5. AC WORK
5.1
Supply and install new (FCU ) fan coil unit chilled water as per existing unit
capacity in proposed ward room price should include necessary duct
No 8.000 -
modifications , replacement of valve package & bracket .
Remove existing drain line Supply & install new drain line copper pipe for all proposed Item
unit 1.000 -
Replacement of Supply & Install 2” dia., BS-1387 black steel chilled water pipes, to Item
connect from existing point on ceiling to New FCU unit with insulation 1.000 -
5.2 Duct Cleaning Carryout complete internal duct cleaning of air-conditioning Item
ducting in proposed ward connected to the Replaced AHU'S Supplying & Return
duct Include for cleaning/repainting of existing Air terminals/Diffusers/Grilles,
Note : work should be carry out be special contractor 1.000 -
TOTAL AMOUNT : -