K-Electric Limited

Tractebel Engineering GmbH


Comments sent vide KE/TEG & NESPAK & RE2
Letter No. :_______________Date:_________________

900 MW BQPS-III Combined Cycle Plant & Associated Transmission


Projects PAKISTAN
Renewable Resources(Pvt.) LTD

The drawing / document has been checked to ensure compliance with the
Contract. The approval status shall be interpreted as laid down in the
Harbin Electric International Co., Ltd
Contract and shall not relieve the Contractor form his contractual
obligations.
Northeast Electric Power Design Institute CO.,LTD.
Cat. 1 [ ]APPROVED China Power Engineering Consulting Group
Cat. 2 [ ]APPROVED EXCEPT AS NOTED
Cat. 3 [ ]NOT APPROVED
Cat. 4 [ ]FOR INFORMATION ONLY
COMMENT SHEET NUMBER:_____________________________________

DATE:__________________________

SIGNATURES:__________________________________________________