Abstract: The Teesta Barrage Project that has been conceived in the year 1975-76 had a grand plan for the revival of agricultural
economy of six districts of North Bengal- Cooch Behar, Jalpaiguri, Darjeeling, North Dinajpur, South Dinajpur and Malda which did
not have any strong industrial base. The project is still incomplete and there is a very little chance for the completion of the entire project
as executed. The dam constructed aimed to control flood, bring lands under irrigation, generate hydro electricity, navigation, fishing
and tourism which after the completion of the first phase is still unachieved and far from fulfilment. This paper is attempted to study the
objectives behind the construction of the project along with its achievements and unachieved goals. Changing natural habitat with
emphasis on the impact of the project over human life in the catchment area have been tried to determine through selected study of
respondents and using Remote Sensing techniques. The changes of LULC attributes within the catchment area in due course of time
have few striking characteristics along with increasing sufferings for the locals due to some changes in geo- economic environment.
4. Hydrological Characteristics
Figure 1: Location of Study area, (a) studied part for
evaluation of environmental characteristics. The operation of TBP and water diversion through Teesta-
(a) Mahananda Irrigation canal has made some serious changes
most security seeking border areas in India. With minimum in the hydrological character of Teesta below Gajoldoba
changes in Relief character and annual average rainfall barrage. During the dry months of a year the discharges are
fluctuates between 3000-3500mm [5] aided with sediments found to be decreasing during post dam period. A decrease
brought down by Teesta this area is dominated by paddy of about 88% is found after the operation of this Barrage.
cultivation. After the construction of Gajoldoba Barrage a decrease is
observed in case of lowest annual discharge about 85% [1].
This alteration within the fluvial regime has opened up a
3. Materials and Methods
greater scope of human intervention on the drier part within
the floodplain. With due course of time water demand in
A digital database dated 1991, 2001 and 2014 of Land sat
Teesta basin has been increased but the available water in
satellites has been used to evaluate the environmental
the stream decreased by 32% from 1995 to 2010 (69 billion
characteristics in terms of certain selected aspects. Mosaic
m3 to 47 billion m3) in the downstream of TBP has
operation has been done to subset the studied part after
transformed the area into such a region where the word
environmental correction is completed for all the images of
water scarcity can be tagged in.
concerned years to reduce the environmental noises for
better accuracy in EDRAS Imagine and Arc-Gis 10.2
environment. A comparison is also done between the
Table 1: Discharge characteristics of Teesta during pre and post barrage operation period. (Source- Fakrul and Higano, 2003)
Discharge in Cumec (m3/S) Discharge in Cumec (m3/S)
YEAR MAX MEAN MIN YEAR MAX MEAN MIN
1978-79 721 541 361 1988-89 667 397 127
1979-80 670 432 195 1989-90 645 409 173
1980-81 522 330 137 1990-91 729 427 125
1981-82 666 400 135 1991-92 653 391 135
1982-83 652 415 177 1993-94 453 296 138
1983-84 883 523 164 1994-95 633 412 190
1984-85 795 488 182 1995-96 459 252 44
1985-86 760 487 214 1996-97 478 259 39
1986-87 660 425 190 1997-98 672 353 34
1987-88 527 301 76 1998-99 364 200 36
5. Components of TBP link between Ganga and Brahmaputra under the 3rd phase.
The 1st phase was again divided into three stages which
The Teesta Barrage project is a large multipurpose water aimed to irrigate 546 thousand hectare land under the 1st
resources project in the state of West Bengal. The Project stage, 223 thousand hectare under the 2nd stage and 153
has three different phases and the Project envisages thousand hectare under the 3rd stage. The 1st phase of the
utilisation of potential of the Teesta River in the field of project started in the year 1976 and is proposed to be
irrigation, hydropower generation, navigation and flood completed by March‟2015 which is still under progress [8]
moderation. It planned to irrigate 922 thousand hectare land The 1st sub stage of Stage-I of Teesta Barrage Project
under the 1st phase, generation of 650 MW electricity in the envisages the following works:
2nd phase and it schemed navigational plan by envisaging
Author Profile
Baishali Mukherjee has received her B.Sc and M.Sc
Degree in Geography from University of Calcutta
(CU) and she stays in Sakherbajar, Kolkata. She is
Figure 5: LULC maps and areal occupation by different presently a research scholar at CU.
LULC attributes during 1991, 2001 and 2014.
8. Conclusion Ujwal Deep Saha has received his B.Sc and M.Sc
Degree in Geography from University of Calcutta (CU)
and he stays in Baruipur, Kolkata. He is presently a
Teesta Barrage has been declared as National Project. The Junior Research Fellow at CU.
total expenditure of the project up to March‟09 was 1236.01
Crores. The Planning has been done as per the guide lines of
the National Project. Besides, Irrigation & Waterways
department, being the nodal department has taken necessary
initiations for other activities as laid down in the guide line
of the National Project. As a whole the over ambitious
project is still far from reaching its real objectives. And
negative impacts on the associated environment are of great
concern from socio-economic perspective.
Reference
[1] A. Rahman, “Water scarcity-induced change in
vegetation cover along Teesta River catchments in
Bangladesh”, Master‟s Thesis in Physical Geography
and Quaternary Geology, Stockholm University,
XXXXV, 2013.
[2] D.C. Sarkar, B.K. Pramanik, A.I. Zerin, I. Ara,
“Climatic Impact Assessment of Teesta barrage Project
in Bangladesh”, International journal of Civil and
Environmental Engineering, II (1), February, 2006.