Engineering Standard

Instrumented Safeguarding
Systems

Schedule L- 2

Controlled Document Ref.: Schedule L- 2 Custodian: TES/4


Originated by: Verified/reviewed by: Approved by: Revision & Date:
TES/41 TES/D TES TEN TEN/1 Rev 03, 9/97
TES/4

SEE/44 SEE/4 SEE Rev.04 June 2001


SES
Reason for Revision-4: Appendix 2 (Manual for Testing of Instrumented Safeguarding Systems),
which is supported by OTS/4 and OFD, is implemented in
Schedule-2.

Page

1 1 GLOSSARY
3

2 2 INTRODUCTION
5

3 3 SCOPE
5

4 4 DESIGN PHILOSOPHY
6

5 5 DESIGN CRITERIA
6

5.1 Safeguarding Hierarchy 6


5.1.1 Emergency Shut Down - ESD. 7
5.1.2 Process Shut Down - PSD 8
5.1.3 Manual Shut down Initiation 8
5.2 Reset / Re-start Philosophy 8
5.3 Emergency Depressurisation 9
5.4 Emergency Shut Down and Depressurising Valves 9
5.4.1 ESD Valves 10
5.4.1.1 Provisions for start-up 10
5.4.1.2 Provisions for Valve Testing 12
5.4.2 PSD Valves 12
5.4.2.1 Provisions for start-up 12

6 6 HARDWARE DESIGN CONSIDERATIONS


13

6.1 Reliability and Availability 13


6.2 Fail-Safe Technology / Failure to Safety Design 14
6.3 Functional Separation and Segregation 14
6.4 Logic Components. 15
6.5 Input Devices and Input Signal Conditioning 15
6.6 Output Devices and Output Signal Conditioning 16
6.7 Maintenance Override Switches - MOS 17
6.8 Implementation 17
6.9 Start-up Overrides 17
6.10 System Cabinet Requirements 18
6.10.1 Power supply 18
6.10.2 Wiring 18
6.10.3 Spare Requirements 19
6.11 System Interfaces 19
6.11.1 MCC 19
6.11.2 DCS 19
L-2
SYRIA
INSTRUMENTED SAFEGUARDING SYSTEMS
Rev 03

6.11.3 Others 20

7 7 SYSTEM TEST FACILITIES


20

7.1 On line test facilities. 20


7.2 Off line test facilities. 20

8 8 OPERATOR INTERFACE
20

8.1 Pre- Shut Down Alarming “Operator Interface” 20


8.2 Measurement Validation and Comparison - MVC. 21
8.3 Manually Operated Devices 21
8.4 Sequence of Event Recording Facilities 21

9 9 SYSTEM FUNCTIONAL DOCUMENTATION


22

9.1 Process and Engineering Flow Scheme- PEFS (P&ID) 22


9.2 Cause and Effect Diagrams - C&E 23
9.3 Alarm and Trip setting list 25
9.4 Narrative Description 25
9.5 Functional Logic Diagram 26
9.6 General 26
9.7 Drawing Format 27
9.8 Symbols Convention 28
9.9 Signal Lines 28
9.10 INPUT function 28
9.11 OUTPUT function 28
9.12 Schematic Logic Diagrams 28

10 10 TRAINING
29

11 11 FACTORY ACCEPTANCE TEST (FAT)


29

11.1 General 29
11.2 FAT phase 1 29
11.3 FAT phase 2; System Integration Test (SIT) 29

12 12 APPENDIX 1
31

August 1997