Duration, Manpower
Duration, Manpower
Duration, Manpower
Civil Works
Sr No. Description
Replacement of Roof
13
Waterproofing System
Replacement of Roof
14
Waterproofing System
Replacement of Roof Waterproofing
15
System
Replacement of Roof Waterproofing
16
System
Replacement of Roof Waterproofing
17
System
Replacement of Roof Waterproofing
18
System
Modification of
20
Existing Modular Security Cabins
Modification of
22
Existing Modular Security Cabins
Labour
Description Unit Quantity
required
Saw cut to regular shape (squaring) the damaged area of the affected floor slab; Chip-off to
remove damaged concrete surfaces to a maximum depth of 10mm; Smoothen and level the
chipped-off surface by mechanical grinder; Clean thoroughly to remove dirt, dust and other
contaminants; Fill up the chipped-off floor with high quality epoxy screed (supply and
apply) up to the desired level to match with existing; Also include the repair of expansion M2 30 1+1
joints
Scraped-off and remove the existing epoxy resin coating and clean thoroughly; Reinstate
the floor finishing by applying heavy-duty flow applied/self-levelling epoxy resin flooring
(supply and apply) with a minimum thickness of 2mm;
Epoxy resin flooring works shall be re- applied at Medical Store Ground Floor
corridors/passageways (except on areas where pallet racks are fixed) and loading/unloading M2 1000 3+3
platform
Remove loose paints; clean thoroughly; Apply deep penetrating primer and 2 coats of
semi-gloss emulsion paint of color to match with existing (code 10B15 ivory or approved
equivalent) to internal walls of loading/unloading platform, entrance passage, exit passage
and room for reach truck/fork lift
M2 235 1+2
Clean thoroughly; Apply deep penetrating primer and 2 coats of matt emulsion paint of
color white to exposed ceiling soffit of loading/unloading platform, entrance passage, exit
passage, room for reach truck/fork lift and ceiling crack repair area M2 135 1+2
Remove loose and flaking paints; clean thoroughly; apply deep penetrating primer and 2
coats of weatherproof medium textured paint of color to match with existing (code 83451
or approved equivalent) to all external walls (including of roof parapet walls and duct M2 2400 3+3
houses)
Supply and fix ultra heavy-duty EPDM Rubber Bumper D-shape 152mm depth x152mm
high in 2 layers as wall protection at loading/unloading platform M 50 1+1
Supply and fix heavy-duty intermediary metal beams 2400mm length including fitting
accessories anchored to front and back vertical support of the pallet rack (36Nos) bottom
compartment to serve as an No 72 2+4
additional layer of shelf
Demolish existing concrete pad 1800 x 2400 x 200mm thick and cart away debris
No 1 2
Supply and lay imported fill materials to make up levels; Backfill must be done in layers of
not more than 150mm thick and compact properly to 95% MDD and to the approval of the M3 24 2
Engineer
Supply and install kerbstone including base preparation (levelling to desired slope and
compaction) M 6 1+1
Supply and install interlocking pavers 60mm thick including base preparation (levelling to
desired slope and compaction) M2 12 1+1
Shift and re-arrange the existing modular cabins as shown in the drawing
No 2
Supply and install powder coated heavy-duty aluminum door full double-glazed (6mm
thick clear glass each) with all accessories to complete No 1 Supplier
Remove existing fixed window and replace (supply and install) with powder coated
aluminum sliding window double-glazed (6mm thick clear glass each) with all accessories No 2 Supplier
to complete
Supply and install powder coated aluminum sliding window double-glazed (6mm thick
clear glass each) with all accessories to complete No 1 Supplier
Supply and apply UV resistant fiber reinforced liquid applied waterproofing membrane or
approved equivalent to roof of Cabin-2 M2 4 1+1
Duration in
Resources
(Days)
Hilti machine=1,
6 Grinder Machine=1,
Vaccum machine=1
20 Drill machine=1
Hilti machine=1,
8 Grinder Machine=1,
Vaccum machine=1
10 Hand Tools
6 Hand Tools
25 Hand Tools
4 Drill machine=1
Hilti machine=1,
Grinder Machine=1,
20
Drill Machine=1&
Welding machine=1
Hilti machine=1,
15
Hand Tools
10 Hand Tools & Cylinder
2 Hand tools
1 Hand tools
6 Hand tools
3 Hand tools
2 Hand Tools
3 Hand Tools
1 Hand Tools
1 Hand Tools
Crane
1 Hand Tools