audit Findings.......................................................................................07
The sites covered during this audit include Sahar Project Office,
Marol and SEEPZ sites.
The total No. of gaps observed at the respective sites during 3rd
Quarterly External EHS Audit is given below:
Marol
100%
0%
Marol
6
6
0 0 0 0 0
0
3rd Qtr. External EHS Previous Qtr. External EHS
Audit audit
Q2 0
Type of Audit : Quarterly EHS Audit 3 Q3 6
Type of Report : Non Conformance Report
Date of Audit : 20.05.2024
Cleaning needs to be
Lift shaft L2 not cleaned carried out at regular
3 during working and Safety Minor MAROL Lack of supervision Site Incharge interval and material needs 17.06.2024
material kept on it to be kept in an orderly
manner