NOTES:

1. ALL DIMENSIONS ARE SHOWN IN MILLIMETERS AND

PREVAILING
ELEVATIONS AND COORDINATES IN METERS

WIND
A UNLESS OTHERWISE SPECIFIED.
TRUE NORTH/
PLANT NORTH

18°
2. MONUMENT N. 271687.000 UTM AND
E. 344868.000 UTM CORRESPONDS WITH
8200
LOCAL GRID N. 100.000M AND E. 100.000M.

3. FOR GENERAL NOTES RELATED TO CONCRETE WORKS,


REFER TO DRAWING NO. YA-053102 & YA-053103.
600 1000 1000 1000 1000 1000 1000 1000 600

REFER NOTE-10
= = 4. PLANT GRADE ELEVATION IS 100.000 M IS
CORRESPONDING TO 228.35M PER TOPO SURVEY

25mm THK
DRAWING.

ANCHOR BOLT 5. FOR HPP ELEVATION REFER DRAWING YA-053164.004.


(SEE NOTE-6 & 7) SEE NOTE-8

240
6. ANCHOR BOLT LOCATION, ARRANGEMENT, SIZES AND
12mm THK ISOLATION JOINT FILLED
DETAILS ARE PRELIMINARY AND WILL BE FINALIZED
WITH FILLER & SEALANT (TYP)
TOC BASED ON FINAL VENDOR GA DRAWINGS.
EL 100.275 CONCRETE PAVING (TYP)
7. CONSTRUCTION CONTRACTOR TO VERIFY THE
HPP
ANCHOR BOLT LOCATION NOT TO CLASH WITH
REFER NOTE-5
REINFORCEMENT. ANY CLASHED BETWEEN ANCHOR BOLT
& TIE REINFORCEMENT, TIES SHALL BE SUITABLY
ADJUSTED AT SITE.

8. ALL ABOVE GRADE CONCRETE SHALL BE PAINTED WITH


APCS-1B PER SAES-H-003.
SEE NOTE-9
9. ALL BELOW GRADE CONCRETE SHALL BE PAINTED
BOC
WITH APCS-3 PER SAES-H-101.
3700

3220

EL 99.000
= =

| FDN 10. GROUT SHALL BE NON SHRINK CEMENTITIOUS GROUT.

50mm THK LEAN 50 11. THIS DRAWING TO BE READ IN CONJUNCTION WITH


NORTHING COMPACTED GRADE AS
CONCRETE (TYP) CIVIL, PIPING, ELECTRICAL, MECHANICAL, INSTRUMENT
EASTING (TYP) PER SAES-A-114 AND
REFER NOTE 12 & EQUIPMENT VENDOR DRAWINGS.
GEOTECHNICAL REPORT
REFER NOTE 13 12. COORDINATES ARE UNDER HOLD.

13.IF ANY LOOSE SOIL FINDS AT FOUNDATION ELEVATION


THE SAME SHALL BE EXCAVATED UPTO 2.0M AND
SHALL BE BACKFILLED WITH SELECT FILL AND
A S E C T I O N COMPACTED TO 95% PROCTOR DENSITY.

-
SCALE 1 :25M
SH
240

FORMWORK
LEGEND

| CENTER LINE
| FDN
TOC TOP OF CONCRETE
16-AB 2-M24-150-500-(2)
A ANCHOR BOLT BOC BOTTOM OF CONCRETE
(SEE NOTE-6 & 7)
HPP HIGH POINT OF PAVING

WATER INJECTION PUMP (434-G-0221 A/B/C) THK THICK

FDN FOUNDATION
FOUNDATION PLAN
SCALE 1:25 NOs. NUMBERS

3 NOS REQ'D

REFERENCE DRAWINGS
DWG. CONTROL FOR B.I. 10-02478-0002 YD-052607

PLOT PLAN XA-B13190.001

GENERAL NOTES-CONCRETE WORKS YA-053102.001

LEGEND & ABBREVIATION-CONCRETE WORKS YA-053103.001

ANCHOR BOLT DETAILS AA-036322.001

KEY PLAN

{16 @ 600 C/C {16 @ 200 C/C THIS DRAWING

{16 @ 300 C/C BOTH WAYS

PREVAILING
WIND
PLANT NORTH
TRUE NORTH/

18°
SIDE BARS

{16 @ 300 C/C

{16 @ 200 C/C SIDE BARS

(TOP & BOT)

1200 (TYP)
B B
(TYP)
600
{16 @ 200 C/C

(TOP & BOT)

{16 @ 200 C/C

BOTH WAYS

B S E C T I O N
-
SCALE 1 :25M
SH 0 0.5 1.0 2.0

REINFORCEMENT
METERS

SCALE: 1 : 25M
{16 @ 300 C/C

SIDE BARS
REVISION VALIDATION

THIS REVISION NO. A IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

P L A N 10-02478-0002-001

SCALE 1:25 DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER


(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

REINFORCEMENT PLAN ENGG./DATE

ACX
CERTIFIED BY/DATE CONST. AGENCY/DATE

SPX JAK
OPERATIONS/DATE

SAS
BY/DATE

12/21/23 12/21/23 12/21/23 12/21/23


WATER INJECTION PUMP (434-G-0221 A/B/C)
REV.NO. DATE REVISION DESCRIPTION

A 12/21/23 ISSUED FOR REVIEW

JOB ORDER/EWO NO.


THIS REVISION IS NOT TO BE USED FOR
10-02478-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE

FOUNDATION PLAN, SECTION DET. FDN

WATER INJECTION PUMP G-0221 A/B/C


GOSP

HARMALIYAH SAUDI ARABIA


PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

434 Q YA-053104 001 A