FIRE RISK ASSESSMENT

PROJECT UNPAVED ACCESS ROAD & RISK ASSESSMENT NO: 01


BARRIER (LAYDOWN)
ACTIVITY ROAD WORKS ASSESSMENT TEAM: WASEEM KHAN OHS
MANAGER,ABDUL BASIT
HSE ENGINEER
ASLAN ALTURK,PM
ASSESSMENT DATE:13-07-2024 REVIEW DATE:14-07-2024 ASSESSMENT APPROVAL:

HAZARD EFFECT Reduced


TASK HAZARD C L RISK MITIGATED BY C L
RISK
ALARP
(consequence)

1. Remove or significantly reduce


the storage quantity
Storing highly
2. Storing in fire resistant stores
inflammable
Fire Hazard Injury/Death 5 5 25 3. Separate from the ignition sources 3 2 6 Yes
substances in the
4. Ensure the substances are kept closed
premises
5. Provide adequate ventilation
6. Installation of fire detection and
suppression device
1. Improve the general housekeeping
Combustible 2. Improve the arrangement for
wastes
Fire Hazard Injury/Death 5 4 20 the disposal of wastes 3 2 6 Yes
accumulated in
3. Ensuring no contact with the fire
the premises
ignition sources
Carrying out the Fire Hazard Injury/Death 5 3 15 1. Implement the hot work permit system 3 2 6 Yes
Hot work 2. Conduct the work in
processes contained environment
3. Have a fire fighting equipment readily
accessible
4. Allow only trained workers to carry out
HAZARD EFFECT Reduced
TASK HAZARD C L RISK MITIGATED BY C L
RISK
ALARP
(consequence)
the hot work
1. Replace it with induction heaters
2. Ensure all appliances are used as
per manufacturer recommendation
Use of heating
Fire Hazard Injury/Death 4 4 16 3. Avoid combustible materials contact 3 2 6 Yes
appliances
with the heating appliance
4. Installing fire detection and suppression
device
1. Implementation of smoking policy
2. Ensure suitable arrangement to
Smoking in the
Fire Hazard Injury/Death 5 4 20 inform visitors 3 1 3 Yes
premises
3. Provide Smoking area in secured
environment
1. Replace faulty or damaged equipment
2. Ensure UL rated materials are used
3. Ensure installation of fire stop
Electrical Fire Fire Hazard Injury/Death 5 5 25 4. Ensure all fuses to correct rating
3 2 6 Yes
5. Installing fire detection and suppression
device
1. Implement proper security measures
2. Remove combustible material from
the vicinity of the building
Arson Fire Hazard Injury/Death 5 5 25 3 2 6 Yes
3. Proper visitor management system
4. Installing fire detection and suppression
device
Criteria: Consequence ( C ) Criteria: Likelihood ( L ) Risk Calculator Conclusions:
Negligible- Immediate return to work Improbable- So unlikely that it would not happen.
Risk level R= CxL Working on construction sites is a hazardous
Minor - First aid and return to work. Unlikely- Remote chance of event activity if the controls proposed are followed this
Moderate- Medical treatment/ lost time 1-3 Acceptable environment can be successfully managed.
Possible- Inattention may cause an event to happen.
4-6 Moderate
Major- Multiple injuries and Probable- Highly likely without control. Overall risk: Very High - High - Medium - Low
RIDDOR reportable
8-12 Substantial
Certain- Will happen without Intervention/control. 15-25 Intolerable
Fatal/Catastrophic- Death, loss of Are risks reduced to ALARP (as low
installation as reasonably practicable): Yes .

Likelihood→ Improbable Unlikely Possible Probable Certain


Consequence↓ 1 2 3 4 5
Negligible 1 1 2 3 4 5
Minor 2 2 4 6 8 10
Moderate 3 3 6 9 12 15
Major 4 4 8 12 16 20
Fatal/catastrophic 5 5 10 15 20 25

1-3 4-6 8-12 15-25


Low Medium High Very High