2- INSTRUCTIONS TO BIDDERS
2.1 Correspondences
2.2 Ownership of RFQ/Confidentiality
2.3 Errors and Omissions
2.4 Reliance on Estimates
2.5 Language
2.6 Bid Response Forms
2.7 Basis of Bid
2.8 Acceptance of Bids
2.9 Authorized Signature
2.10 Submission of Bid
2.11 Partnership
2.12 COMPANY's Representative
2.13 Terms and Conditions of RFQ
1 of 6
SYRIAN GAS COMPANY DTGD-HOMS
ARABGAS P/L PROJECT- PHASE I EXHIBIT-A, COMMER. REGUL.
2 – INSTRUCTIONS TO BIDDER
Bidder shall comply with the following Instructions in preparing his bid for the WORK as
described in the RFQ
2.1 CORRESPONDENCES
All questions and/or clarifications concerning the RFQ shall be directed to the:
2 of 6
SYRIAN GAS COMPANY DTGD-HOMS
ARABGAS P/L PROJECT- PHASE I EXHIBIT-A, COMMER. REGUL.
2 – INSTRUCTIONS TO BIDDER
assert that there was any misunderstanding as to the amount or character of the Work
to be performed, and shall not make any claim for damages or for loss of profits or
for extension of time because of a difference between his estimate of the quantities of
the various classes of work scheduled and the quantities of work actually performed .
2.5 LANGUAGE
Unless specifically provided otherwise in the RFQ, all information and data submitted
by Bidder as part of his bid, and any subsequent correspondences between
COMPANY and Bidder shall be in the English language.
Bidder shall retype the Bidder's Letter (Section 4.1) on Bidder's letterhead, and shall
complete the relevant sections and shall sign and date the letter .
All commercial and technical information and data provided by Bidder shall be
entered on or inserted after the forms provided in Section 4.3, 4.4, 4.5, 4.6. All sheets
shall be titled, numbered, dated and signed by Bidder .
Bidder shall provide complete and concise commercial and technical information and
data relating to Bidder's offer to perform the work. Information and data provided on
the various bid Response Forms should be such that COMPANY will obtain a clear
understanding of the commercial and technical nature of Bidder's offer. COMPANY
shall not be obligated to seek clarification from Bidder. In the event COMPANY
discovers items of uncertainty in the Bid, then COMPANY will make its own
presumption on the meaning(s) of such uncertain items(s).
All the technical terms and conditions and technical clarification correspondences as
finally agreed between COMPANY and Bidder will supersede any other contract
terms and conditions quoted by Bidder and will be included in the final agreed
CONTRACT.
3 of 6
SYRIAN GAS COMPANY DTGD-HOMS
ARABGAS P/L PROJECT- PHASE I EXHIBIT-A, COMMER. REGUL.
2 – INSTRUCTIONS TO BIDDER
Note:
Priliminary it is expected that the Bidder will be invited to visit the site for
pipeline rout and facilities data gathering and information on:
six weeks before closing date (if he deems it is necessary), This invitation shall
not be in any way understood as “AWARD OF CONTRACT”. All the cost of
such visit/invtation shall be totally born by Bidder.
Names and functions of persons signing shall also be typed under their signature.
on or before the bid closing date and Time indicated in the Inquiry Letter in three (3)
separate envelopes as follows :
- Envelope A: Original (A-1) and 2 copies (A-2, A-3) of:-
- Bidder Qualifications: List of references,
- Financial status for the last five years,
- Company and Project Organization chart,
- List of similar project in Syria and the Middle
East and the world performed by Bidder in the
last ten (10) years,
- List of available equipment for work execution.
(If the Bidder is Joint Venture, or with
subcontractor(s),same information for all
Partners should be provided.)
- Statement of Acceptance of SGC Standard
Terms and Conditions of Contract and
Invoicing/Payment Conditionsd Bond
- A copy of company’ s occupational
health ,safety
and environmental protection statements
(policies).
4 of 6
SYRIAN GAS COMPANY DTGD-HOMS
ARABGAS P/L PROJECT- PHASE I EXHIBIT-A, COMMER. REGUL.
2 – INSTRUCTIONS TO BIDDER
Envelope B is to be submitted as a bound text with clearly identifiable parts, numbered and
indexed identical to the subdivisions of Section 4.0- Bid Response Forms of this RFQ .
BID ENCLOSED
ARAB GAS PIPELINE PROJECT- PHASE I
REQUEST FOR QUOTATION FILE NO. / 2005
Note: Failure to submit Envelope A (Qualification) with all its content, including statement
of acceptance of Standard Terms and Conditions and Payment Conditions for the
base Bid may result in Bid not being considered.
2.11 PARTNERSHIP
Bids submitted by a Partnership or a Joint Venture must specify the names of the
Partners in the Partnership and the Parties in the Joint Venture together with their
respective shares. Such Bids must be signed by authorized representatives of the
Partnership or Joint Venture. In such instances the CONTRACT and contractual
dealings will be in name of one party only.
COMPANY will be represented by it's own staff, who will take care of the
management and administration of this CONTRACT. COMPANY may be assisted
by staff of Consultant in the administration of this CONTRACT .
5 of 6
SYRIAN GAS COMPANY DTGD-HOMS
ARABGAS P/L PROJECT- PHASE I EXHIBIT-A, COMMER. REGUL.
2 – INSTRUCTIONS TO BIDDER
to change or supplement the basic set forth in the RFQ Documents. If a Bidder does
not comply with all the requirements of the RFQ Documents, the Bid will not be
considered by COMPANY.