pdf-1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

CURRICULUM VITAE

PANKAJ SINGH
Experience – Above 6.5 years
Designation – Engineer structure
Address: Vill- Barso, Bharatpur (Rajasthan)
Mob:- +91-9772267755
E-mail- erpankajbarso@gmail.com

CAREER OBJECTIVE:
• To perform the assigned and responsibility efficiently and effectively.
• To make significant contribution towards the success of the company.
PROFESSIONAL QUALIFICATION

B.Tech Rajasthan Chandravati 66% 2017


Technical group of
University institutions
Kota

WORK EXPERIENCE

1. Organization Lion Engineering Consultants Pvt. Ltd.


Designation & Duration Assistant Bridge Engineer from Sept. 2023 to Till Date.
Name of Project Development of access controlled Six Lane (Expandable to
Eight Lane) Greenfield ‘Ganga Expressway’ [Group-III,
from Km. 289+300 (Village: Ubariya Khurd, Distt: Hardoi)
to Km. 455+000, (Village: Sarso, Distt: Unnao), Design
length 155.700 Km] in the State of Uttar Pradesh on
DBFOT (Toll) basis under PPP”.
Client UPEIDA
Independent Engineer Lion Engineering Consultants Pvt. Ltd.
EPC Contractor Patel Infra Ltd.
Project Cost 6293 Crore
2. Organization GA INFRA PVT LTD. JAIPUR
Designation & Duration Engineer structure From NOV 2022 to august 2023
Name of Project Construction/ rehabilitation of city flood control Drain and
storm water drains in Deficient Area with allied work on
lump-sum turnkey basic in Bharatpur Town.
Client Nagar Nigam Bharatpur
Independent Engineer Yasi Consultant Pvt. Ltd. Project Cost: 400 Crore.
EPC Contractor GA INFRA PVT LTD. JAIPUR
Project Cost 400 Crore.
CFCD ( city flood control development ) box type drain of
14.13mtr width with 2 columns and baby drain in centre
also ,other open drains, precast segments and casting yard
also
3. Organization HG Infra Engineering Ltd., Jaipur.
Designation & Duration Site Engineer - Bridge From Feb 2022 to Till date.
Name of Project Development of 6 Lane section of NH-130CD from KM
249+000 to KM 293+000 under Raipur-Visakhapatnam
economic corridor in the state of Odisha on Hybrid Annuity
Mode.
Client National Highways Authority of India
Independent Engineer S A Infrastructure Consultant Pvt.Ltd.
EPC Contractor HG Infra Engineering Ltd. Jaipur.

Project Cost 1492.11 Crore.


Major Bridge:-Length of Bridge 250.510 mtr and span
31.313 mtr, no’s of span 08 no’s both site c/c Pile
Foundation of 1200 mm dia, Pile length below cut of level
28.500 mtr, Pile Cap Size – 8700*5100*1800 mm , total
no’s of pile cap – 18 nos, Abutment, Pier Pier Cap, and
Abutment Cap, Grade of Concrete M-45, Deck Slab, crash
barrier, Total Nos of Pile in one group – 06 in pier, 11 Nos
in Abutment. Grade of Concrete in Pile and Pile cap – M-
35. Super Structure – PSC Girder.
Major Bridge:- Length of Bridge 332.415 mtr and span
36.935 mtr, no’s of span 09 no’s both site c/c Pile
Foundation of 1200 mm dia, Pile length below cut of level
25.800 mtr, Pile Cap Size – 8700*5100*1800 mm , total
no’s of pile cap – 20 nos, Abutment, Pier Pier Cap, and
Abutment Cap, Grade of Concrete M-45, Deck Slab, crash
barrier, Total Nos of Pile in one group – 06 in pier, 11 Nos
in Abutment. Grade of Concrete in Pile and Pile cap – M-
35.

4. Organization Varindera Constructions LTD


Designation Site Engineer Bridge
Duration From Sept 2018 to Jan 2022.
Name of Project NH- 754k(-)1+155 To 21+000 Of DeogarhNear
Dhandhaniya from Amritsar to Jamnagar 6 Lane
expressway In the State of Rajasthan DRGB (Package-
1)

Client National Highways Authority of India


Independent Engineer S A Infrastructure Consultant Pvt.Ltd
EPC Contractor Varindera Consultant Pvt. Ltd
Project Cost 333.77 Crore.
Minor Bridge:- Length of Bridge 45.245, no’s of span 1
no’s both site c/c No. Pile Cap 04 no’s pile cap size
29.104*8.900*1.8, length of girder 43.745 mtr c/c and no’s
of pile in one group 24 no’s , pile dia 1200 mm , and Pile
depth 33.204 mtr below the cut off level, PSC Girder, Grade
of Concrete in Pile and Pile Cap M-35, Pier and Abutment
and pier Cap Grade of Concrete M-45.
22 No’s Box culvert size 1*3*3, 1*2*2, 1*2.50*2.50 length
35 mtr. RCC structures 08 No’s VUP’s – 70.00 mtr in
length (Skew), width 13.2mtr and inner height 6.320 mtr,
and, 12 No’s PUP’s - 60.00 mtr in length (Skew), 10.20 m
in width, inner bent 4.30mtr and 12 No’s Pipe Culverts
length 75.00 mtr, Precast Box Segments. Etc. Retaining
Walls, Wing Walls, Curtain Walls, Stone Pitching etc.
Major Bridge:- Length of Bridge 312.550 mtr main
carriage way 45.10 mtr, no’s of span 06 no’s both site c/c
No . Pile Cap 7 no’s pile cap size 22.30* 12.790*1.8 mtr for
54.106mtr c/c, length of girder 54.100 mtr c/c and one
group pile 42 no’s, pile dia 1200 mm

5. Organization Simplex Infrastructure Limited


Designation Site Engineer Structure
Duration From July 2017 to September 2018
Name of Project Construction of Road Bed, Embankment in Filling Cutting,
Major and Minor Bridges, Linking of track, S&T and OHE
work from.Kota to Bina Railway Doubling Project in the
state of Uttar Rajasthan.

Client RVNL
Independent Engineer Aarvee Associates Architects Engineers and Consultants Pvt
Ltd
Project cost 1100 Crore.

TECHNICAL SKILLS:
 Operating system –windows 10, 8 & 7
 Ms office- MS Word, MS Excel, MS Power Point Presentation
 Internet ability

PERSONAL SKILLS:
 Dedicated for responsibilities
 Honesty
 Punctual
Anchoring and presentation skill.

ACADEMIC QUALIFICATION:
 Rajasthan Board Ajmer in 2009 with 74% Marks in 10th Standard.
 Rajasthan Board Ajmer in 2011 with 62% Marks in 12th Standard.

JOB RESPONSIBILITIES:

 To observe all kind of activities of juniors – Trainee engineers,supervisor and


foreman‘s given work at site and to take DPR on daily basis.
 Responsible for all type given work of structures work with DPR in
construction as Box culvert, LVUP, SVUP, VUP, Minor Bridge, Major Bridge,
Piling Work, Interchange etc. with wing wall, Retain Wall & Approach Slab &
Crash Barrier.
 Preparation of Bar Bending Schedule according to the drawing for
reinforcement work.
 Checking the survey details & Layout of Structures before excavation of
construction activities.
 Checking the reinforcement detail according to the BBS and placing according
with required cover.
 The submission of RFI client concrete poring checking the reinforcement &
shuttering.
 Submission the DPR (daily progress report) for Structure in charge for
planning for next day target.
 To inform for construction material quantity for stock in advanced.
 To complete as given the target for project.
 Preparation of contractor’s PC work done for billing process.
 COD of structure’s after completion the construction.

PERSONAL DETAILS
Name Pankaj Singh
Father’s Name Mr. Rajan Singh
Date of birth 02 Feb. 1994
Marital Status Married
Permanent Address Vill. & Post- Barso, Distt-Tehsil- Bharatpur (Rajasthan)
321001

I hereby declare that the information furnished above is true.

Date: (Pankaj Singh)

You might also like